5/20/2018 Dual HS Trial for KPNG05 v2.0
1/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 1
Maxis Network Strategy
Dual-HS Trial
April 2010
5/20/2018 Dual HS Trial for KPNG05 v2.0
2/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 2
Trial Summary
Timeline:
14thFebruaryChinese New Year (lower traffic week)
22ndFebruaryHSDPA activated on 1st& 2ndcarrier
Location:
RNC KPNG05
Ampang / Cheras / East KL area
HSPA Status
14thFebruary17 Sites with Dual-HS (R+H)
22ndFebruary260 sites with Dual-HS (H+H)
Conclusions
As expected
5/20/2018 Dual HS Trial for KPNG05 v2.0
3/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 3
Balanced Load
Users can be spread across all carriers with load balancing
Conf i rmed
Improved PS CSSR KPI
No DRD PS calls setup on single carrier
PS CSSR actu al ly degraded due to IUB link qu ali ty
Maximizes HS Capacity
HSPA traffic uses all remaining resources after CS requirement
Confirmed
Maximizes HS Performance
HSPA USIC
Cell throughput & volume increase
Confirmed
Advantages of HS on all Carriers
5/20/2018 Dual HS Trial for KPNG05 v2.0
4/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 4
RF Coverage / Quality
HSDPA degrades EcNo which leads to loss of good coverage quadrant (RSCP > -95, EcNo >
-12)
Conf irmed
Degraded RF Degraded KPIs
ALL KPIs could degrade due to more chance of RF failures and potential congestion
Conf irmed
More CS traffic pushed to 2G network
Conf irmed
Less CS traffic on 3G network
Conf irmed
Disadvantages of HS on all Carriers - #1
5/20/2018 Dual HS Trial for KPNG05 v2.0
5/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 5
Network Concerns
Can current transmission / backhaul handle additional HS traffic if dual/tri-HS implemented?
Highl ighted current w eakness in IUB
Can 2G network support additional CS traffic?
2G performance and cus tomer experience impacted
Can current RNC support extra traffic? (analyzing as part of re-home exercise and all
approaching maximum capacity)
Capacity r eaching maxim um at end of 2010 with exist ing traf f ic, +45% addit ional traf fic
requires further expansion
RF coverage & quality improving but still requires more work before degrade with HS.
RF qual i ty and amou nt of fa i lures inc reased after act ivat ion
Disadvantages of HS on all Carriers - #2
5/20/2018 Dual HS Trial for KPNG05 v2.0
6/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 6
RF Coverage / Quality
Summary:
HSDPA degrades EcNo which
leads to loss of good coverage
quadrant
RSCP shows no obvious
degradation
~22% loss of coverage
10.85%
65.65% 23.5%
1.96%87.11%
10.93%
IRAT:
~9% of current PS R99
coverage will be lost to
GPRS/EDGE
~22% of current CS R99
coverage will be lost to 2G
5/20/2018 Dual HS Trial for KPNG05 v2.0
7/45HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 7
RF Quality - EcNo
KPNG05Dec 09
KPNG05
Feb 10
Black = PS IRAT
BSC ERIS02
5/20/2018 Dual HS Trial for KPNG05 v2.0
8/45HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 8
AMR CSSR & DCR
AMR CSSR:
Call failures increase by ~48%
CSSR degrades by ~1%
AMR DCR:
Call drops increase by 6%
DCR degrades by ~0.05%
Voice CSSR %
94.50%95.00%95.50%96.00%96.50%97.00%97.50%98.00%98.50%99.00%99.50%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Fe
b
13-Fe
b
15-Fe
b
17-Fe
b
19-Fe
b
21-Fe
b
23-Fe
b
25-Fe
b
27-Fe
b
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-M
ar
13-M
ar
Dual HS activation
Voice Call Drop %
0.00%
0.10%
0.20%
0.30%
0.40%
0.50%
0.60%
0.70%
0.80%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-Mar
5-M
ar
7-Mar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
9/45HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 9
VP CSSR & DCR
Video CSSR %
94.50%95.00%95.50%96.00%96.50%97.00%97.50%98.00%98.50%99.00%99.50%
18-Ja
n
20-Ja
n
22-Ja
n
24-Ja
n
26-Jan
28-Ja
n
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Fe
b
13-Fe
b
15-Fe
b
17-Fe
b
19-Fe
b
21-Fe
b
23-Fe
b
25-Fe
b
27-Fe
b
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-M
ar
13-M
ar
Dual HS activation
CNY Holiday
VP CSSR:
Call failures increase by ~48%
CSSR degrades by ~1%
VP DCR:
Call drops increase by ~15%
DCR degrades by ~0.2%
Video DCR %
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
1.20%
1.40%
1.60%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
10/45HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 10
CS Erlangs
0
10000
20000
30000
40000
50000
60000
70000
18-Ja
n
20-Ja
n
22-Ja
n
24-Ja
n
26-Ja
n
28-Ja
n
30-Ja
n
1-Feb
3-Feb
5-Feb
7-Feb
9-Feb
11-Fe
b
13-Fe
b
15-Fe
b
17-Fe
b
19-Fe
b
21-Fe
b
23-Fe
b
25-Fe
b
27-Fe
b
1-Mar
3-Mar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
IRAT per Call (%)
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-Mar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
CS Traffic & IRAT Attempts
Dual HS activation
CNY Holiday
CS Traffic:
Call traffic decreased from 50,000
to 45,000 erlangs (~10%)
IRAT
IRATs per call increase 17%
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
11/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 11
2G Traffic
0
2000
4000
6000
8000
10000
12000
18/01/2010
20/01/2010
22/01/2010
24/01/2010
26/01/2010
28/01/2010
30/01/2010
01/02/2010
03/02/2010
05/02/2010
07/02/2010
09/02/2010
11/02/2010
13/02/2010
15/02/2010
17/02/2010
19/02/2010
21/02/2010
23/02/2010
25/02/2010
27/02/2010
01/03/2010
03/03/2010
05/03/2010
07/03/2010
09/03/2010
11/03/2010
13/03/2010
Erlang
2G Traffic:
Significant traffic increased in BSC-ERIS02
Total voice traffic increased by 11% for
BSC-ERIS02
Traffic for BSC-ERIS02
CNY40000
45000
50000
55000
60000
65000
70000
75000
80000
18/01/2010
20/01/2010
22/01/2010
24/01/2010
26/01/2010
28/01/2010
30/01/2010
01/02/2010
03/02/2010
05/02/2010
07/02/2010
09/02/2010
11/02/2010
13/02/2010
15/02/2010
17/02/2010
19/02/2010
21/02/2010
23/02/2010
25/02/2010
27/02/2010
01/03/2010
03/03/2010
05/03/2010
07/03/2010
09/03/2010
11/03/2010
13/03/2010
Traffic for BSC under RNCKPNG05
CNY
5/20/2018 Dual HS Trial for KPNG05 v2.0
12/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 12
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
18/01/2010
20/01/2010
22/01/2010
24/01/2010
26/01/2010
28/01/2010
30/01/2010
01/02/2010
03/02/2010
05/02/2010
07/02/2010
09/02/2010
11/02/2010
13/02/2010
15/02/2010
17/02/2010
19/02/2010
21/02/2010
23/02/2010
25/02/2010
27/02/2010
01/03/2010
03/03/2010
05/03/2010
07/03/2010
09/03/2010
11/03/2010
13/03/2010
2G DCR and Blocking
BSC-ERIS02 Blocking
2G Drop and Block: BSC-ERIS02 has the worst performance
Drop call rate increased from 0.9% to 1%
Blocking rate also increased
CNY
0.60%
0.70%
0.80%
0.90%
1.00%
1.10%
1.20%
18/01/2010
20/01/2010
22/01/2010
24/01/2010
26/01/2010
28/01/2010
30/01/2010
01/02/2010
03/02/2010
05/02/2010
07/02/2010
09/02/2010
11/02/2010
13/02/2010
15/02/2010
17/02/2010
19/02/2010
21/02/2010
23/02/2010
25/02/2010
27/02/2010
01/03/2010
03/03/2010
05/03/2010
07/03/2010
09/03/2010
11/03/2010
13/03/2010
BSC-ERIS02 Drop Call Rate
5/20/2018 Dual HS Trial for KPNG05 v2.0
13/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 13
PS CSSR & DCR
PS CSSR %
80.00%
85.00%
90.00%
95.00%
100.00%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Feb
3-Feb
5-Feb
7-Feb
9-Feb
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-Mar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
PS CSSR:
Call failures increase by ~40%
CSSR degrades by ~1.4%
PS DCR:
Call drops decrease by 27%
DCR improves by ~0.4%
PS DCR %
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
14/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 14
PS DCR
PS DCR:
The sudden surge of PS Drop
between 28-Jan to 4-Feb is due to
SAPUMU which having SNTPalarm during that period.
Currently the site has been
normalized.
PS DCR %
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Feb
3-Feb
5-Feb
7-Feb
9-Feb
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-Mar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
15/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 15
HS Traffic MBytes
HSPA Total MBytes
0
1000000
2000000
3000000
4000000
5000000
18-Ja
n
20-Ja
n
22-Ja
n
24-Ja
n
26-Ja
n
28-Ja
n
30-Ja
n
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Fe
b
13-Fe
b
15-Fe
b
17-Fe
b
19-Fe
b
21-Fe
b
23-Fe
b
25-Fe
b
27-Fe
b
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-M
ar
13-M
ar
HSDPA HSUPA
Dual HS activation
CNY Holiday
HSDPA
Total Mbytes increase by ~45%
From 2,613,429 to 3,778,993 (+1,165,565 MBytes)
HSUPA
Total Mbytes increase by ~46%
From 258,118 to 375,504 (+117,386 MBytes)
5/20/2018 Dual HS Trial for KPNG05 v2.0
16/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 16
HS Mean Channel Throughput
HSPA Mean Throughput
0
100
200
300
400
500
600
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
HSDPA HSUPA
HSDPA
Total throughput increases by ~45%
From 354kbps to 512 kbps (+158 kbps)
HSUPA
Total Mbytes increase by ~20%
From 33kbps to 40 kbps (+7 kbps)
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
17/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 17
HS Mean UE
HSDPA
Total user numbers increases by ~13%
From 4,258 to 4810 (+552 users)
HSUPA
Total user numbers increase by ~23%
From 2,045 to 2,524 (+478 users)
HSPA Mean User
0
1000
2000
3000
4000
5000
6000
18-Jan20
-Jan22
-Jan24
-Jan26
-Jan28
-Jan30
-Jan1-Feb
3-Feb
5-Feb7-Feb
9-Feb11
-Feb13
-Feb15
-Feb17
-Feb19
-Feb21
-Feb23
-Feb25
-Feb27
-Feb1-Mar
3-Mar
5-Mar
7-Mar
9-Mar11
-Mar13
-Mar
HSDPA HSUPA
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
18/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 18
AMR CSSR & DCR (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
19/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 19
VP CSSR & DCR (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
20/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 20
CS Traffic & IRAT Attempts (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
CS Traffic:
Overall, other RNCs are maintaining the
similar CS Traffic.
However, the CS Traffic for RNC105 is
reduced after Dual HS activation, which
could be due to more IRAT to 2G (as shown
in IRAT per Call)
IRAT per Call:
RNC105 is having increased of IRAT per call
after Dual HS activation, whereas other
RNCs still maintain the similar trend.
5/20/2018 Dual HS Trial for KPNG05 v2.0
21/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 21
PS CSSR & DCR (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
22/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 22
HS Traffic MBytes (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
23/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 23
HS Mean Channel Throughput (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
24/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 24
HS Mean UE (RNC Comparison)
Dual HS activationCNY Holiday
Dual HS activationCNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
25/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 25
Congestion - RRC
RRC Failures:
Failures due to congestion increase by
16%
Failures due to RF increase 13%
Failures due to RL (IUB related) increase
493%
RRC Congestion Failures
0
200000
400000
600000
800000
1000000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
VS.RRC.Rej.Power.Cong VS.RRC.Rej.Code.Cong VS.RRC.Rej.RL.Fai l
RRC.FailConnEstab.NoReply VS.RRC.Rej.UL.CE.Cong VS.RRC.Rej.DL.CE.Cong
VS.RRC.Rej.ULIUBBandCong VS.RRC.Rej.DLIUBBandCong
RRC Failures due to Congestion
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
18
-Jan
20
-Jan
22
-Jan
24
-Jan
26
-Jan
28
-Jan
30
-Jan
1
-Feb
3
-Feb
5
-Feb
7
-Feb
9
-Feb
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1
-Mar
3
-Mar
5
-Mar
7
-Mar
9
-Mar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
26/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 26
RRC Failures NEW
RRC Failures due to Congestion
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,00090,000
100,000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
27/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 27
RRC Failures exclude CNY NEW
RRC Failures due to Congestion
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,00090,000
100,000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
28/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 28
Congestion RAB
RAB Failures:
CS RAB Failures due to congestion
decrease by 36%
PS RAB Failures due to congestion
increase by 39% (spike excluded)
CS RAB Failures due to Congestion
0
500
1000
1500
2000
18-Ja
n
20-Ja
n
22-Jan
24-Ja
n
26-Ja
n
28-Ja
n
30-Jan
1
-Feb
3
-Feb
5
-Feb
7
-Feb
9
-Feb
11
-Feb
13
-Feb
15
-Feb
17
-Feb
19
-Feb
21
-Feb
23
-Feb
25
-Feb
27
-Feb
1
-Mar
3
-Mar
5
-Mar
7
-Mar
9
-Mar
11
-Mar
13
-Mar
Dual HS activation
CNY Holiday
PS RAB Failures due to Congestion
0
100000
200000
300000
400000
500000
600000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
5/20/2018 Dual HS Trial for KPNG05 v2.0
29/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 29
CS RAB Failures NEW
CS RAB Failures due to Congestion
0
500
1000
1500
2000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
30/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 30
CS RAB Failures exclude CNY NEW
CS RAB Failures due to Congestion
0
500
1000
1500
2000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
31/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 31
CS RAB Failures - Congestion Breakdown NEW
CS RAB Failures due to Congestion
0
500
1000
1500
2000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
CS RAB F il C i B kd
5/20/2018 Dual HS Trial for KPNG05 v2.0
32/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 32
CS RAB Failures - Congestion Breakdown
exclude CNYNEW
CS RAB Failures due to Congestion
0
500
1000
1500
2000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-M
ar
3-M
ar
5-M
ar
7-M
ar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
33/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 33
PS RAB Failures NEW
PS RAB Failures due to Congestion
0
100000
200000
300000
400000
500000
600000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY
Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
34/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 34
PS RAB Failures exclude CNY NEW
PS RAB Failures due to Congestion
0
100000
200000
300000
400000
500000
600000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY
Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
35/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 35
PS RAB Failures - Congestion Breakdown NEW
PS RAB Failures due to Congestion
0
100000
200000
300000
400000
500000
600000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY
Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
PS RAB F il C ti B kd
5/20/2018 Dual HS Trial for KPNG05 v2.0
36/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 36
PS RAB Failures - Congestion Breakdown
exclude CNYNEW
PS RAB Failures due to Congestion
0
100000
200000
300000
400000
500000
600000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-Mar
11-Mar
13-Mar
Dual HS activation
CNY
Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
37/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 37
RNC Capacity
Current 2010 Traffic:
Existing traffic requires 2 new RNCs to be deployed with additional re-homing of Node Bs to cater for current
demand
2010 Expansion Plan
Will have to be reviewed to cater for additional traffic6 out of 8 RNCs will exceed capacity
2011 Traffic Profile
High Capacity RNC needed or double amount of existing RNCs.
Current 2010 Expansion 2010 + 45% DH 2011 2011 + 45% DH
RNC Total Throughput Total Throughput Total Throughput Total Throughput Total Throughput
RNCSHTI02 3,185 2,209 3,204 3,789 5,494
RNCRWNG01 2,872 3,366 4,880 5,773 8,370
RNCKPNG04 2,671 3,135 4,545 5,376 7,795
RNCBESI03 2,512 1,811 2,625 3,105 4,503
RNCKPNG05 3,281 2,932 4,252 5,029 7,292
RNCNILA04 4,420 3,148 4,565 5,400 7,829
New RNC A - 3,429 4,973 5,882 8,528
New RNC B - 3,644 5,283 6,249 9,061
TPUT @ 80% Loading* SHTI02, KPNG05 & NILA04 require expansion in 2010
* Current Maximum capacity is 3.9Gb
* 2011 requires more RNC or higher capacity RNC
5/20/2018 Dual HS Trial for KPNG05 v2.0
38/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 38
Thank You!
5/20/2018 Dual HS Trial for KPNG05 v2.0
39/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 39
RTWP & TCP
TCP
The TCP decrease from avg 37.44 to avg
36.36
RTWP The RTWP increase from avg -103.25 to
avg -101.34
Dual HS activation
CNY Holiday
Dual HS activation
CNY Holiday
NEW
5/20/2018 Dual HS Trial for KPNG05 v2.0
40/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 40
RRC Failures - Congestion Breakdown NEW
RRC Failures due to Congestion
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,00090,000
100,000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 19days before and
18days after Dual HS Activation
9thMarch was excluded due to the spike
RRC Failures Congestion Breakdown
5/20/2018 Dual HS Trial for KPNG05 v2.0
41/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 41
RRC Failures - Congestion Breakdown
exclude CNYNEW
RRC Failures due to Congestion
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,00090,000
100,000
18-Jan
20-Jan
22-Jan
24-Jan
26-Jan
28-Jan
30-Jan
1-Fe
b
3-Fe
b
5-Fe
b
7-Fe
b
9-Fe
b
11-Feb
13-Feb
15-Feb
17-Feb
19-Feb
21-Feb
23-Feb
25-Feb
27-Feb
1-Mar
3-M
ar
5-Mar
7-Mar
9-M
ar
11-Mar
13-Mar
Dual HS activation
CNY Holiday
NOTE:
Comparison was made 18days before and
18days after Dual HS Activation
26thJan & 9thMarch was excluded due to
the spike
5/20/2018 Dual HS Trial for KPNG05 v2.0
42/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 42
3rdCarrier & SKMM
2ndHS layer is required now
F1 under utilized could impact future license agreements with SKMM, need to show real
need for U900 persuasion.
KV 3rdcarrier upgrades on-going
RAN 11 Features (for R+H+H) DRD fallbackimproves PS CSSR KPI and allows marginal users to get PS service
Uplink Macro Diversity Intelligent Receiving: Improves resource utilization for CE &
IUB by reducing SHO overhead requirement
Dynamic Power Sharing of Multi-Carriers: Allows HS to use power resources from 1st
carrier when CS traffic is low. Can only share 2 carriers at the moment but suitable
for current network strategy
Proposals to maximize HS capacity and minimize CS impact
5/20/2018 Dual HS Trial for KPNG05 v2.0
43/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 43
U900
Well known expected deployment to be used as complete primary network layer in future
Must be planned & deployed carefully & correctly, otherwise capacity will be impacted, not used for quick
capacity island site fixes.
Expect to be used as combined CS + HS layer and manage / balance U900 capable devices to this layer
will further improve capacity for 2100.
Dual / Tri-HS is coming, the question will be when?
Activate after Dec FA - 2010 optimization plan designed to improve 3G network and prepare for U900 /
HSPA+ deployment. Stabilize network this year, utilize current resources (3rdcarrier & RAN11 features) and
prepare for full HSPA+ deployment in 2011 and beyond
Activate after June PA
Attempt to over-achieve PA and request 6 month stability & best-effort optimizationperiod to balance performance & user experience
2011 and beyond network should be considered now i.e. transmission, RNC / NB capacity, borders etc.
Proposals to maximize HS capacity and minimize CS impact
5/20/2018 Dual HS Trial for KPNG05 v2.0
44/45
HUAWEI TECHNOLOGIES CO., LTD. Confidential Page 44
Pa e 44
Uplink Macro Diversity Intelligent Receiving
Non serving cellServing Cell
Resource
s forservice
RNCControl channel of user 1
Data channel of user1
CE/Demodulation
/ Transmission
resource w/t MDC
UE NodeB HW RNC HW SW License Other SW CN Time
RNC HSUPA Intro. Pack. 0903
NOTE
: not involved: involved
BenefitsSaves the CE resources and transmission resources for high-speed non-real-time
servicesof non-serving NodeB, improves resource efficiency
CE/Demodulation /
Transmission
resource w/o MDC
Data channel preempted
By user 2
5/20/2018 Dual HS Trial for KPNG05 v2.0
45/45
Dynamic Power Sharing of Multi-Carriers
Application Scenario: Among multiple carriers, the carrier bearing HSPA service can
dynamically share the unused power resource of another carrier. This function
increases the utilization of the power amplifier as well as the HSPA service rate of
the cell.
Benefits
The capacity of the HSDPA cell increases by 5%-6%with only software upgrade
UE NodeB HW RNC HW SW License Other SW CN Time
NodeB 0903
power power
f2 R99+HSPA
f1 R99 f1 R99
Single directionSharing Scale
R99+HSPA carrier shares R99 carrier vacancy power
R99 vacancy power
f2 R99+HSPA
Note: In RAN11.0,only 2 carriers can be shared