View
26
Download
0
Category
Preview:
DESCRIPTION
Graceful Shutdown in MPLS Traffic Engineering Networks draft-ali-ccamp-mpls-graceful-shutdown-03.txt. Zafar Ali (zali@cisco.com) Jean Philippe Vasseur (jpv@cisco.com) Anca Zamfir (ancaz@cisco.com). History of the Draft. It was first presented at IETF 60 in August 2004. - PowerPoint PPT Presentation
Citation preview
165th IETF, March 200665th IETF, March 2006
Graceful Shutdown in MPLS Traffic Engineering Networks
draft-ali-ccamp-mpls-graceful-shutdown-03.txt
Zafar Ali (zali@cisco.com)Jean Philippe Vasseur (jpv@cisco.com)
Anca Zamfir (ancaz@cisco.com)
22265th IETF, March 200665th IETF, March 2006
History of the Draft
• It was first presented at IETF 60 in August 2004.
• There is a general agreement on the requirements and the Signaling Solution. • We need to close on a minor detail in the Routing
Solution (discussion focus for today).
33365th IETF, March 200665th IETF, March 2006
Motivation for using the link-attribute sub-TLV
• The draft proposes to use link-attribute sub-TLV with “local maintenance required” bit, as defined in http://www.ietf.org/internet-drafts/draft-ietf-isis-link-attr-01.txt.
• Draft discusses the possibility of using (MAX-METRIC, Zero Bandwidth) based solution but also points out some issues associated with this solution-
A link may end-up with max metric for multiple reasons and without the link attribute there is no way a node can tell what the reason is, e.g. a restarting node advertises the max matrices [RFC4203 , RFC4205].
A resource under graceful shutdown can be used as a last resort resource.
• The ID states the following backward compatibility note-
"to deal with nodes not compliant with this document (i.e., does not implement link attribute sub-TLV based solution), the node initiating graceful shutdown MAY originate the TE LSA/LSP containing Link TLV with 0 unreserved bandwidth, Traffic Engineering metric set to 0xffffffff, and if the Link is non-PSC then also with 0 as Max LSP Bandwidth.“.
44465th IETF, March 200665th IETF, March 2006
Next Steps
• There is a general agreement on the requirements and signaling solution.
• We would like to close on routing solution quickly.
• The work is within the Scope of CCAMP.
• We would like to request WG to accept this ID as a WG document.
Recommended