ALU 2G BTS Installation Guide Line

Embed Size (px)

Citation preview

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    1/43

    2G BTS Installation Guide Line

    Outdoor/Indoor

    200214-ed1

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    2/43

    -

    Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All othertrademarks are the property of their respective oners.

    !he information presented is su"#ect to change ithout notice. Alcatel-Lucent assumes no responsi"ility for

    inaccuracies contained herein.

    $opyright % 201&Alcatel-Lucent

    'dition 1.0

    (tatus) *eleased

    . .

    All rights reserved

    +assing on and copying of this document,

    se and communication of its contents is not permitted

    Without ritten authoriation from Alcatel-Lucent

    All rights reserved.

    +assing on and copying of this document,

    use and communication of its contents is not permitted

    ithout ritten authoriation from Alcatel-Lucent.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    3/43

    !a"le f $ontents

    1.Preliminary Information .....52.Scope ....53.Reference ....54.Document Change History ....6

    5 General Information

    5.1 Hardware Description .75.1.1 Rack Configuration 75.1.2 Weight and Dimensions 8

    5.2 Final State 96 Installing the Rack

    6.1 Rack Unpacking 106.2 Reversing the Rack Door (If Necessary On Site) .106.3 Positioning the Rack ..116.4 OPTION: Fixin on Concrete Floor..11

    &$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.

    AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    6.4.1 Drilling the Concrete .11

    6.4.2 Fixing to the Concrete Floor 126.5 OPTION : Fixing to the Raised Floor .12

    5.5.1 Drilling the Raised Floor 125.5.2 Fixing to the Raised Floor .13

    6.6 OPTION : Fixing to the Wall .135.6.1 Wall Drilling .135.6.2 Fixing to the Wall 14

    6.7 Preparing the Site Cable Tray and the Metal Sheath ...147 Installing the Power Supply Cables

    7.1 General Cabling View 15

    7.2 Installing the Cables in the Cable Tray 167.3 Protective Earth Cable ...167.4 Rack Side Power Cable Connections .177.5 Site Side Power Cable Connections (48 V) ..187.6 Power Supply Testing 19

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    4/43

    8 Installing the PCM Cables8.1 Installing Cable in Cable Tray ..20

    8.2 Rack Side Connection .208.2.1 Prepare the PCM Cables ...208.2.2 Connect the Cables to the Rack ..218.2.3 L907/ 4 120 - Ohm Cable (Alcatel-Lucent Kits) .218.2.4 FLEX3 / 4 - 75 Ohm Coaxial Cable (Alcatel-Lucent Kits) ....22

    9 Installing the Antenna Jumpers9.1 Antenna General Scheme ..23

    9.2 Connection to the Feeder Termination ..249.3 Connection to the BTS Rack ..24

    10 Installing the Alarm Cables (Options)10.1 Installing the Cables (Option) ...2510.2 Rack Side Connection ..26

    4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.

    AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    11.1 Configuration of Cabling ...28

    11.2 Installation 2912 Finishing Installation

    12.1 Finishing Installation of the Metallic Sheath .2912.2 Finishing 31

    Appendix: Installation Pictures ..32Appendix : Abbreviations 37

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    5/43

    -

    1. Preliminary Information

    General information

    The product specification and/or performance levels contained in this document are for

    information purposes only and are subject to change without notice. They do not

    represent any obligation on the part of Alcatel-Lucent.

    Service Personnel Skill

    Service Personnel must have an adequate technical background on telecommunications

    and in particular on the equipment subject of this handbook.

    An adequate background is required to properly install, operate and maintain

    equipment. The fact of merely reading this handbook is considered as not enough.

    Safety recommendation

    The safety recommendations here below must be considered to avoid injuries on persons

    and/or damage to the equipment:

    Service Personnel

    Installation and service must be carried out by authorized persons having appropriate

    technical training and experience necessary to be aware of hazardous operations during

    installation and service, so as to prevent any personal injury or danger to

    other persons, as well as prevent damaging the equipment.

    Access to the Equipment

    Access to the Equipment in use must be restricted to Service Personnel only.

    . .

    All rights reserved

    +assing on and copying of this document,

    se and communication of its contents is not permitted

    Without ritten authoriation from Alcatel-Lucent

    aey ues

    Recommended safety rules are indicated in part (5-Safety , EMC, EMF, ESD Norms

    and Equipment Labelling). Local safety regulations must be used if mandatory. Safety

    instructions in this handbook should be used in addition to the local safety

    regulations. In case of conflict between safety instructions stated in this manual and

    those indicated in local regulations, mandatory local norms will prevail. Should not

    local regulations be mandatory, then safety rules stated in this manual will prevail.

    2. Scope

    This Document aims to describe the hardware of 2G (9100 BTS DC Indoor Evolution)

    3. Reference

    Alcatel -Lucent 9100 BTS Evolution installation manual in MBO cabinet

    8

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    6/43

    -

    4. Document Change History

    Edition Number Reason and description of change Affected Page Effective date

    0.1 Draft edition All 02-02-2014

    1.0 First edition of document formally revised All 20-02-2014

    . .

    All rights reserved

    +assing on and copying of this document,

    se and communication of its contents is not permitted

    Without ritten authoriation from Alcatel-Lucent

    9

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    7/43

    5.1 Hardware Description

    5.1.1 Rack on!i"uration

    :$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.

    AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    Figure 1: Example of Mini DC Indoor 9100 BTS (Left and Medi DC 9100 BTS (!ig"t

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    8/43

    5.1.2 #ei"$t and Di%ensions

    ;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.

    AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    9/43

    5.2 &inal State

    !he rack is ready for commissioning

    !he rack is not poered up.

    1? at the

    top of the rack.

    1

    4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    '.3 )reparin" t$e Site a4le Tra and t$e etal S$eat$

    )rocedure* 7ake a cut-out in the ca"le ay for the ca"les ith metal sheath >(ee @igure 1'?

    7ake a cut-out in the ca"le ay for the antenna #umpers

    'dge the cut-outs ith edge protection

    @i provisory the metal sheath to the ca"le ay >(ee @igure 1?.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    15/43

    3 Installin" t$e )ower Suppl a4les

    3.1 General a4lin" 6iew

    1

    8$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    16/43

    3.2 Installin" t$e a4les in t$e a4le Tra

    nstall yelloD green ca"le

    nstall poer ca"le

    Attach ca"le

    $ut the ca"le at good length

    $rimp a ire terminal)Ter%inals on t$e rack side)

    35 ) ; mm

    CA! A ) 9 mm

    CA! C ) 9 mm

    CA!*'! ) 9 mm

    Ter%inals on t$e power 4o )

    depending on site

    1

    9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    3.0 )rotecti+e 7art$ a4le onnection

    $rimp an adapted ire terminal at site etremity

    $onnect the protective earth ca"le to the site earth plate

    +ass the ca"les to the metal sheath

    $onnect earth ca"le at rackBs top$rimp a ; mm ire terminal at C!( etremity of earth ca"le

    $onnect the 35 ca"le to the stud top rack on the rack >7;?

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    17/43

    +ass the 35 ca"le through the metal sheath

    $rimp an 7; ire terminal on the 35 ca"le

    @it a ru""er sleeve on the ire terminal

    $onnect the 35 ca"le to the stud of the C!( >(ee (tep 2?

    At the site side, cut the ca"le and crimp a ire terminal on the 35 ca"le >diameter depending

    on site? >(ee (tep &?

    @it a ru""er sleeve on the ire terminal

    $onnect the 35 ca"le to the site earth plate >(ee (tep 9?.

    3. Rack Side )ower a4le onnections

    1

    :$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    18/43

    )rocedure* +ass the 4; poer ca"les through the metal sheath

    *emove the ru""er caps from the poer supply terminals on the rack

    +ass the ca"les into the ru""er caps >(ee Steps 1 to ?

    $rimp 79 terminals on the ca"les

    @it a ru""er sleeve on the ire terminal

    $onnect the 4; ca"les to the studs of the C!()

    Clack insulated conductor to the 0 terminal

    Clue insulated conductor to the - 4; terminal

    @it the ru""er caps on the poer terminals.

    3.5 Site Side )ower a4le onnections ,8 6

    1

    ;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    )rocedure* n the site side, cut the 4; ca"les and crimp on a lug >diameter depending on site?

    @it a ru""er sleeve on the terminal lug

    $onnect the 4; ca"le to the site "reakers

    La"el the 4; ca"les and the site poer "o.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    19/43

    3.' )ower Suppl Testin"

    )rocedure* $heck that all the rack "reakers are sitched off

    At the rack, test for short circuit "eteen 0 and - 4;

    1

    (ee @igure #0?

    At the poer "o, sitch off the fuse "reakers

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    20/43

    8.1 Installin" a4le in a4le Tra

    nstall ca"les in +$7 compartment of ca"le tray

    Attach ca"les ith plastic ca"le ties

    La"el the ca"les ith la"els supplied

    +ass the +$7 ca"les through the metal sheath.

    )rocedure* Se)tion 1*& for

    the num"er of +$7 ca"les

    to install

    +erform ste s 1 to 4.

    2

    0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    8.2 Rack Side onnection

    8.2.1 )repare t$e ) a4les

    )rocedure* *emove 2 cm of outer insulation near the metal sheath fiing point on each +$7 ca"le >(ee

    @igure #1?

    +repare the ca"le termination

    @it a ru""er sleeve >4? >(ee @igure ##?

    La"el the ca"les >(ee @igure ##?.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    21/43

    8.2.2 onnect t$e a4les to t$e Rack

    2

    1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    8.2.0 L9:3/ 12: ; O$% a4le ,

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    22/43

    2

    2$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    )rocedure* *emove the lightning protection "lock >2 in @igure 22?

    nsert the ires in the terminal "lock >1 in @igure 22?>to avoid cutting pro"lems os short

    circuits, take the ire ith the first hand and insert it ith the other hand?

    @it the lightning protection "lock

    !ie the ca"les to the rack >ith adhesive tie "locks?.

    8.2. &L7>0 / ; 35 O$% oaial a4le ,1 in @igure 22?

    @it the lightning protection "lock

    !ie the ca"les to the rack >ith adhesive tie "locks?.

    @it (+27 :8 - ohm adapters to su" - 5 connectors >positions 4 and 8 in @igure 22?

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    23/43

    9 Installin" t$e

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    24/43

    9.2 onnection to t$e &eeder Ter%ination

    f the feeders are not la"eled)

    nform the customer

    5o not connect the #umpers

    $omplete the $$L

    2

    4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    )rocedure* *efer to Information !e+uired (Se)tion 1*&1 for ca"le connections

    La"el the antenna #umpers at each end >(ee @igure #,?

    $onnect the antenna #umpers to the feeders >(ee @igure #&?.

    9.0 onnection to t$e BTS Rack

    )rocedure* Lead the #umpers through the cut-outs in the ca"le tray

    'nsure that hte "ending radius of each ca"le is at least & cm

    se the plastic ties to "undle the ca"les together

    !ighten ith special tightening tool >(ee !ools catalogue?.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    25/43

    1: Installin" t$e

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    26/43

    1:.2 Rack Side onnection

    2

    9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    27/43

    )rocedure* *efer to Information !e+uired (Se)tion 1*& in )"apter 1 for t"e )a-le connections

    and the =uantity of alarms to "e connected.

    @rom the end of the sheathing, "undle the ca"les together and attach them ith

    ca"le ties.

    @it a ru""er sleeve on ire terminations

    nsert the ires into the connectors)

    E

    2

    :$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    $onnector >2? E input alarms < to 19

    $onnector >&? E input alarms 1: to 24$onnector >4? E output alarms >not used?

    !ie the ca"les to the rack

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    28/43

    11 Installin" t$e Snc$roni@ation a4les ,Option

    11 .1 on!i"uration o! a4lin"

    2

    ;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    29/43

    11.2 Installation

    )rocedure* $hoose the right configuration >(ee @igures .' to .,

    *un the synchroniation ca"les in the site ca"le tray

    +ass the ca"les through the metal sheath

    La"el the ca"les ith la"els supplied

    2

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    30/43

    &

    0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    )rocedure* (tretch the metallic sheath "eteen the vertical cutout in the ca"le trayand the C!( rack >(ee @igure .9*

    @i the metallic sheath to the ca"le tray ith one stove scre >(ee @igure .9*

    $ut the metallic sheath to the right length >F1?.

    @i a lug to the metallic sheath if necessary.

    $onnect the metallic sheath tot he rack >(ee @igure '0*

    !ighten the stripped +$7 ca"le shielding to the sheath using the metallic tie.

    rap provided in the kit >(ee @igure '0**

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    31/43

    12.2 &inis$in"

    &

    1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

    )rocedure* Affi the G C!( (!A!3 G and G 3 G la"els to the door of the C!(

    $lear aay packagingLeave the site tidy

    Leave the C!( door key

    $lean the site.

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    32/43

    Pictorial Elaboration:

    &

    2$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    33/43

    &

    &$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    34/43

    &

    4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    35/43

    &

    8$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    36/43

    &

    9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    37/43

    &

    :$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    38/43

    &

    ;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    39/43

    &

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    40/43

    4

    0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    41/43

    4

    1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    42/43

  • 8/12/2019 ALU 2G BTS Installation Guide Line

    43/43

    -. .

    All rights reserved

    +assing on and copying of this document,

    se and communication of its contents is not permitted

    Without ritten authoriation from Alcatel-Lucent