Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 1 The Integrated Project “MODTRAIN” Innovative Modular Vehicle Concepts for an Integrated European Railway System Les Journées de la DRAST Projets de Recherche Européens sur les Transports : où en sommes-nous? 15 February 2005 METL, Paris

The Integrated Project “MODTRAIN” - EUROSFAIRE · The Integrated Project “MODTRAIN ... • Operator revision of the first draft FRS ... (SP3D) Monitor (SP3A) Operate (SP3A/B)

Embed Size (px)

Citation preview

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 1

The Integrated Project “MODTRAIN”

Innovative Modular Vehicle Concepts for an Integrated European Railway System

Les Journées de la DRASTProjets de Recherche Européens sur les Transports : où en sommes-nous?

15 February 2005METL, Paris

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 2

Transport Demands of Europe 2020

*compared to the year 2000

• Overall passenger transport demand:– + 40%* = 7.500 billion pkm

• Overall freight transport demand:– + 70%* = 6.000 billion tkm

• Enlarged European Union– At least half a billion inhabitants– At least 27 Member States

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 3

Revitalising Europe‘s Railways

Road Rail Inland waterways Pipelines Sea

(intra-EU)43.82000 8.1 4.1 2.8 41.3

Passengercars

Buses & coaches

Tram &metro Railway Air

78.3 8.5 1.1 6.3 5.8

• The Railways‘ challenge of market share increase:

Goods transport. Modal split (%)

Passenger transport. Modal split (%)

15% (2020)

12% (2020)

2000

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 4

R&D Activities to Drive Railway Development

Joint Railway Research to develop new railway products and services

SRRA –Strategic Rail

Research Agenda

Interoperability

Intelligent mobility

Safety

Environment

Innovative Materials & Technologies

The EU 6th Framework Programme on R&D

Railway operators

Railway industries

Infrastructure Managers

National & European research programmes

User Groups

Environmental Organisations

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 5

• SRRA - Clear Strategic Priorities:– Seamless Passenger

Services– Customised Freight Services– Integrated Mass Transit

Systems– Fully Interoperable

Infrastructure– Environmental Impact and

Sustainability– Modular Interoperable

Rolling Stock

MODTRAIN

Pre

sent

atio

n of

the

SR

RA

to E

U C

omm

issi

oner

Phi

lippe

Bus

quin

, Jun

e 20

02

SRRA –Strategic Rail Research Agenda

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 6

MODTRAIN Definition

MODTRAIN: Innovative Modular Vehicle Concepts for an Integrated European Railway System• MODTRAIN background: New trains risk independent interpretations of

requirements and being built from unproven prototype components.• MODTRAIN objective: Definition and proof of the necessary functional,

electrical and mechanical interfaces and validation procedures as reference to deliver the range of interchangeable modules that will make the next generation of intercity trains and universal locomotives possible.

• MODTRAIN framework: Fixed formation passenger trains and universal locomotives capable of 200 km/h and more. Hope to embrace other forms of traction as work advances.

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 7

MODTRAIN Facts & Figures

MODTRAIN is the first Integrated Joint Railway Research Project:• Project Coordinator: UNIFE – Association of European

Railway Industries

• Number of Consortium Partners: 37 from 10 countries

• Official starting date: 1 February 2004

• Project duration: 4 years

• Total MODTRAIN budget: € 30,2 Million

• Total EC Funding: € 16,9 Million

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 8

MODTRAIN Consortium

• UNIFE (Coordinator);Management support: ALMA

• UIC

• Alstom Transport• Ansaldobreda• Bombardier Transportation / FAV

• Siemens TS

• DB AG• SNCF• Trenitalia

• ANIE (I)• FIF (F)• RIA (UK)• VDB (D)• TÜV Nord

• ABB Schweiz• D2S International

• D‘Appolonia• Deuta Werke• FAR Systems• Frensistemi• IFE• KMT• Knorr-Bremse• Lucchini• Lumikko

System Integrators

Railway Operators

Intern. Associations • ERCIM• FPC / UPC• Fraunhofer IWM

• IAS • IST Lisboa• Politecnico Milano

• TU Berlin• TU Wien• Universita di Firenze

• University of Newcastle

Research Centres

MODTRAIN Core Group

ProfessionalAssociations

Subsystem Suppliers

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 9

MODTRAIN Structure

• The 4 technical elements of MODTRAIN:– The running gear (MODBOGIE);– The train control architecture (MODCONTROL);– The on-board power system (MODPOWER); and– The man-machine and train-to-train interfaces (MODLINK).

MODLINK EUCab

MODLINK Door Portal & Train Crew InterfaceMODBOGIE

MODPOWER

MODPOWER

MODCONTROL

MODLINK EUCoupler

• The 5th element, the MODUSER platform, feeds into the the project additional inputs & requirements of operators, infrastructure managers and sub-suppliers.

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 10

MODTRAIN Structure

Final Assembly

Transformer

Electrical pre-assemblies

Plug-ins to Train Management

systemCables & Ducts

Wheels, Axles,Bogie Mountings

Drivers Desk integratedinto Full Cab Structure

Drivers desk, cab structure, doors, windscreen & HEVAC

Converters & Traction ControlAuxiliary Power SupplyPantographs &

HV Equipment

Bogie

COMPETITIVE

MODTRAIN Scope

• The modules and modular interfaces of the 4 technical elements are to be standardised according to a priority list and using end-user functional requirements:

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 11

MODTRAIN Targets

Benefits for European Rail Transport: Towards an Integrated European Railway SystemMODTRAIN targets:• Reduction of average cost per pkm / tkm: up to 10%• Increase of new rolling stock productivity: 30%• Increase of the percentage of service proven components built into new

series: from 40-50% up to 80-90%• Market reduction in bidding costs due to increased modularisation of train

architecture: up to 25%• Reduction of manufacturing cost through platform-based production

patterns: ca. 10%• Reduction of time-to-market: ca. 30%• Increase of reliability: up to 25%.• Reduction of maintenance costs: up to 30%.• Integration of the passenger needs at design stage of the new system.

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 12

MODTRAIN Benefits

Operator benefits: More value for money• Wider choice of supply base to

increase competition• Re-use of proven technology; better

quality, reliability and cost reduction; • Increased infrastructure capacity by

use of more multiple train units • Train crew efficiency• New cross-border operations• Environmental optimisation of design• …

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 13

MODTRAIN Benefits

Industry benefits: Reduction of product variety

1200 single parts

past future• Reduce number of

single parts

• Concentration on sub-assemblies

500 h 10 days2000 h 40 days

• Simplify the connections and interfaces

• Separate functions in pre-tested subassemblies

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 14

Main work progress achieved until today:• Agreement on a common Product Breakdown Structure (PBS) and

Functional Breakdown Structure (FBS).• Agreement on a common template for Functional Requirement

Specifications (FRS).• Identification by each Subproject of the necessary FRS for

standardisation within the scope of MODTRAIN (in total 88) and drafting of the FRS (1rst draft to be finalised end of 2004).

• Identification by the MODTRAIN Operator Group of a priority list of 34 interoperable constituents for the scope of „Plug-and-Play“

• Industry feedback on the priority list with proposals for possible standardisation levels

• Set up of the MODTRAIN Technical Management Team (TMT) for coordination of the Subsystems‘ work at system level.

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 15

European Commission

Supervisory BoardUNIFE, Alstom, Ansaldobreda, Bombardier, Siemens, DB, SNCF, Trenitalia, UIC

Executive CommitteeSubproject & Vice Subproject Leaders + ALMA

Management SupportALMA Consulting Group

Project CoordinatorUNIFE

37 Contractors

Subproject LeaderAnsaldobreda

Vice-Subproject LeaderTrenitalia

MODBOGIE

Subproject LeaderAlstom

Vice-Subproject LeaderDB

MODCONTROL

Subproject LeadersBombardier / FAV

Vice-Subproject LeaderUIC

MODLINK

Subproject LeadersUIC / UNIFE

MODUSER

Subproject LeaderSiemens

Vice-Subproject LeaderSNCF

MODPOWER

Industry Technical Management TeamSubproject Leaders & System Managers

Secretariat: UNIFE / ALMA

Operator GroupDB, SNCF, Trenitalia

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 16

The role of MODUSER• MODUSER members:

– UNIFE, ANIE, FIF, RIA, VDB– UIC, UIC member experts– RSSB, Porterbrook

• Information of railway stakeholders of the MODTRAIN project progress via:– MODTRAIN website www.modtrain.com– MODTRAIN newsletter – MODTRAIN stakeholder conferences (next conference planned for April /

May 2005)– At national level: MODTRAIN seminars & events of the national railway

industry associations

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 17

Next steps for early 2005:• Operator revision of the first draft FRS• Finalisation of the priority list of interoperable constituents and

industry / operator agreement on levels of standardisation & time plan

• Set up of an overall MODTRAIN work plan adapted to the additional work performed (milestones)

• Making the Technical Management Team work: coordination at system level; closer cooperation with the operators

• Ensuring FRS coherency with revised TSIs; link with AEIF experts and AEIF Conformity Group & Economic Evaluation Group

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 18

Other Projects Starting in 2005:

lligent inteGration of RAILway systems

• INTEGRAIL :INTE

Communication(SP3D)

Monitor

(SP3A)

Operate

(SP3A/B)

Aggregate/Integrate(SP3B/C)

Decide

(USERS)

data

infoactivities/procedures

actions

Communication(SP3D)

Monitor

(SP3A)

Operate

(SP3A/B)

Aggregate/Integrate(SP3B/C)

Decide

(USERS)

data

infoactivities/procedures

actions

1+2/02/2005 InteGRail meeting 7

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 19

Other Projects Starting in 2005:• MODURBAN :

Les Journées de la DRAST : Projets de Recherche Européens : où en sommes-nous? 15022005, Paris 20

Thank you for your attention !