6

Click here to load reader

MUHAMMAD IRFAN CV -

Embed Size (px)

Citation preview

Page 1: MUHAMMAD IRFAN CV -

MUHAMMAD IRFAN. E-MAIL: [email protected] [email protected]

B-TECH CIVIL ENGINEER.

Current Designation: Quantity surveyor. Current Location: Shahrah-E-Quaid-E-Azam, Lahore . Current Company: Hashoo Group

Address: House No E-241/40 Mohalla Osmania Nationality: Pakistani.

Model Colony#2 Walton road LHR Cantt. Ph.#+92-301-4237799. +92-314-2975812.

Objective] Work Experience] Education] IT & Other Skill ] Personal Info]

Objective:-

To get challenging position in a growth-oriented organization this offers diverse job responsibilities.

Work Experience:-

Employer: Pearl-Continental Hotel Lahore.

Location of Assignment: Lahore.

Project: Shahrah-E-Quaid-E-Azam, Lahore.

Designation: Quantity Surveyor.

Duration: 21st July 2014 to Date…..

Duties:

To manages all costs relating to building

and civil engineering project from the

initial calculations to the final figures.

To minimize the costs of a project and

enhance value for money, while still

achieving the required standards and

quality.

To actively monitor a project from the

start, preparing estimates and costs of

the work & keep track of any variations to

the contract that may affect costs and

create reports to show profitability when

the project is in progress.

To maintain Quality & Quantity at various

stages of construction keeping in view the

standard specifications

Page 2: MUHAMMAD IRFAN CV -

To prepare drawings & BOQ’s /Technical

Reports. Analyzing outcomes and writing

detailed progress reports;

Preparing tender and contract

documents, including bills of quantities

with the architect and/or the contractor;

Undertaking cost analysis for repair and

maintenance project work;

Assisting in establishing requirements and

undertaking feasibility studies for civil

work.

To supervise all land/ field surveying

activities ensuring implementation of

best practices.

To plan and execute the development

related to land surveying, calculation and

providing information for map making in

civil construction work.

To ensure that quality & cost of project

meets the set targets.

To Check the IPC’s of Contractor.

To rough cost estimate of the project.

To detailed estimate of the project.

To check the Rate Analysis of contractor.

To check the Detailed Estimate of the

contractor.

To check the variation Order of the

contractor.

To check the Final X-Sections/As Built

Drawings of the project.

To check the bar bending schedules.

To check the Price Variation.

To check the Time Line of Project.

To check the Profit & Loose Statement.

To check the Project Report/Progress.

To check the final As Built Auto Cad

Drawings.

To check the Quality of Work.

To check the Demarcation.

Page 3: MUHAMMAD IRFAN CV -

Employer: Design & Engineering Systems (Pvt.) Ltd.

Location of Assignment: Lahore.

Project: Sunder Industrial Estate Lahore.

Designation: Quantity Surveyor.

Duration: 18th April 2014 to 19 th July 2014

Duties:

Preparation of BOQ.

Preparation of IPC’s.

Calculate the Quantities of Project.

Preparation of Rate Analysis.

Preparation of Detailed Estimate.

Preparation of variation Order.

Preparation of Final X-Sections.

Preparation of bar bending schedules.

Preparation of Price Variation.

Preparation of Sub Contractor’s Bills.

Preparation of Auto cad shop Drawings.

Preparation of Time Line of Project.

Preparation of Profit & Loose Statement.

Employer: Nasir Const. (Pvt.) Ltd.

Location of Assignment: Lahore.

Project: Development of Infrastructure Works D.H.A Phase –VIII Lahore.

Designation: Quantity Surveyor.

Duration: 7th Nov 2012 to 15 th April 2014

Duties: Preparation of IPC’s.

Preparation of RAR’s.

Calculate the Quantities of Project.

Preparation of Rate Analysis.

Preparation of Detailed Estimate.

Preparation of variation Order.

Preparation of Final X-Sections.

Preparation of bar bending schedules.

Preparation of Price Variation.

Preparation of Sub Contractor’s Bills.

Preparation of Auto cad shop Drawings.

Preparation of Time Line of Project.

Preparation of L-Section.

Page 4: MUHAMMAD IRFAN CV -

Employer: Ifthikhar & Co. (Pvt.) Ltd.

Location of Assignment: Lahore.

Project: PHA Apartments D & E Type. Designation: Site Engineer.

Duration: 27 th Sep 2010 to 27th Oct 2012.

Demarcation.

Monitoring all kinds of construction works.

To ensure compliance with engineering and client specification.

To check the quality of concrete and steel work to achieve the strength and quality according to the design and requirement.

To ensure the bar bending schedule according to structural drawings.

To discussing the problems in any activity with client on site and reporting about each activity.

To give the direction and technical support to the subordinates to complete work in time.

The technical work of the project and implementing the quality rules to fulfill the criteria.

To check the quality of paint, Flooring, Dado work and Door, Window Fixing etc.

Check the IPC’s.

X-Check IPC’s overall measurement of Project.

Employer: Ibrar Hussain Bukhari.

Location of Assignment: Lahore.

Project: Bukhari House D.H.A Phase -V.

Designation: Site Engineer.

Duration: 11thDec 2009 to 27th Sep 2010.

Demarcation.

Monitoring all kinds of construction works.

To ensure compliance with engineering and client specification.

To check the quality of concrete and steel work to achieve the strength and quality according to the design and requirement.

To ensure the bar bending schedule according to structural drawings.

To discussing the problems in any activity with client on site and reporting about each activity.

To give the direction and technical support to the subordinates to complete work in time.

The technical work of the project and implementing the quality rules to fulfill the criteria.

To check the quality of paint, Flooring, Dado work and Door, Window Fixing etc.

Check the IPC’s.

Page 5: MUHAMMAD IRFAN CV -

Employer: Niaz Builder.

Location of Assignment: Lahore.

Project: Joint Venture World Call & Multinet (Pvt.) Ltd.

Fiber Optical Cable (FOC) Laid From Muslim

League to Wahga Border.

Designation: Site Supervisor.

Duration: 21th Aug 2009 to 17thNov 2009.

Employer: Husnain Cotex (Pvt.) Ltd.

Location of Assignment: Lahore.

Project: BAB-E-Pakistan.

Designation: Asst. Quantity Surveyor.

Duration: 7th June 2009 to 21th Aug 2009.

Education:-

1. B-Tech from Preston Institute of Management, Science and Technology (PIMSAT). 2012

2. DAE from Punjab Board of Technical Education Lahore (PBTE). 2009

3. Matric from Board of Intermediate and Secondary Education Lahore (BISE). 2006

Computer and Other Skills:-

1. Microsoft Office.

2. Auto Cad 2D & 3D.

3. 3D Studio Max.

4. Corel Draw.

5. Adobe Photoshop Cs2.

6. Flash, Flax & Swish, cool Move.

7. Computer Hardware.

8. Communication & Mobile repairing PTCL Sarwar Ali road LHR Cantt.

9. Home appliances (Electrical) T.T.C Gulberg.

10. Eagle Point.

11. Operating Windows XP, 7 & 8.

12. Installation Windows & Application Software.

Page 6: MUHAMMAD IRFAN CV -

Personal Info:-

Father Name: Muhammad Haroon.

Date of birth: 10, November, 1988.

NIC #: 35201-2058521-1.

Religion: Islam.

Domicile: Lahore. (Punjab).

Marital status: Married.

Permanent address: House No E-241/40 Mohalla Osmania

Model Colony#2 Walton road LHR Cantt.

Languages:-

1. URDU.

2. English.

Interesting:-

Reading Books.

Cricket.