CMD 18-H6.1C File / dossier: 6.01.07 Date: 2018-06-12 Edocs: 5559804 Supplementary Information Presentation from Ontario Power Generation Inc. In the Matter of Ontario Power Generation Inc., Pickering Nuclear Generating Station Renseignements supplémentaires Présentation d’Ontario Power Generation Inc. À l’égard d’ Ontario Power Generation Inc., centrale nucléaire de Pickering Request for a ten-year renewal of its Nuclear Power Reactor Operating Licence for the Pickering Nuclear Generating Station Demande de renouvellement, pour une période de dix ans, de son permis d’exploitation d’un réacteur nucléaire de puissance à la centrale nucléaire de Pickering Commission Public Hearing Part 2 June 2018 Audience publique de la Commission Partie 2 Juin 2018

Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

CMD 18-H6.1C

File / dossier: 6.01.07 Date: 2018-06-12

Edocs: 5559804

Supplementary Information Presentation from Ontario Power Generation Inc. In the Matter of Ontario Power Generation Inc., Pickering Nuclear Generating Station

Renseignements supplémentaires Présentation d’Ontario Power Generation Inc. À l’égard d’ Ontario Power Generation Inc., centrale nucléaire de Pickering

Request for a ten-year renewal of its Nuclear Power Reactor Operating Licence for the Pickering Nuclear Generating Station

Demande de renouvellement, pour une période de dix ans, de son permis d’exploitation d’un réacteur nucléaire de puissance à la centrale nucléaire de Pickering

Commission Public Hearing Part 2 June 2018

Audience publique de la Commission Partie 2 Juin 2018

Page 2: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep
Page 3: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

PICKERING NUCLEARGENERATING STATIONPart 2 HearingLicence RenewalJune 25-29 2018

Randy Lockwood, Senior Vice PresidentCMD 18-H6.1C

Page 4: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Presentation Outline• Opening Remarks

• Our Commitments

• Our Request and Supporting Case for Licence Renewal

• Clarifications from Part 1 Hearing

• Interventions

• Conclusions

2

Page 5: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Opening Remarks

3

Page 6: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Pickering’s Commitments• Uphold nuclear safety

• Assure fitness for service

• Sustain an engaged workforce

• Maintain low impacts of operation

• Support transparency and engagement with the public

• Continue to invest

4Securing Ontario’s Clean Power Future

Page 7: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

We are Nuclear Professionals

5

Page 8: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Request for Licence Renewal• OPG is seeking a 10-year licence renewal

(September 1, 2018 to August 31, 2028):• Continued commercial operation to end of 2024 (up to 295,000

Equivalent Full Power Hours)• Stabilization period (fuel and water removed from reactors)• Start of safe storage by 2028

Securing Ontario’s Clean Power Future6

Page 9: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Summary of Supporting Case• Pickering plays an important role in providing clean, safe, reliable, low cost

electricity• Protecting the public, workers, and the environment• Fostering open and respectful relationships with communities

• Long history of safe operation at OPG nuclear facilities• Engaged, experienced and motivated staff will keep Pickering

operating well• Increasingly high levels of plant performance, some are best ever• Fit for service through to 2024

• Through continued investments, the Pickering station is safe today and will be safer tomorrow

Safe Today, Safer Tomorrow7

Page 10: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Clarifications from Part I Hearing

8

Page 11: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Role of EME • OPG’s post-Fukushima response

effort included the addition of portable and flexible equipment, i.e., EME

• Phase 1 EME provides added defence-in-depth for fuel cooling; Phase 2 EME provides added containment defence-in-depth

• Both Phase 1 and Phase 2 EME implementation are complete

• All Fukushima Action Items closed in 2015

Committed to Nuclear Safety9

Page 12: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Periodic Safety Review (PSR): Safety Enhancements• In addition and separate from

Fukushima Action Items; part of continual safety improvement

• e.g., Firewater modifications to provide an additional source of cooling water to Units 1,4 Heat Transport Systems, Steam Generators, and Calandria Vessels

• Will provide even more diverse ways to cool the fuel – in addition to the station systems and EME

Committed to Nuclear Safety10

Page 13: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Fission Chambers

• Under current licence, very small amounts of enriched uranium used as a coated layer in part of fission chambers for Units 1-4 Shutdown Systems

• Also, used within Core Discharge Monitors owned, operated and controlled by IAEA per safeguards program

Committed to Nuclear Safety11

Page 14: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Interventions

12

Page 15: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

OPG Review and Comment• OPG has reviewed all available

written and oral intervention material in relation to Pickering licence renewal

• We respect the public views and interest in our operations

• Common concerns among several intervenors are addressed

13Securing Ontario’s Clean Power FutureRespecting public input

Page 16: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Transparency • OPG proactively posts key

documents for public access– station operating performance

reports, full suite of PSR reports, PSA summaries, Environmental monitoring reports and assessments, Evacuation Time Estimates report, End of Commercial Operations letter

• OPG fosters open communication via engagement with local communities, external stakeholders, and Indigenous communities

14

Committed to openness and transparency

Page 17: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Fitness For Service• Fitness for service of major components

rigorously confirmed through to end of commercial operation (2024)

– fuel channels / feeders / steam generators / reactor components

– regularly assessed via comprehensive Aging Management Program

– maintenance / testing / inspections / monitoring

– meet/exceed CNSC requirements & CSA Standards

– confirmed by extensive PSR

• Supported by Continued Investments and Innovation

15

Committed to Fitness for Service

Page 18: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Emergency Preparedness (EP)• Pickering has many robust and diverse

barriers on site to protect the public

• OPG’s EP plans are well integrated with off-site authorities

• Exercise Unified Control demonstrated readiness on a large scale

• OPG collaborates with local and provincial government to promote EP public awareness

• KI pills pre-distributed

• PNERP updated, Pickering Implementing Plan approved

16

Promoting public awareness and safety

Page 19: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Environmental Protection

• Effective mitigation of any environmental impacts (low risk)

• Routinely monitor air, water, soil, food and vegetation

• Radiological releases into air and water are far below regulatory limits (<1%)

• Nurture wildlife through diversity and habitat programs

• Fish Authorization for Pickering

17

Proactive environmental stewardship

Page 20: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Nuclear Waste & Used Fuel

• Well-established programs and plans in place to safely manage all nuclear waste and used fuel from Pickering – low and intermediate waste; wet

and dry storage of used fuel– separately licensed waste

management facilities – Including long-term strategy, per

regulatory process

• Irradiated Fuel Bays at Pickering– assessed as part of the PSR – sufficient storage capacity to

support station needs

18Responsible waste management

Page 21: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Community

19

Page 22: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Community

20

Page 23: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Community

21

Page 24: Supplementary Information Renseignements supplémentaires ... · • Long history of safe operation at OPG nuclear facilities • Engaged, experienced and motivated staff will keep

Conclusions

• Qualified to operate safely

• Continuing to protect the public, workers, and the environment

Our last years will be our best22