    Stage III (1 X 500 MW)

    STATUSYES / NO

    22 Confirm pressure gauges and instruments are provided as

    per approved drawings.

    23 Confirm satisfactory operation of the relief valve.

    24 Confirm for no leakages from mechanical seals.

    25 As soon as the pump can be operated as part of a

    system, run the pump for preferably 8 hours to verify

    that vibration levels are within acceptable limits.

    26 Monitor the following parameters and record the stable

    levels:

    A Pump Suction Pressure

    B Pump Discharge Pressure

    C Pump Speed

    D Pump flow

    E Pump Inboard Bearing Temperature

    F Pump Outboard Bearing Temperature

    G Pump Inboard Bearing Vibrat ion

    H Pump Outboard bearing Vibration

    I Motor Starting Current and run Up time

    Signature

    Electrical

    Mechanical

    C&IElectrical

    Mechanical

    C&I

    STANDARD CHECK LIST SHEET 3OF 3STATION : NTPC - Ramagundam

    PLANT ITEM : HFO PRESSURISING PUMP

    PLANT NOMENCLATURE:

    LOCATION: FUEL OIL PUMP HOUSE

    REF:

    Sl.No. ACTIVITY / CHECKS REMARK

    Agency Name Date

    N

    TPC

    E

    rec.

    NTPC

    Comg.

    Contractor

  • 7/31/2019 HFO Pressurising Pump

    3/3

    Stage III (1 X 500 MW)

    STATUSYES / NO

    1 Access to the plant item is adequate.

    2 Illumination in the plant area is adequate.

    3 Any other requisite safety provision is adequate

    for immediate commissioning activity.

    4 Plant item is in a clean condi tion.

    5 The name plant legend and tag no.agrees with theapproved NTPC drawing and is clearly visible, properly

    fixed.

    6 Equipment is properly supported as per drawing, if

    applicable.

    7 Any damage to the equipment and its constituents.

    8 All necessary locks and keys for pad-locks,

    interlocks etc., are available.

    9 Hot surfaces lagged or screened sufficiently

    to provide protection for personnel.

    10 Painting / coating as per drawing and satisfactory.

    Signature

    Electrical

    Mechanical

    C&I

    ElectricalMechanical

    C&I

    STANDARD CHECK LIST SHEET 1OF 3STATION : NTPC - Ramagundam

    PLANT ITEM : HFO PRESSURISING PUMP

    PLANT NOMENCLATURE:

    LOCATION: FUEL OIL PUMP HOUSE

    REF:

    Sl.No. ACTIVITY / CHECKS REMARK

    Agency Name Date

    NTPC

    Erec.

    Contractor

    NTPC

    Comg

    .