Upload
ismail-jamaluddin
View
50
Download
0
Embed Size (px)
DESCRIPTION
Resume for Muhammad Riaz Malik
Citation preview
Objective
Construction Engineer with a 13-year record of success all phases of multimillion-dollar construction,
Infrastructure, superfund and environmental projects for government and private-sector clients. Experience
includes construction oil refineries, Fertilizer plants, oil & Gas plants and managing crews of a variety of other
Construction/demolition projects.
Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.
Key Skills
Construction/Demolition Projects
QA/QC / Field Engineering
Site Safety/OSHA Compliance
Infrastructure Improvement Projects
Subcontractor/Crew Supervision
Bidding / Estimating / Proposals / Cost Controls
Academics
B-Tech (Hons.) Mechanical Technology from Preston University Karachi
Diploma of Associate Engineer Mechanical from GOVERNMENTT COLLAGE OF TECHANOLOGY BAHAWAL PUR (Punjab Board of Technical Education Lahore) in 1999
Secondary School Certificate (SSC) Bahawalpur in 1994.
Training on Safety & Environmental
Environmental awareness course form BRITSH SAFETY COUNCIL.
HSE Course from MOODY International certification
Confined Space Safety course B P PAKISTAN
Awareness OSHA Hazardous Waste Operations & Emergency Response (HAZWOPER)
Construction Safety, Confined Space Entry and First Aid
+923002109945
+923003637580
FATEH PUR KAMAL
RAHIM YAR KHAN,
PUNJAB, PAKISTAN
MUHAMMAD RIAZ MALIK
MECHANICAL ENGINEER [email protected]
Project Highlights
Professional Experience Over 13 years:Working: PAKISTAN PETROLIUM LTD (Site Engineer) (OCT 2010 to ……..)
Employment: SARTAJ AHMAD KHAN ASSOCIATES (Jan 2013 to …….)
Projects: 01) Well 98, 6 “ Feeder line at SUI GAS FIELD (4.0 km )(July 2013 to …….)
02) Well 28, 8 “ Feeder line at KANDH KOT GAS FIELD (1.2 km) (Jan to June 2013)
03) Well 99, 8 “ Feeder line at SUI GAS FIELD (1.0 km) (Mar to May 2013)
Employment: ALLIANCE INSPECTION AND ENGINEERING SERVICES (Jan 2012 to Dec 2012)
Projects: 01) 02 No. Water storage tank (17 x 7.5 M), SUI GAS FIELD, SUI (May.– Dec 2012)
02) 07 No. Water storage tank (11 x 7.5 M), SUI GAS FIELD, SUI (Jan.-Aug. 2012)
03) 20” Water flow line at SUI GAS FIELD, SUI (05 km phase 03) (Jan. July 2012)
Employment: BUREAU VERITAS PAKISTAN (OCT 2010 to Jan.2012)
Projects:01) Well 04, 4”Feeder line, Well Head’s Fabrication at CHACHAR GAS FIELD (0.7 km) (Oct-Dec 2011)
02) Well 89 8” Feeder line, Well Head’s Fabrication at SUI GAS FIELD, SUI(3.5 km)(May - July 2011)
03) Well (05,11,15,16,18) 6”Feeders lines, Well Head’s Fabrication / Modification project
at ADHI OIL & GAS FIELD RWP (19 km) (Nov10- Sep2011)
04) 20” Water flow line at SUI Gas FIELD, SUI - KASHMORE (21 km 02 phase) (Sep 2010-July2011)
Employment: MOODY INTERNATIONAL PAKISTAN (CSS/QA Inspector)
Projects: 01) Naimat Basal Oil and Gas Facility Tando Adam, Sindh ( Kamal North 02 Flow line ,Naimat Basal 02
Flow line) ,wellhead, compressor & Fabrication, erection of Manifold )
02) Kausar Oil and Gas Facility (Matyari ,Sindh) Up gradation compressor, fin fan cooler & Fabrication,
erection of Manifold
Working: BP(British Petroleum Ltd) (Sep 2009 to Oct 10)
Organization: HARIS & COMPANY Lahore (Mechanical Engineer)
Projects (01) Incinerator Relocation & Flare TIP Installation Project at Kadan Wari Gas Field
(02) Wartsila Cooling Tower Fabrication & Erection Project at SAWAN Gas Field
Client : OMV (Kadan wari / Sawan Gas Field) ( Mar 2009 to Sep 2009)
Organization: DESCON Engineering Limited Lahore (QA/QC Supervisor)( Jan. 2007 To Mar 2009)
Client : Engro Chemical Dahari, Sindh (Jan 2008 to Mar 2009)
Projects: (01) Ammonia / urea Expansion plant enven 1.3
(02) Cross Country Raw Water pipe line
Client : BOSICOR PAKISTAN LIMITED (Oct 2007 to Dec 2007)
Project Modification & Extension project
Client: BHP Billiton Zamzama Gas Plant, Dadu. (Jan. 2007 To Oct 2007)
Project: Zam Zama Gas Field Phase II
Organization: PCL (Pipe Link Construction) Pvt. (QAQC Supervisor)
Project: De Boatel Necking & Well Head Modification
Client: OMV PAKISTAN SAWAN FIELD (Jan 2006 to Jan 2007)
Organization: Merin Pvt. Ltd. (Mech. Supervisor)
Client: AAA (Adnan Asdar Associate ) (Mar. 2003 to Dec 2005):
Organization: Irshad Engineering Associate ( Mech. Supervisor)
Client: Lever Brother RYK (Dec 1999 to Mar 2003)
SHUT D0WN’s
Employment: BUREAU VERITAS PAK
Working : PAKISTAN PETROLIUM LTD ,(Site Engineer)
Projects 01 ATA at ADHI GAS FIELD RWP (Sep2011)
02 ATA at CHACHAR GAS FIELD
Employment: MOODY INTERNATIONAL PAKISTAN (CSS/QA Inspector)
Working : BP(British Petroleum Ltd)
Projects (01) Naimat Basal Oil and Gas Facility (Tando Adam, Sindh) Sep2009
(02) Kausar Oil and Gas Facility (Matyari ,Hyderabad Sindh) Mar 2010
Organization: HARIS & COMPANY Lahore (Mechanical Engineer)
Projects (01) Incinerator Relocation &Flare TIP Installation (ATA July 2009)
(02) Wartsila Cooling Tower Up Gradation Project (ATA June 2009)
Client: OMV ( Kadan wari / Sawan Gas Field )
Organization: DESCON Engineering Limited Lahore (QAQC Supervisor)
Client : BOSICOR PAKISTAN LIMITED (ATA Oct 2007)
Client : BHP Billiton Zam zama Gas Plant , Dadu (ATA March.2007)
Organization: PCL (Pipe Link Construction) Pvt. (QAQC Supervisor)
Client : OMV ( SAWAN Gas Field ) (ATA Nov. 2006)
Responsibil
ities
Detail study scope of work, Quality Inspection Plans procedures & specifications before starting the job.
Co-ordination with client for inspection formats as per requirements.
Responsible for the overall execution of the QIP at Project site through a well-managed team.
Awareness of international Codes and standards ASME, ASTM, API.
Responsible for Qualification of welding procedures & WQT.
Experienced in process piping fabrication, erection ,Steel Structure & tank involved in preparation of detail schedule & progress and welding according to Codes ,standards, Procedure & Client specification,
Also complete the modification works as per site requirements,
Monitor all-critical activities like Sand Blasting, Painting, Welding, NDT, PWHT, Hydro-testing, Flushing according to Codes ,standards, Procedure, QIP and Project Specification.
Supports field procurement, system turn over and commissioning. Support Construction management and engineering at site in preparation of daily/weekly reports, gathering data, obtaining drawings/deliverables from vendors and Head office engineering,
Installation and Inspection of Vessel, column, Heat Exchangers, Drum
Interpretation of Radiographs as per codes and specification.
Responsible for ensuring that N C R's are raise for every rejection / rework as occurred / pointed out by the QA&QC inspectors / execution.
Verification & Preparation of As-Built plan & piping isometric drawings.
Perform field walk downs / inspections to review the work for conformance with the design drawings, applicable codes/standards and company policies/procedures. Prepare punch-list,
Supervision of various activities from Mobilization to ROW preparation, Stringing, Production Welding, Lowering, HS Sleeve installation, Pigging, Hydrostatic Testing, Shutdown, Commissioning Punch list killing of cross country pipe line.
Responsible for maintaining up-to-date quality records as per Customer requirements,
Responsible for the preparing of Test Pack and to submit a final dossier to Customer
Personal
Father’s Name : Ghulam Yaseen
Language : Urdu, English
Date of Birth : 01 Feb. 1980
Nationality : Pakistani
CNID : 31301-3431065-3
Domicile : Punjab(Rahim Yar Khan)