LIU-PSB INTEGRATION LIGNE BI SITUATION ACTUELLE 19/07/2012LIU PSB Meeting J-M. LACROIX

Preview:

Citation preview

LIU-PSB

INTEGRATION LIGNE BISITUATION ACTUELLE

19/07/2012 LIU PSB Meeting J-M. LACROIX

SCAN ZONE INJECTION

19/07/2012 LIU PSB Meeting J-M. LACROIX

PLUSIEURS ZONES MAL DEFINIES

INFRASTRUCTURE ZONE INJECTION

19/07/2012 LIU PSB Meeting J-M. LACROIX

PAS DE MODELES 3D POUR:- CABLES ET ECHELLES A CABLES- CIRCUIT EAU + AZOTE- FAUX PLANCHERS (CAILLEBOTIS); ESCALIER METALLIQUE

ELEMENTS MACHINE ZONE INJECTION

19/07/2012 LIU PSB Meeting J-M. LACROIX

BIDIS

BI.SMV

QUELQUES ELEMENTS NON MODELISES

BI.SMHBI.KSW

GENIE CIVIL + ELEMENTS MACHINE + SCAN

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVEL AIMANT BI BVT

19/07/2012 LIU PSB Meeting J-M. LACROIX

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVEAUX PICK-UP’sUMA20; UMA30; UMA40; UMA50

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVEAU BI. DIS

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE SECTION DROITE 01

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVEAU BI. SMV

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATION

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATIONUMA20; UMA30; BI DIS

MANQUE SUPPORT DIPOLE

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATIONBI BVT; UMA40; UMA50

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATION BI BVT

ZONE A CONTROLER(CONNEXION EAU)

ACCESSIBILITE JOINTS ET COLLIERS ??

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATIONSECTION DROITE 01 ET BHZ 162

CHAMBRE A VIDE TROP LONGUE

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATIONSECTION DROITE 01

CAPOT A MODIFIER; MONTAGE COLLIER!

19/07/2012 LIU PSB Meeting J-M. LACROIX

NOUVELLE CONFIGURATIONSECTION DROITE 01

RESUME

19/07/2012 LIU PSB Meeting J-M. LACROIX

ATTENTE DU “SCAN” COMPLEMENTAIRE

PAS DE MODELES 3D POUR:- CABLES ET ECHELLES A CABLES (EN/EL)- CANALISATIONS Eau déminéralisée, eau de ville, azote (EN/CV)- FAUX PLANCHERS (CAILLEBOTIS); ESCALIER METALLIQUE (GS/SE)

MANQUE DE REFERENCES EN COORDONNEES CERN POUR IMPLANTATION PRECISE DE BI.DIS ET BI.SMV

NECESSITE D’ETUDIER LE SYSTEME VIDE DE CETTE LIGNE DANS ”SON ENSEMBLE”

SUPPORT BI.DHZ/DVT40 A ETUDIER

MODELES 3D POUR NOUVEAUX ELEMENTS:-BI.MQNDB50 et BI.MQNDB60-BI.DHZ/DVT50-BI.DHZ/DVT70 ?

PREVOIR MODIFICATION BI.MTV30 et CHAMBRE A VIDE EN AMONT