    PRESENTATION ON

    LOGISTICS BEST PRACTICES &SALES PERFORMANCE

    BETWEEN VARIOUS CEMENT BRANDS

    Name of The trainee :------- Sk Washim Raja.

    Purpose :------- SIP underName of the course :-------- MBA(Marketing)

    Name of the Institute :- Kolkata

  • 8/9/2019 Summer Projet Presentation

    2/133

    flow and storage of goods, services and related information from point of

  • 8/9/2019 Summer Projet Presentation

    3/133

  • 8/9/2019 Summer Projet Presentation

    4/133

    vvTransportation cost rose rapidly due to the rise in fuel prices

    vvProduction efficiency was reaching a peakvvFundamental change in inventory philosophyvvProduct line proliferatedv

    vComputer technologyvvIncreased use or computersvvIncreased public concern of products Growth of several new, largeretail chains or mass merchandise with large demands & verysophisticated logistics services, by pass traditional channel &distributionvvReduction in economic regulationvvGrowing power of retailersvv

    Globalization

  • 8/9/2019 Summer Projet Presentation

    5/133

    c Logistics models in cement indust

  • 8/9/2019 Summer Projet Presentation

    6/133

  • 8/9/2019 Summer Projet Presentation

    7/133

    Todays Cement Supply chain

  • 8/9/2019 Summer Projet Presentation

    8/133

    Warehousing

    The storing of products, includingraw materials, parts, goods-in-process, finished goods at andbetween point-of-origin and point-

    of-consumption. Provides information on status of

    goods.

    .

    .

    Distribution centers are a type of warehouse whichhold minimum inventory of high-demand goods.

    .

    .

    .

    .

    .

  • 8/9/2019 Summer Projet Presentation

    9/133

    Warehousing: Storage ofinventories all through logisticsprocess.

    Physical supply Distribution

    Warehouse

    Warehouse

    cluding raw materials, parts, goods-in-process, finished goods at and between point-of-origin

    atus of goods.

  • 8/9/2019 Summer Projet Presentation

    10/133

    Warehouse

    Supplier

    Economies of scale

    .

    Transportationcarriers usually

    give discounts .for bigger loads

  • 8/9/2019 Summer Projet Presentation

    11/133

    Transportation Economies

    WarehouseSupplier

    Economies of scale

    .

  • 8/9/2019 Summer Projet Presentation

    12/133

    Achieves ProductionEconomies

    Economies of scale

    Warehouse

    Assembly line

  • 8/9/2019 Summer Projet Presentation

    13/133

    Inventory in a WarehousingContext

    Achieves transportation economies. Achieves production economies.

    Quantity purchased discounts,

    forward buy discounts. Maintain source of supply.

    Support customer service policies..

    .

  • 8/9/2019 Summer Projet Presentation

    14/133

    Movement

    Warehouse

    .

    Receiving, putting away

  • 8/9/2019 Summer Projet Presentation

    15/133

    Movement

    Warehouse

    .

    Receiving, putting away

  • 8/9/2019 Summer Projet Presentation

    16/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

  • 8/9/2019 Summer Projet Presentation

    17/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

  • 8/9/2019 Summer Projet Presentation

    18/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

  • 8/9/2019 Summer Projet Presentation

    19/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

  • 8/9/2019 Summer Projet Presentation

    20/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Vendorseek.com

    *

  • 8/9/2019 Summer Projet Presentation

    21/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    *Kits are how some manufacturers sell parts. By selling theparts in a kit, the manufacturer gains economies of scale inthings like transportation costs. It also saves administrative

    costs because rather than billing for and keeping track ofeach part, the manufacturer only has to keep track of the kit.Kitting is also a light manufacturing technique in whichassembly workers, sometimes in a warehouse, get all thecomponent parts of what they are assembling in a singlekit so that time is not lost looking for parts.

    Vendorseek.com

    *

  • 8/9/2019 Summer Projet Presentation

    22/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Labeling, shrink wrapping

    LabelLa

    belLabelLa

    bel

  • 8/9/2019 Summer Projet Presentation

    23/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Labeling, shrink wrapping

  • 8/9/2019 Summer Projet Presentation

    24/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Labeling, shrink wrapping

    Breakbulk, consolidation

  • 8/9/2019 Summer Projet Presentation

    25/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Labeling, shrink wrapping

    Breakbulk, consolidation

    Transportation

  • 8/9/2019 Summer Projet Presentation

    26/133

    Movement

    Warehouse

    .

    Receiving, putting away

    Picking, staging, loading

    Cross-docking

    Packaging

    Light assembly, blending, kitting

    Labeling, shrink wrapping

    Breakbulk, consolidation

    Transportation

    Import, export services(also an information function)

    &WARE HOUSE Godown

  • 8/9/2019 Summer Projet Presentation

    27/133

    & WARE HOUSE Godown

    H d d S b G d h i ?

  • 8/9/2019 Summer Projet Presentation

    28/133

    How many godown and Sub Go down you are having?(1)..(2).(3)(More than 3)

  • 8/9/2019 Summer Projet Presentation

    29/133

  • 8/9/2019 Summer Projet Presentation

    30/133

  • 8/9/2019 Summer Projet Presentation

    31/133

    What is the Area(..sq.ft) and total Storage Capacity (tn.) of your g= /Utilization area capacity

  • 8/9/2019 Summer Projet Presentation

    32/133

  • 8/9/2019 Summer Projet Presentation

    33/133

    vWhat is the area (sq ft ) of your warehouse (office area)?

  • 8/9/2019 Summer Projet Presentation

    34/133

    vWhat is the area (sq .ft.) of your warehouse (office area)?

    ..

  • 8/9/2019 Summer Projet Presentation

    35/133

  • 8/9/2019 Summer Projet Presentation

    36/133

    vStacking method in godown?

  • 8/9/2019 Summer Projet Presentation

    37/133

    vStacking method in godown?LIFOFIFO

    No of sacks you maintain in a stack?No of sacks you maintain in a stack?

  • 8/9/2019 Summer Projet Presentation

    38/133

    No. of sacks you maintain in a stack?No. of sacks you maintain in a stack?

    >15>20>25..>15>20>25..

  • 8/9/2019 Summer Projet Presentation

    39/133

    v Do you receive shortages or damaged items in a consignment?v ..Yes No

    v

    / What is the method of disposal compensation of such items in your case

    es , , Separate corner in the godown from where FIFO processcan be apply

    vHow many use security personnels are working in your godown?

  • 8/9/2019 Summer Projet Presentation

    40/133

    vHow many use security personnels are working in your godown?>2.>3..>5..>10

    What is the regular daily working hour at your godown?

  • 8/9/2019 Summer Projet Presentation

    41/133

    What is the regular daily working hour at your godown?=8hrs.=12hrs.16hrs20hrs..

  • 8/9/2019 Summer Projet Presentation

    42/133

  • 8/9/2019 Summer Projet Presentation

    43/133

    f l b h d i & h t ff

  • 8/9/2019 Summer Projet Presentation

    44/133

    from labour, how many godown supervisors & ware house staffs wor

  • 8/9/2019 Summer Projet Presentation

    45/133

  • 8/9/2019 Summer Projet Presentation

    46/133

    avg. yearly inventory time.?

  • 8/9/2019 Summer Projet Presentation

    47/133

    avg. yearly inventory time.?300 days330days340days

  • 8/9/2019 Summer Projet Presentation

    48/133

  • 8/9/2019 Summer Projet Presentation

    49/133

    Tot Dealer capacity

  • 8/9/2019 Summer Projet Presentation

    50/133

    Tot. Dealer capacity

  • 8/9/2019 Summer Projet Presentation

    51/133

  • 8/9/2019 Summer Projet Presentation

    52/133

    Per day avg. despatach

  • 8/9/2019 Summer Projet Presentation

    53/133

    Per day avg. despatach> > > ..> > .10 15 20 25

  • 8/9/2019 Summer Projet Presentation

    54/133

  • 8/9/2019 Summer Projet Presentation

    55/133

    th f iliti id t l b

  • 8/9/2019 Summer Projet Presentation

    56/133

    are the facilities you provide to your laboElectricity Drinking water Canteen

    Toilet Rest room.Safety measures ..

    (%)despatching via from Plant to

  • 8/9/2019 Summer Projet Presentation

    57/133

    ( ) p g railGodown

  • 8/9/2019 Summer Projet Presentation

    58/133

  • 8/9/2019 Summer Projet Presentation

    59/133

    Prev. year approx supply from your ware

  • 8/9/2019 Summer Projet Presentation

    60/133

    y pp pp y yhouse

  • 8/9/2019 Summer Projet Presentation

    61/133

  • 8/9/2019 Summer Projet Presentation

    62/133

    Security Deposit amount with the company

  • 8/9/2019 Summer Projet Presentation

    63/133

    y p p y

    .50 lakh

    .20 lakh

    .25 lakh

    .30 lakh

    20 lakh

    Security Deposit amount with the dealer

  • 8/9/2019 Summer Projet Presentation

    64/133

    y p

  • 8/9/2019 Summer Projet Presentation

    65/133

    v Time lag between order and supply?Time lag between order and supply?

  • 8/9/2019 Summer Projet Presentation

    66/133

    6-12hr 136-12hr 13...24...24 hrshrs 25.3625.36 hrshrs 37.-37.-4848hrs 4hrs 4872872hrshrs..

    a to find COMPARE the LOGISTICS PERFORMANCE among various b

  • 8/9/2019 Summer Projet Presentation

    67/133

  • 8/9/2019 Summer Projet Presentation

    68/133

  • 8/9/2019 Summer Projet Presentation

    69/133

  • 8/9/2019 Summer Projet Presentation

    70/133

  • 8/9/2019 Summer Projet Presentation

    71/133

  • 8/9/2019 Summer Projet Presentation

    72/133

  • 8/9/2019 Summer Projet Presentation

    73/133

  • 8/9/2019 Summer Projet Presentation

    74/133

    Do you have a home delivery system from yours counter/ Godown oryour customer picks up himself (in % of quantity sold)?

  • 8/9/2019 Summer Projet Presentation

    75/133

    your customer picks up himself (in % of quantity sold)?

    1. Pickup 2. Delivery ..

    vHow much does cement contributes to yourHow much does cement contributes to your

    totaltotal t it (i %)?t it (i %)?

  • 8/9/2019 Summer Projet Presentation

    76/133

    totaltotal storage capacity (in %)?storage capacity (in %)?

    You are the Authorized Dealer for:

  • 8/9/2019 Summer Projet Presentation

    77/133

  • 8/9/2019 Summer Projet Presentation

    78/133

  • 8/9/2019 Summer Projet Presentation

    79/133

  • 8/9/2019 Summer Projet Presentation

    80/133

  • 8/9/2019 Summer Projet Presentation

    81/133

    lease give a brief on present and past sales(%) performance Brand wilease give a brief on present and past sales(%) performance Brand wi

    2006 20092006 t 2009

  • 8/9/2019 Summer Projet Presentation

    82/133

    2006 to 20092006 to 2009

  • 8/9/2019 Summer Projet Presentation

    83/133

  • 8/9/2019 Summer Projet Presentation

    84/133

  • 8/9/2019 Summer Projet Presentation

    85/133

    What factor is more important to you ?Brand Logistic Support Sales Force

  • 8/9/2019 Summer Projet Presentation

    86/133

    g ppIncentives Credit Support

    packaging and labeling quality of cement as copackaging and labeling quality of cement as co

  • 8/9/2019 Summer Projet Presentation

    87/133

    p g g g q yp g g g q y

    ind of support you are getting from the CFAs? Rate

  • 8/9/2019 Summer Projet Presentation

    88/133

    pp y g g

    MiniMini

    PlantsPlants

  • 8/9/2019 Summer Projet Presentation

    89/133

    Insurance provide by any brand:-

  • 8/9/2019 Summer Projet Presentation

    90/133

    MiniMini

    PlantsPlants

    Please mark according to marketing supportPlease mark according to marketing supportby the various brandby the various brand

  • 8/9/2019 Summer Projet Presentation

    91/133

    by the various brandy

  • 8/9/2019 Summer Projet Presentation

    92/133

  • 8/9/2019 Summer Projet Presentation

    93/133

  • 8/9/2019 Summer Projet Presentation

    94/133

    MENT COMPANY GENERALLY GIVES GOOD

  • 8/9/2019 Summer Projet Presentation

    95/133

    Plstell me something about quantity distribution

  • 8/9/2019 Summer Projet Presentation

    96/133

    i.e %................stock transfer%.......direct sale

    g under your bannaer (Own/Hired)

  • 8/9/2019 Summer Projet Presentation

    97/133

    g under your bannaer (Own/Hired) i) Ten/ iv) Sixteen ./..v)Eighteen wheeler/

    Under Load and Over load capacity of trucks

    Y axis == tns

  • 8/9/2019 Summer Projet Presentation

    98/133

    Y axis == tns.

  • 8/9/2019 Summer Projet Presentation

    99/133

    Y axis == tns.

    How many points of delivery trucks has to cover for a singleHow many points of delivery trucks has to cover for a single 2 but

  • 8/9/2019 Summer Projet Presentation

    100/133

    How many checking points or police stations have to face in yourFor long...................For short

  • 8/9/2019 Summer Projet Presentation

    101/133

    the ideal detention time (gate in &gate out) for the vehicles plying u >6 hrs>8>12>24

  • 8/9/2019 Summer Projet Presentation

    102/133

    -:Questionnaire for Truck drivers:-

  • 8/9/2019 Summer Projet Presentation

    103/133

    Name:- .Address:- ..

    Mobile no. :- .What is the preferred article you want to carry, which doesnt involve hassles?

    Do you deliver cement for any company? YesNo

    If yes please tell the name of the company..Name of the transporter/transporting agency under which

    you are working

    What type of truck you are generally drivei)Si ii)Ei h iii) T i ) Si )Ei h h l

  • 8/9/2019 Summer Projet Presentation

    104/133

    i)Six .ii)Eight iii) Ten.. iv) Sixteen .. v)Eighteen wheeler..

    Do you carry license to drive all types of carriage vehicles?

    i)Six .ii)Eight iii) Ten.. iv) Sixteen .. v)Eighteen wheeler..Day / Night plying preference..

    Fuel consumption per trip ?>20lit..>40lit.>50lit

    Regular servicing of the vehicle frequency

    2 weeks4 weeks.Duration of tyres

    In case of normal truck loadIn case of truck overload

    How many times you have to conduct weigh-bridge assessment for the goods carried

    by you on a single trip?............................Do you carry Driving license.

  • 8/9/2019 Summer Projet Presentation

    105/133

    What is the average transit outflow of fund per trip you make for transportation?

    For carrying load over 20 Metric Tonnes

    For Carrying a load under 20 Metric Tonnes Whether you are covered by accidental insurance?............................................If yes, is that sponsored from your transporter or self-initiated?

    Comment :-.

    Sign

    :-names of the cement companies you deliver

  • 8/9/2019 Summer Projet Presentation

    106/133

    Longibilityof tyresIn case of normal truck load

  • 8/9/2019 Summer Projet Presentation

    107/133

    In case of truck overload

    rry Driving license

  • 8/9/2019 Summer Projet Presentation

    108/133

    y g

    nduct weigh-bridge assessment for the good

    Almost 100% truck driver carry driving license

    Twice ..1stin plant then

    targeting point

    rage transit outflow of fund per trip you make for

  • 8/9/2019 Summer Projet Presentation

    109/133

    Whether you are covered by accidental insurance?

  • 8/9/2019 Summer Projet Presentation

    110/133

    If yes, is that sponsored from your transporter or self-initiated?

    Day / Night working preferrence

  • 8/9/2019 Summer Projet Presentation

    111/133

    vRegular servicing of the vehicle frequency2 times/months4 times/months.

    Fuel consumption per trip ?> ..> .> 20lit 40lit 50lit

  • 8/9/2019 Summer Projet Presentation

    112/133

  • 8/9/2019 Summer Projet Presentation

    113/133

    ugh the limits of bengal sikkimand onwards )of cement industry generallent .ith affective and time bound cement trafficking (both Road and Rail

    bility of small and medium size vehicles where ACC should be

    marketshave sufficient numbers of cement storage points whichensures regularity in cement dispatch schedule where

  • 8/9/2019 Summer Projet Presentation

    114/133

    ensures regularity in cement dispatch schedule whereACC needs to satisfy its channel partners in a better

    waywith having sufficient emergency stock .

    The ACC ware houses of SU Asansol require regular

    andbetter maintenance with requisite safety and protectivemeasures for storing cement and having a better workenvironment .

    ACC should work competitive and profitableincentivemodel and reasonable credit support for the relatedstakeholders and ensure actions being taken as per the

    b d it i d i d i t

  • 8/9/2019 Summer Projet Presentation

    115/133

    g brand equity index ,price responses and price management

    r coordinated action and communication amongst the sales andmarket share in the said market places.

    -: :-CONCLUSIONS

  • 8/9/2019 Summer Projet Presentation

    116/133

    The cement industry in SU Asansol markets is said to haventered in an era of price war , demand forces supplyimparity and mainly towards an industry based on

    customer satisfaction ,So all the major brands of cementhas agreed on formulation of customized strategies indealing with this issues The Logistics support is veryimportant in that strategy so ACC should also move

    around with the market trend and ensure customersatisfactions at its level best. We know the dealers arethe pillers of any business So ACC should take moreresponsibility with them.

    ANNEXURE:-

  • 8/9/2019 Summer Projet Presentation

    117/133

    repared questionnaire for better understand the existing logistics system,ich is given to the dealers, Transporters, C&F agents .

    e duty of logistician does not ends here it also takes into consider thestomer service and there valuable feed back because at any point of timestomer is valuable to the company ,so to better understand them I alsoade visit to the dealers.

    llowings are the points I tried to find out: ------

    vThe Critical Symptoms of logistics problem DCW presentlyexperiencing.

    vThe keys economic, Technological, Social, Regulatory forces drivithe logistics management environment in the cement industry.

    v

  • 8/9/2019 Summer Projet Presentation

    118/133

    vHow do the above factors affecting the companys practi

    in logistics management now and in the near future?

    vHow does the company get access to information aboutcustomer purchase patterns for the forecast?

    vWhat other sources of market information do company uto better pin point future demand for their product?

    vHow the company rates the accuracy in predicting demaspikes or others unusual market events?

    -:Questionnaire for warehouses:-Name:-.......................................................Address: Mob:

  • 8/9/2019 Summer Projet Presentation

    119/133

    Address:-.Mob:-vHow many godown and Sub Go down you are having?

    (1)..(2).(3)(More than 3)Area:sq.ft Total Storage Capacity

    vHow old is your warehouse?

  • 8/9/2019 Summer Projet Presentation

    120/133

    >15>20>25..vIs your warehouse is totally safe & protected from climatic adversities?

    vDo you receive shortages or damaged items in a consignment?

    ..vWhat is the method of disposal/compensation of such items in your case?

    .....................................................................................................vDo you use security personnel in godown? Please tell me the no

    >5.>10..>15..>20vWhat is the regular daily working hour at your godown?

    =8hrs.=12hrs.16hrs20hrs..vApart from labour, how many warehouse supervisors you have?

    20>25.

    vWhat are the facilities you provide to your labours?

    Electricity Drinking water Canteen Toilet Rest room.Safety measures ..

    vHave you any Insurance policy for your warehouse/godown

  • 8/9/2019 Summer Projet Presentation

    121/133

    vHave you any Insurance policy for your warehouse/godown..name of the company v

    vHave you offered any insurance facility to yours worker under any insurancecompany :-.Name of the company.

    v

    vWhat are the voluntary services followed by you which contributes to the societin a big way?

    1)2)

    3)

    Comment:-...................

    Sign..

    -: & - :-Questionnaire for Dealer Sub DealerName of the firm :-.

  • 8/9/2019 Summer Projet Presentation

    122/133

    Name of the firm : .Ownership Type & Name :-Contact Details:-..

    Mobile No:-..

    vHow many years you have spent in this cement business

  • 8/9/2019 Summer Projet Presentation

    123/133

    a) Trucks b) Two Whilllers c) VANd )Thela e)AUTO ..f)Other...

    vDo you have a home delivery system from yours counter/ Godown or your customer picks uphimself (in % of quantity sold)?

    1. Pickup 2. Delivery ..

    vHow much does cement contributes to your total storage capacity (in %)?>80%>60%.>50%..........>30%...........>20%..........

    vYou are the Authorized Dealer for:i) Ambuja iii) Ultra-tech iii) ACC iv) Birla Samrat.

    v). Lafarge vi) Birla Gold vii) Konark

    viii) Others. if two/three brand together then ....

    vPlease give a brief on present and past sales performance Brand wise:No.bags 2006 % 2007% 2008% 2009%

    Lafarge

  • 8/9/2019 Summer Projet Presentation

    124/133

    vHow many Sub Dealers you are supplying to at this time?>5 >10..>15..>20..>25

    v What factor is more important to you ?Brand.Logistic Support ..Sales Force ..Incentives Credit Support.

    Ambuja

    Ultra-Tech

    Birla Gold

    ACC

    Konark

    Durgapur cement

    Others

    Total

    vPlease mark the packaging and labeling quality of cement as compared toothers.v

    v

    v

    NAME OF BRAND SCORES (out of 5)

    Konark

    Ambuja

  • 8/9/2019 Summer Projet Presentation

    125/133

    v

    v

    v

    v

    vv

    v

    v

    v

    v Please mark the order delivery system of the companyi) Excellent: 5 ii)Very Good.: 4. iii)Good :3 iv)Avg:2 v) Poor:1.

    j

    Ultra-Tech

    Birla Plus

    Lafarge

    Durgapur Cement

    ACC

    Total

    NAME OF BRAND SCORES (out of 5)

    Konark

    Ambuja

    Ultra-Tech

    Birla Plus

    Lafarge

    Durgapur Cement

    ACC

    Total

    vWhat kind of support you are getting from the CFAs? Ratethem :-v

    NAME OF BRAND SCORES (out of 5)

    Konark

    Ambuja

  • 8/9/2019 Summer Projet Presentation

    126/133

    v

    v

    v

    v

    v

    vInsurance provide by any brand?

    v

    Ambuja

    Ultra-Tech

    Birla Plus

    Lafarge

    Durgapur Cement

    ACC

    Total

    NAME OF BRAND SCORES (out of 5)

    Konark

    Ambuja

    Ultra-Tech

    Birla Plus

    Lafarge

    Durgapur Cement

    ACC

    Total

    vPlease mark according to marketing support by the following brand :-v

    v

  • 8/9/2019 Summer Projet Presentation

    127/133

    v

    v

    v

    vv

    v

    Comment:-

    Sign

    -: :-Questionnaire for Transporters

  • 8/9/2019 Summer Projet Presentation

    128/133

    Name:- .Address:- ..Mobile no. :- .

    Are you directly associated with any cement company ?........ Name of the company

    How many trucks do you have your own?........................

    No.of own trucks operating/hired under yours bannersi) Six .../...... ii) Eight/ iii) Ten/

    iv) Sixteen ./.. v)Eighteen wheeler/Informations of Trucks and supply :-

    Type of Trucks. CarryingCapacity

    OverloadingCapacity

    Mileageshipping cycle time ( im e&n between gate in gate)ut

    Six wheelerEight wheeler

    Ten wheeler

    Sixteen wheeler

    Eighteenwheeler.

    How many points of delivery trucks has to cover for a single order?2 but 4 but

  • 8/9/2019 Summer Projet Presentation

    129/133

    How many checking points or police stations have to face in your route?( 2)..(4).(6)(8)..

    What should be the ideal detention time (gate in &gate out) for the vehicles plying under yourbanner? >6 hrs>8>12>24

    Have you received the Agreement and Security deposits from the company?

    What are the precautions you are taking during transporting the consumer durable products/ fragile goods?(i.e Rain, damp weather )

    Pls tell me something about quantity distribution(%)Direct sale. ii) Stock transfer

    10) How you generally fix the freight..And amount /Km. is .

    -:Questionnaire for Truck drivers:-

  • 8/9/2019 Summer Projet Presentation

    130/133

    Name:- .Address:- ..

    Mobile no. :- .What is the preferred article you want to carry, which doesnt involve hassles?

    Do you deliver cement for any company? YesNoIf yes please tell the name of the company..Name of the transporter/transporting agency under which

    you are working

    What type of truck you are generally drivei)Six .ii)Eight iii) Ten.. iv) Sixteen .. v)Eighteen wheeler..

  • 8/9/2019 Summer Projet Presentation

    131/133

    Do you carry license to drive all types of carriage vehicles?

    i)Six .ii)Eight iii) Ten.. iv) Sixteen .. v)Eighteen wheeler..Day / Night plying preference..

    Fuel consumption per trip ?>20lit..>40lit.>50lit

    Regular servicing of the vehicle frequency

    2 weeks4 weeks.Duration of tyres

    In case of normal truck loadIn case of truck overload

    How many times you have to conduct weigh-bridge assessment for the goods carried

    by you on a single trip?............................Do you carry Driving license.

  • 8/9/2019 Summer Projet Presentation

    132/133

    What is the average transit outflow of fund per trip you make for transportation?For carrying load over 20 Metric Tonnes

    For Carrying a load under 20 Metric Tonnes Whether you are covered by accidental insurance?............................................If yes, is that sponsored from your transporter or self-initiated?Comment :-.