DEPENDIBILITY & QUALITY ASSURNCE MANAGEMENT MAINTENANCE OF ELECTRICITY DELIVERY NETWORKS GENERAL LOSS CONTROL RULES EMS & OH & S INCIDENT MANAGEMENT SYSTEMATIC CAUSE ANALYSIS TECHNIQUE LIVE WORK GUIDELINE FOR QUALITY ASSURANCE TAC TECHNICAL AUDITING COURSE ITC INSTRUCTOR TRAINING COURSE M i n i n g E n e r g y Ex.M M i n i n g E n e r g y Ex.M M i n i n g E n e r g y M i n i n g E n e r g y M i n i n g E n e r g y RSA Mining Improvement Performance Evaluation Operation Support Planning Leadership OH&S OCCUPATIONAL HEALTH & SAFETY • Scope • Normative References • Terms & Definitions • Context of Organization Improvement Performance Evaluation Operation Support Planning Leadership QMS QUALITY MANAGEMENT SYSTEM • Introduction • Scope • Normative References • Terms & Definitions • Context of Organization Management Review Targets & Objectives Register Aspects & Impacts Register Risk Assessment Matrix Legal Requirements Qaulity System Procedures EMS ENVIRONMENTAL MANAGEMENT SYSTEM • Introduction • Scope • Normative References • Terms & Definitions • General Requirements Continual Improvement Integrated Structured and Comprehensive Human and Cultural Factors Best Available Information Dynamic Inclusive Customized RMS RISK MANAGEMENT SYSTEM M i n i n g E n e r g y PAS 99 M i n i n g E n e r g y 1 Pager ISO 9001 : 2008 " IMS " S M A R T S - M - A - R - T - Specfic Measurable Attainable Realistic Targets (SHEQR) S M A R T " IMS " - Integrated Management System LIVE WORK M A I N T E N A N C E E N E R G Y SECTOR LIVE WORK M A I N T E N A N C E LIVE WORK - TECHNOLOGY '2000 MEDIUM (MHV) HIGH (HV) EXTRA HIGH (EHV) ENERGY SECTOR Library Banner & Poster ( All Elements ) E N C Y C L O P E D I A C3M LIVE WORK MAINTENANCE ALL Sectors - GENERIC EMS & RMS ISO - Conformity Industry - SECTORS Manuals Modules

L IVE W ORK - T ECHNOLOGY

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

DEPENDIBILITY &

QUALITY ASSURNCE

MANAGEMENT

MAINTENANCE OF

ELECTRICITY

DELIVERY NETWORKS

GENERAL LOSS

CONTROL RULES

EMS & OH & S

INCIDENT

MANAGEMENT

SYSTEMATIC

CAUSE ANALYSIS

TECHNIQUE

LIVE WORK

GUIDELINE FOR

QUALITY ASSURANCE

• TAC •

TECHNICAL

AUDITING COURSE

• ITC •

INSTRUCTOR

TRAINING COURSEMining

Energy

Ex.M

Mining

Energy

Ex.MMining

Energy

•Mining

Energy

Mining

Energy

RSA

1

2

3

45

6

7

SOUTHERN

AFRICA

Mining

Improvement

PerformanceEvaluation

Operation

Support Planning

Leadership

OH&S•

OCCUPATIONALHEALTH &

SAFETY

• Scope

• NormativeReferences

• Terms & Definitions

• Context of Organization

Improvement

PerformanceEvaluation

Operation

Support Planning

Leadership

QMS•

QUALITYMANAGEMENT

SYSTEM

• Introduction• Scope• Normative

References• Terms &

Definitions• Context of

Organization

ManagementReview

Targets &Objectives

Register

Aspects &ImpactsRegister

RiskAssessment

Matrix

LegalRequirements

QaulitySystem

Procedures

EMS•

ENVIRONMENTAL

MANAGEMENTSYSTEM

• Introduction• Scope• Normative

References• Terms &

Definitions• General

Requirements

ContinualImprovement

Integrated

Structuredand

Comprehensive

Human andCulturalFactors

BestAvailable

Information

Dynamic Inclusive

Customized

RMS•

RISKMANAGEMENT

SYSTEM

Mining

Energy

PAS 99

❾❿

Mining

Mining

Energy

1Pager

ISO 9001 : 2008

⌂ ⌂ ⌂ " IMS " ⌂ ⌂ ⌂

S M A R T

S -

M -

A -

R -

T -

Specfic

Measurable

Attainable

Realistic

Targets (SHEQR)

SMART

" IMS " - Integrated Management System

LIVEWORK

M A I N T E N A N C E

E N E R G Y SECTOR

LIVEWORK

M A I N T E N A N C E

E N E R G Y SECTOR

LIVE WORK - TECHNOLOGY '2000

MEDIUM (MHV)HIGH (HV)EXTRA HIGH

(EHV)

ENERGY SECTOR

LibraryBanner & Poster

( All Elements )

E N C Y C L O P E D I A

C3M • LIVE WORK MAINTENANCE

ALL Sectors - GENERIC ● EMS & RMS

ISO - Conformity

Industry - SECTORS

Manuals

Modules

∎Q

au

lity

∎E

nv

iro

nm

en

ta

l ∎R

isk

∎O

pe

ra

tio

na

l ∎A

ss

ets

∎P

er

for

ma

nc

e ∎

Ris

kA

na

lys

isu

a

AMS

PMS

RMS

TECHNICAL SPECIFICATION -ISO 9001 VS ISO/TS

LIVE WORK MAINTENANCE • • • METHODS

C3M™

SYSTEMOCSCONTROL

RAS AUDITS

PROCESSMANUALS

Compliance

"IMS" - Integrated Management System in Conformity to:

ISO 45001 : 2018……. OH&S …….Occupational Health & Safety

ISO 9001 : 2015……. QMS …….Quality Management System

ISO 14001 : 2004……. EMS …….Environmental Management System

ISO 31000 : 2018……. RMS …….Risk Management System

AUDITS • ALL ANSWERS REPORTS

❼ RISK ANALYSIS

QUALITY

RISK

ENVIRONMENTAL

OPERATIONAL

PERFORMANCE

ASSETS

RISK ANALYSISQUALITY ❶

ENVIRONMENTAL ❸

RISK ❷

❺ PERFORMANCE

❻ ASSET CONTROL

KPI's(HRD)

CONTROL SYSTEMS

LW / RAS

RMS

EMS

M A N U A L S

ENERGY SECTOR -ELECTRICAL ENGINEERING

" IMS "

INTEGRATED

MANAGEMENT SYSTEMEXTRA HIGH

( EHV)HIGH ( HV)

MEDIUM ( MHV)

O H & S

ISO

45001 : 2018

LIVE WORK MAINTENANCESTA URE

DM & QA

GLCR

MEDN

EOHSIM

SCAT

ITC

GQA

TAC

❸❹ ❺

❼❽ ❾

M O D U L E S

BIODIVERSITY

• OCS •

PERFORM

ANCEM

EASUREMENT

1Pager

ISO 9001 : 2008

⌂ ⌂ ⌂ " IMS " ⌂ ⌂ ⌂

S M A R T

S -

M -

A -

R -

T -

Specfic

Measurable

Attainable

Realistic

Targets (SHEQR)

QUALITY

ASSURANCE

Contracts, Systems, Training & AuditingLIVE WORK - TECHNOLOGY '2000

QUALITY

ASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

QUALITYASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

C3M

HS/BH&AM

Methods

SUBSTATION Methods

Insulating GLOVE Method

SPRAY WASHING Methods

AIR MOBILE

CONVENTIONAL

Substation Methods

Spray Washing Methods

Insulating Glove Method

2020

Safety

Health

Environment

Quality

Risk

S -

H -

E -

Q -

R -

S H E Q R

RSA

1

2

3

45

6

7

SOUTHERN

AFRICA

- OCS -BIODIVERSITY

- DM & QA -QUALITY ASSURANCE

- MEDN -MAINTENANCE OF

ELECTRICITY DELIVERY NETWORKS

- GLCR -GENERAL LOSS

CONTROL RULES

- EOHSIM -EMS & OH&S

INCIDENT MANAGEMENT

- SCAT -SYSTEMATIC CAUSE

ANALYSIS TECHNIQUE

LIVE WORK- GQA -

GUIDELINE FORQUALITY ASSURANCE

- TAC -TECHNICAL

AUDITING COURSE

- ITC -INSTRUCTOR

TRAINING COURSE

MODULES

LIVE WORK

MAINTENANCE

" I M S "INTEGRATED

MANAGEMENT

SYSTEM

- QMS -ISO 9001 : 2015

- EMS -ISO 14001 : 2015

- RMS -BS OHSAS 18001 : 2007

- OH & S -ISO 45001 : 2018

- RMS -ISO 31000 : 2018

- KPI -Key PerformanceIndicators (HRD)

MANUALS

PAS 99

- OCS -OPERATIONAL

CONTROL SYSTEM

- AMS -ASSET

MANAGEMENT SYSTEM

- PMS -PERFORMANCE

MANAGEMENT SYSTEM

- RAS -RISK MANAGEMENT SYSTEM

TRANSMISSION

DISTRIBUTION

SUBSTATION& SPRAY WASHING

RETICULATION

my BIOGRAPHY

HIGH

LEVEL

VALUE

CHAIN

CONS

TRUC

TION

REPA

IR

MAI

NTEN

ANCE

(

37

)

GENERIC - EMS • ISO 14001 : 2015 GENERIC - RMS • ISO 31000 :

EMERGENCYSECTORS ENERGY WATER MUNICIPLE AGRICULTURAL❶ ❷ ❸ ❹ ❺

❶❶

40YEARS

NEC3 ENGINEERING & CONSTRUCTION CONTRACT.

OCS

QMS

EMS

RAS

www.liveworkc3m.art.co.zaPDI/IMS/C3M™ - TM ® 2517237 / © Reserved

LIVE WORK MAINTENANCE • INTEGRATED MANAGEMENT SYSTEM

CONFORMITY

COMPLIANCE

Re

sp

on

sib

ilit

ies

WE

B

SIT

E

WEB SITE Page

ENERGY SECTOR

UTILITY

PRINCIPLE

CONTRACTOR

LW - STEERINIG

COMMITTTEE

TRAINING

MANAGER

RMS & EMS - SHEQ

MANAGEMENT

LIVE WORK

MANAGER

SENIOR

SUPERVISORS

FACILITATORS

OTS - TECHNICAL

SUPPORT

MODIRATOR

ASSESSORS

RAP - ASSESSMENT

PANEL (REGIONAL)

PiC

TEAM LEADER

TEAM MEMBER

COACH / LINE

INSTRUCTORS

GROUND

CO-ORDINATOR

HELICOPTER PILOT

CREW MEMBERS

HOT STICK

BARE HAND

AIR MOBILE

SUBSTATION

SPRAY

WASHING

INSULATING

GLOVE

PLAN - DO -

CHECK - ACT

MANAGEMENT

REVIEW

ISO & BSi AUDIT

2017 > 2019

K P I

KEY P

ERFO

RM

AN

CE IND

ICATO

RS

UN

IQU

E IDEN

TIFIERL

IVE W

OR

K -

METH

OD

SA

UTH

OR

ISEDP

ERSO

NN

ELLIV

EW

OR

K M

AIN

TENA

NC

E ●M

AN

AG

EMEN

TS

UPPO

RT

A.

B.

C.

MA

NU

AL 4

. VO

LUM

E :

RECO

RD

SYSTEM

MODULARUNIT STANDARD

PDI/IMS 008

AirMobile

GLO

VE

M

eth

od

LIVE WORK

METHODS

liveworkc3m-art.co.za

8Hot Stick • Bare Hand& Air Mobile Methods

GLOBAL DIRECTIVELIVE WORK MAINTENANCE

2015

COMPANY PROFILEC.Pr BUSINESS FRAMEWORKB.FrCreated by •

Created date • 2016-07-29 10:05:07 AM

Supplier type • CIPC

Supplier sub - type • Close Corporation (cc)

Supplier Registration number (RSA) • CK99 05020/23

Legal / Trading name • Power Delivery Industry

Maintenance Consultant cc.

Appointed date • 1999-02-02 12:00:00 AM

Supplier Industry • Energy Sector -

Electrical Engineering,

Live Work Maintenance.

C3M ™ - 2517237

Combination of Three Methods

( Insulating Glove, Hot Stick &

Bare Hand Methods ).

Supplier Industry Classification • Construction - Maintenance - Repair

( Classification 37 ).

Description of Principle Business • Setting Standards & Operational

Procedures for :-

Technical Live Works.

Country of origin • South Africa

Name (s) • Leon

Surname • Jansen van Vuuren

South Africa •

Identification number 5804055019087

Prefered communication method • Email SMS

Cell phone Whatsup

Telephone Postal

Telephone number • +27 11 393 2336

Cell phone number • +27 82 870 1095

Email •

Website address •

[email protected]

[email protected]

www.liveworkc3m.art.co.za

OH&S

I S O

9001

14001

31000

2 0 2 0

45001

INTEGRATEDFRAMEWORK

EMERGENCY SERVICES

AGRI-CULTURAL

ENERGY SECTOR

WATER SERVICES

MUNICIPAL &

WATER SERVICES

MINING

OPEN - PIT • STRIP •

QUARRYING

SERVICES • Advisory, Consulting,

SHEQR & Practical Training.

Live Work Maintenance Services

and other Public Sectors -

specific to GENERIC - EMS & RMS.

CONFORMITY • International ISO Standards

• Construction Land & Biodiversity

Integrated Management Systems :-

• ISO 45001 : 2018 - OH&S

( Occupational Health & Safety Act. )

• ISO 9001 : 2015 - QMS

( Quality Management System )

• ISO 14001 : 2015 - EMS

( Environmental Management System )

• ISO 31000 : 2018 - RMS

BS OHSAS 18001 : 2007

( Risk Management Systems )

• ASTM - OHSA 1910.269

COMPLIANCE • International Standards

• IEC - International Electro-technical

Commission.

• PES - Power & Energy Society

• IEEE.

National Standards

• OHS Act. -

( Occupational Health & Safety Act. )

• CR 2014 -

( Construction Regulations )

• EMS • ECA, NEMA, LEMA

• EOHSIM ( Incident Management )

PRODUCTS • Transmission, Distribution & Reticulation

( Overhead Lines & Substations).

• Clause 1. - 6.

• Manuals 1. - 6.

• Modules 1. - 9.

• Generic EMS & RMS :-

1. Environmental Management System

2. Risk Management System

SUSTAINABLE

•ENERGY

LIVE•

WORK•MAINTENANCE

OH&S

I S O

9001

14001

31000

2 0 2 0

45001

INTEGRATEDFRAMEWORK

NATIONAL & INTERNATIONAL • STANDARDS & SPECIFICATIONS

STANDARDS INTEGRATED FRAMEWORK

Conformity & ComplianceIntegrated Framework Standards & Specifications

ISO 9001 : 2015 QMS - Quality Management System

ISO 45001 : 2018 OH&S - Occupational Health & Safety

ISO 14001 : 2004 EMS - Environmental Management System

ISO 31000 : 2018 RMS - Risk Management System

OHS Act. 85 of 1993 OHS Act. - Occupational Health and Safety Act.

OHS Act. 18 GMR - General Machinery Regulation

OHS Act. 18(1) - (11) DMR - Driven Machinery Regulation

OHS Act. 16(1) OHS Act. - Employer

OHS Act. 16(2), 37(2) OHS Act. - Principle Contractor

CR 2014 CR - Construction Regulation

CR 2014 - Appointments CR - Construction Regulatory Appointments

COID Act COID - Compensation for Occupational Injuries & Diseases

National Energy Regulator NERSA - National Energy Regulator of South Africa

OHS Act. GMR 2(1) - OHS Act. - Competent Person for Machinery.

( Engineering Professional

Act. 200 (Act. 46 of 2000).

OHS Act. 85 of 1993.

DMR 18(5)

GMR 2.7(A) & GMR 5(1) T&E - Supervisor of Machinery Assistant Appointment.

(Tools & Equipment Testing)

Act No. 107, 1998 NEMA - National Environmental Management Act.

No. 19519 -

Government Gazette, 27 November 1999

Act No 7, 2003 LEMA - Limpopo Environmental Management Act.

Procedure & Environmental, Occupational Health and Safety

Presentation Incident Management

ORHVS ORHV/LW - Operating Regulations for Medium, High & Extra High Voltage Live Work.

OHSA 1910.269 - Occupational Health & Safety, Transmission & Distribution.

IEEE Std 516 - Guide for Maintenance Methods on Energised Power lines.

IEC 60743 - Guide for Maintenance Methods on Energised Power lines.

IEC 61472 - Live Working - Minimum Approach Distances - Method of Calculation.

IEC 60984 & Tests on Personal Protective Equipment

IEC 60903 ( Insulating Gloves & Sleeves ).

IEC 61112

& IEC Draft

IEC 60832 - Insulating Poles and Universal Tool Attachments for Live Working.

IEC 60855 - Insulating Foam-Filled Tubes and Solid Rods for Live Working.

ASTM F711 - Specification for Fibreglass Reinforced Plastic (FRP) Rod and Tube

used in Live Line Tools.

IEC 60895 - Conductive Clothing for Live Working at a Nominal Voltage up to 800 kV AC.

ANSI

A92.2-2001

IEC 61057 - Aerial Devices with Insulating Boom used for Live Working.

- Vehicle Mounted Elevating and Rotating Aerial Devices.

OHS Act. - AEM - Acoustic Emission Monitoring (SABS).

EOHSIM -

- Protective Covers of Insulating Material for Live Working on AC Installations.

LMI - Lifting Machine Inspector

INTERNATIONAL - MANDATORY / RULES / REGULATIONS

-

NATIONAL - INDUSTRY REGULATIONS / STANDARDS

PAS 99

National Environmental Management Act.

Act No. 107, 1998

No. 19519

Environmental Conservation Act.

ECA

Limpopo Environmental Management Act.

Act No 7, 2003

EOHSIM Procedure

Environmental, Occupational Health and

Safety Incident Management Procedure

INTERNATIONAL LOCAL Standards

QSP - CP-01-01

Management of Operational Risk

and Change Procedure

CR 2014 - SHEQR Appointments

ASTM - OHSA 1910.269

OHS Act. 85 of 1993 OHS Act - Occupational Health and Safety Act.

OHS - CR 2014 OHS CR - OHS Construction Regulations

OHS Act. 18 GMR - General Machinery Regulations

OHS Act. 18(1) - (11) DMR - Driven Machinery Regulations

OHS Act. 16(1) OHS Act - Employer

OHS Act. 16(2), 37(2) GMR - Principle Contractor

CR 2014 - Appointments CR - Construction Regulatory Appointments

COID Act COID - Compensation for Occupational Injuries & Deseases

ERA('C) ERA - Electricity Regulatory Authority (Commission)

Environmental Management System EMS - All Answers Report

Risk Management System RMS - All Answers Report

International Standards

…….

ISO 9001 : 2015 ……. QMS ……. Quality Management System

National Standards (RSA)

ISO 45001 : 2018

ISO 31000 : 2018 ……. RMS ……. Risk Management System

ISO 14001 : 2015 ……. EMS ……. Environmental Management System

OH&S ……. Occupational Health & Safety

Risk Management

Environmental Management

OHS Act.

RAS Audits

STD I.Fr

1. C.Pr • Company Profile

2. B.Fr • Business Framework

3. STD • Standards

4. I.Fr • Integrated Framework

5. m.Port • my Portrait

6. U.Id • Unique Identifiers

7. IMS • Integrated Management System

8. PAA • Power Africa Academy

9. QMS • Quality Management System

10. EMS • EnvironmentalManagement System

11. RMS • Risk Management System

12. OCS • Operational Control System

13. Ex.M • Executive Manual

14. M.1A • Integrated Management System

15. M.1B • Quality Management System

16. M.2 • EnvironmentalManagement System

17. M.3 • Risk Management System

18. M.4 • Operational Control System

19. M.5 • Performance & AssetMeasurement System

20. M.6 • Risk Analysis Systems

21. M.T&E • MEWP & Tools &Equipment Suppliers

22. PAA • Power Africa Academy

23. T&E.1 • Tools & Equipment- HS&BHMethods

24. T&E.2 • Tools & Equipment- IGMethod

25. TT.1 • Technical Training- HS&BHMethods

26. TT.2 • Technical Training- IGMethod

27. IT-Ex.KPLC • International TenderKenya 2017

28. IT-Pr.KPLC • Tender ProposalKenya 2017

29. UGANDA • Delegation & Presentation

30. ZAMBIA • EoI - Expression ofInterest

31. m.TH • my " Trainer" History

32. m.PoE • my Portfolio of Evidence

IDENTIFIERS

ACRONYMS

liveworkc3m-art.co.za

Hot Stick • Bare Hand& Air Mobile Methods

Substation

Spray Washing

Reticulation

Transmission & Distribution

Generic - EMS • RMSENERGY WATER

MUNICIPLE AGRICULTURAL EMERGENCY

SECTORS ❶ ❷

❸ ❹ ❺

AirMobile

GLO

VE

M

eth

od

Leon J van Vuuren,

the Author, Developer and Compiler of the Live Work Maintenance - Integrated Management System (IMS) has40 years of experience in the field of Transmission & Distribution inclusive of 16 years as Power DeliveryIndustry, Maintenance Consultant - Principle Contractor for Training and Maintenance Services with his Client -Eskom Holdings SOC Limited (RSA). He has exhibited the "IMS " internationally and gained " Global Expert2016 " recognition.

Excellence

The objective is to enable EXCELLENCE with Continuous Quality Improvement Process (CQIP) of products andservices to customer requirements with the specifications to integrating the ISO 45001 (OH&S), 9001 (QMS),14001 (EMS) and 31000 (RMS) requirements with the framework of a common management system - BSiPASS 99 and it has been developed to enable organizations to align their processes, procedures and services intoone holistic structure in order to operate more effectively and efficiently using the improvement tools, methodsand methodologies. The above includes Compliance to IEC, IEEE & PES specifications specific to Live WorkMaintenance.

▼ International Conformity and Compliance

In this model it is evident in the " STATURE " as a complete "IMS " with all the core and functional processesseamlessly interfaced for Transmission, Distribution and Reticulation as one Quality Management System withInternational Conformity and Technical Specification compliance across the board.

This process model is a detailed ● Reference Manual ● defined by a Technical Sheet System with captureddetail on a " One Pager " concept with more than 1,350 Technical Illustrations and sketches across all manualswhich includes :Manuals 1 - 6, Clause 1 - 6 and other model standard modules.

▼ " SMART "

Mr van Vuuren attributes his passion and success to SMART – Specific, Measurable, Attainable, Realistic, Targetsto (SHEQR) for the power industry to ensure customer satisfaction of power lines and substation up time duringLive Work Maintenance to " KEEP THE LIGHT ON ".

▼ ERA(C) Electricity Regulatory Authority (Commission)

NERSA - is a regulatory body established as juristic person in terms of Section 3 of the National Regulatory Act,2006 (Act No. 4 of 2006).● NERSA (RSA), ERA (Uganda) & ERB (Zambia) and other Countries regulates the energy industry inaccordance with government laws and policies, standards and international best practices in support ofsustainable development.● The organizations also issues licenses for electricity transmission and distribution; therefore the NationalEnergy Regulator is required to monitor and enforce compliance with the conditions of the licenses.

▼ C3M

Combination of three Methods -Insulating Glove, Hot Stick & Bare Hand Methods.

▼ Scope of Proposal

Provide the client with PDI "IMS" - Integrated Management System for Transmission and Distribution LiveWork Maintenance - C3M methods i.e. Insulating Glove, Hot Stick and Bare Hand Methods, 11kVthrough 400kV. Adopting / Interfacing of " IMS " Conformity to ISO 9001, ISO 14001, ISO 31000 & BSOHSAS 18001 / Compliance to IEC, IEEE & PES to client base.

▼ Target Group

Chief Executive Officers, Executive / Senior Managers, Engineers and other suitable qualified personnelinvolved in the operation and maintenance of Live Work Maintenance. Universities - Electrical Engineering.

Improvement

PerformanceEvaluation

Operation

Support Planning

Leadership

OH&S•

OCCUPATIONALHEALTH &

SAFETY

• Scope

• NormativeReferences

• Terms & Definitions

• Context of Organization

Improvement

PerformanceEvaluation

Operation

Support Planning

Leadership

QMS•

QUALITYMANAGEMENT

SYSTEM

• Introduction• Scope• Normative

References• Terms &

Definitions• Context of

Organization

ManagementReview

Targets &Objectives

Register

Aspects &ImpactsRegister

RiskAssessment

Matrix

LegalRequirements

QaulitySystem

Procedures

EMS•

ENVIRONMENTAL

MANAGEMENTSYSTEM

• Introduction• Scope• Normative

References• Terms &

Definitions• General

Requirements

ContinualImprovement

Integrated

Structuredand

Comprehensive

Human andCulturalFactors

BestAvailable

Information

Dynamic Inclusive

Customized

RMS•

RISKMANAGEMENT

SYSTEM

SHEQR" I M S "

ZEROTOLERANCE

QUALITY

ASSURANCE

Contracts, Systems, Training & AuditingLIVE WORK - TECHNOLOGY '2000

QUALITY

ASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

QUALITYASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

C3M

HS/BH&AM

Methods

SUBSTATION Methods

Insulating GLOVE Method

SPRAY WASHING Methods

AIR MOBILE

CONVENTIONAL

Substation Methods

Spray Washing Methods

Insulating Glove Method

ASSET CREATIONMANAGER

MAINTENANCE &OPERATION MANAGER

BUSINESS INTEGRATION &PERFORMANCE

MANAGER

SHEQR MANAGER

GENERAL

MANAGER

• M A

N C O

• EMS &

RMS

G E N

E R R I C • AL

SECTORS

e.g. of a RACI R A C I

ENERGY

AGRICULTURAL

MININGOPEN-PIT • STRIP • QUARRYING

WATER SERVICES

EMERGENCY SERVICES

MUNICIPLE& WATER

CON

STRUCTIO

N LA

ND

& BIO

DIV

ERSITY

SECTORS

RESOURCES, ROLES,

RESPONSIBILITIES

& AUTHORITY

ENERGY SECTORS

PRINCIPLE CONTRACTOR

LWM STEERINGCOMMITTEE

MA

NA

GEM

ENT SU

PPORT

TRAININGMANAGER

• P D E •UTILITY

S H E Q RMANAGEMENT

LIVE WORKMANAGER

SENIORSUPERVISORS

FACILITATORS

TECHNICALSUPPORT

RAP - ASSESSMENTPANEL (REGIONAL)

MODERATOR &ASSESSORS

A❶

• P i C •TEAM LEADER B⓬

• TM •TEAM MEMBER

AU

THO

RISED PERSO

NN

ELCOACH / LINEINSTRUCTOR

PRACTITIONER( INSTRUCTOR )

GROUNDCO-ORDINATOR

HELICOPTERPILOT

HELICOPTERCREW MEMBERS

L

LIVE WORK MAINTENANCE • • • METHODS

C3M™

SYSTEMOCSCONTROL

RAS AUDITS

GENERIC . . . . . . EMS & RMS

OH&S

I S O

9001

14001

31000

2 0 2 0

45001

INTEGRATEDFRAMEWORK

EMERGENCY SERVICES

AGRI-CULTURAL

ENERGY SECTOR

WATER SERVICES

MUNICIPAL &

WATER SERVICES

MINING

OPEN - PIT • STRIP •

QUARRYING

ENERGYSECTOR

ELECTRICALENGINEERING

EXECUTIVEMANAGEMENT

MANDATORYREGULATORY

&LEGISLATIVE

A Global Technical Directive

developed for RSA andother countries based on

Scientific Knowledge,Live Work Experience

&International

Best Practices

EXECUTIVEMANAGEMENT

LIVE WORKINTEGRTATED

MANAGEMENT

SYSTEM

• • • PROCESS MODEL • • •

❼ BOOKS - A, B & B.1

CLAUSE 1.

❸ BLACK FOLDER

❹ WHITE FOLDER

❺ A5 - FOLDER ● "IMS" PROCESS MODEL

"IMS" - INTEGRATED MANAGEMENT SYSTEM

❶ DMR ⦁ DOCUMENT MATRIX REGISTERS

❷ KPI - KEY PERFORMANCE INDICATORS

❻ RED FOLDER ● A4 - FOLDERS ( A - G )

ERA('C) INTRODUCTION

"IMS" - COMPLETE OVERVIEW

my SCROLL

INTERNATIONAL TENDER DOCUMENTS - C3M.A.CLAUSE A.

OH&S / ISO / QMS - MANUALS 1, 2 & 3.

HS&BHM's ● Hot Stick & Bare Hand Methods

BOOKS 1, 2 & 3. - TRAINING MODULES

OCS - MANUAL 4.

EMS ● ISO 14001 - Environmental Management System

QMS ● ISO 9001 - Quality Management System

RMS ● ISO 31000 - Risk Management System

LIVE WORK ⦁ Requisites, Appointments & Certifications

❶ OH&S ● ISO 45001 - Occupational Health & Safety

CLAUSE 2. ❽

❸CLAUSE 3.

PMS ● Performance Measurement System

AMS ● Asset Management System

CLAUSE 6.

AUDIT SYSTEMS - MANUAL 6.

SS&SWM's ● Substation & Spray Washing Methods

IGM ● Insulating Glove Method

VO

LUM

E

CLAUSE 4.

RMS

CLAUSE 5.

PMS & AMS - MANUAL 5.

CLAUSE 7. ⓭ T&E Tools & Equipment by IEC Classification

Live Work - Risk Analysis System

Risk Management System

Environmental Management System

Appointments & Certification

LW / RAS

EMS

SHEQR

CLAUSE 10. EoI - Expression of Interest / Contract Awards

Amendments - Document Control & Record

"IMS" Notes / Remarks

⓯ T&D - Client Task ManualsNEC3

CLAUSE 9.

CLAUSE 8. ⓮ Principle Contractor - Special ContractsPc

Integrated Management System

RSA

1

2

3

45

6

7

SOUTHERN

AFRICA

QUALITY

ASSURANCE

Contracts, Systems, Training & AuditingLIVE WORK - TECHNOLOGY '2000

QUALITY

ASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

QUALITYASSURANCE

MANAGEMENT

LIVE WORK - TECHNOLOGY

C3M

HS/BH&AM

Methods

SUBSTATION Methods

Insulating GLOVE Method

SPRAY WASHING Methods

AIR MOBILE

CONVENTIONAL

Substation Methods

Spray Washing Methods

Insulating Glove Method

AirMobile

GLO

VE

M

eth

od

∎ Qaulity ∎ Environmental ∎ Risk ∎ Operational ∎ Assets ∎ Performance ∎ Risk Analysisua

UniqueIdentifiers

EXTRA HIGH (EHV)

HIGH (HV)

MEDIUM (MHV)

ENGINEERING

LIVE WORK

METHODS

- OCS -BIODIVERSITY

- DM & QA -QUALITY ASSURANCE

- MEDN -MAINTENANCE OF

ELECTRICITY DELIVERY NETWORKS

- GLCR -GENERAL LOSS

CONTROL RULES

- EOHSIM -EMS & OH&S

INCIDENT MANAGEMENT

- SCAT -SYSTEMATIC CAUSE

ANALYSIS TECHNIQUE

LIVE WORK- GQA -

GUIDELINE FORQUALITY ASSURANCE

- TAC -TECHNICAL

AUDITING COURSE

- ITC -INSTRUCTOR

TRAINING COURSE

MODULES

LIVE WORK

MAINTENANCE

" I M S "INTEGRATED

MANAGEMENT

SYSTEM

- QMS -ISO 9001 : 2015

- EMS -ISO 14001 : 2015

- RMS -BS OHSAS 18001 : 2007

- OH & S -ISO 45001 : 2018

- RMS -ISO 31000 : 2018

- KPI -Key PerformanceIndicators (HRD)

MANUALS

PAS 99

- OCS -OPERATIONAL

CONTROL SYSTEM

- AMS -ASSET

MANAGEMENT SYSTEM

- PMS -PERFORMANCE

MANAGEMENT SYSTEM

- RAS -RISK MANAGEMENT SYSTEM

TRANSMISSION

DISTRIBUTION

SUBSTATION& SPRAY WASHING

RETICULATION

CONFORMITY

COMPLIANCE

Re

sp

on

sib

ilit

ies

WE

B

SIT

E

WEB SITE Page

ENERGY SECTOR

UTILITY

PRINCIPLE

CONTRACTOR

LW - STEERINIG

COMMITTTEE

TRAINING

MANAGER

RMS & EMS - SHEQ

MANAGEMENT

LIVE WORK

MANAGER

SENIOR

SUPERVISORS

FACILITATORS

OTS - TECHNICAL

SUPPORT

MODIRATOR

ASSESSORS

RAP - ASSESSMENT

PANEL (REGIONAL)

PiC

TEAM LEADER

TEAM MEMBER

COACH / LINE

INSTRUCTORS

GROUND

CO-ORDINATOR

HELICOPTER PILOT

CREW MEMBERS

HOT STICK

BARE HAND

AIR MOBILE

SUBSTATION

SPRAY

WASHING

INSULATING

GLOVE

PLAN - DO -

CHECK - ACT

MANAGEMENT

REVIEW

ISO & BSi AUDIT

2017 > 2019

K P I

KEY

PER

FOR

MA

NC

E IND

ICA

TOR

SU

NIQ

UE ID

ENTIFIER

LIV

E WO

RK

-M

ETHO

DS

AU

THO

RISED

PER

SON

NEL

LIVE

WO

RK

MA

INTEN

AN

CE ●

MA

NA

GEM

ENT

SU

PP

OR

T

A.

B.

C.

MA

NU

AL 4

. VO

LUM

E :

REC

OR

D S

YSTEM

MODULARUNIT STANDARD

PDI/IMS 008

ENERGYSECTOR

ELECTRICALENGINEERING

EXECUTIVEMANAGEMENT

MANDATORYREGULATORY

&LEGISLATIVE

A Global Technical Directive

developed for RSA andother countries based on

Scientific Knowledge,Live Work Experience

&International

Best Practices

EXECUTIVEMANAGEMENT

LIVE WORKINTEGRTATED

MANAGEMENT

SYSTEM

INTEGRATEDMANAGEMENT