    Dear Sir/ Madam,

    I am sending my resume for appropriate post.I have 10 years & 1 month experience in Erection & Commissioning, Operation &Maintenance andPlanning of 4X250 MW Hydro Power plant.

    Presently working with Nam Theun 2 power company, Laos (Electricity De France majorshare holder) w.e.f 20/10/09.

    Involved in erection and commissioning of 4X250 MW + 2X35 MW Nam Theun 2 Power Company.

    Involved in erection and commissioning of 4X250 MW Karcham Wangto Hydro Power Plant of JAI

    PRAKASH Group (Annual Turnover Rs 7000 crores) w.e.f Aug 07 to Oct 09..

    Four year in Operation & Maintenance of 330 mw power plant of JAI PRAKASH group awardedgold shield for 2007-2008 by ministry of power.

    Attended ISO 14001 training course by SGS Thailand.

    Involved in Dimensional & profile Inspection of Fabricated Assemblies, Machined components etcsuch as DRAFT TUBE LINER,SPIRAL CASING AND GUIDE VANES etc.

    I have completed one week training programme on Advanced Welding Technology and NonDestructive Test conducted by Welding Research Institute, Bharat Heavy ElectricalsLimited, Tiruchirapalli.

    Two month complete runner weld repairing and RoboticHVOF coating (in technical collaboration withTechno lab) work at HEAVY ENGINEERING WORKSHOP, REWA, M.P.All these activities were heldunder my supervision

    Regards,

    MANVENDRA MISHRA

    Senior Engineer (Maintenance & Planning)

    Nam Theun 2 Power Company (Electricity De France)

    Unit 09, Nong Bone village, Xaysettha District,

    P.O. Box 5862, Vientiane Capital, Lao PDR.Mobile No.-+8562022230506Skype id- manavjhpl

    1. Joining Time required -1 month or less.

    2. Passport No - Z21282663. Have LMV DRIVING LICENCE Yes

  • 7/27/2019 Manav Ere August 13

    2/3

    RESUMEMANVENDRA MISHRAC/O Sri RAGHVENDRA MISHRA2-A-69,TASKAND COLONEY,OBRA THERMAL POWER PLANT,OBRA,SONEBHADRA,U.P.PIN-231219Mo. 0856-0202230506, 918009758848Email: [email protected]

    [email protected]

    SUMMARYMechanical Engineering 3 years Diploma and 10 years & 1 month experience in Erection &Commissioning, Operation & Maintenance & Planning of Power plant from 2nd August. 2003 till date.

    EXPERIENCE

    Presently working with Nam Theun 2 power company, Laos (Electricity De Francemajor share holder) w.e.f 20/10/09.

    Involved in erection and commissioning of 4X250 MW + 2X35 MW Nam Theun 2 Power Company.

    Involved in erection and commissioning of 4X250 MW Karcham Wangto Power Plant of JAI PRAKASHGroup w.e.f Aug 07 to Oct 09.

    Four year in Operation & Maintenance of 330 MW Power Plant of JAIPRAKASH group awarded Gold shieldfor 2007-2008 by ministry of power.

    One week training programme on WELDING TECHNOLOGY & NDT at WeldingResearch Institute, BHEL ,Tiruchirapalli from 19 Feb 07 to 24 Feb. 07.

    Three week training programme on Operation and Mantainence of Hydro Power Plant at PowerManagement Institute, NTPC, Noida from 17 thDec 07 to 6th Jan 07.

    Two month complete runner weld repairing, and RoboticHVOF coating (in technical collaboration with Technolab) work at HEAVY ENGINEERING WORKSHOP, REWA, M.P.All these activities were held under my

    supervision

    JOB PROFILENam Theun 2 Power Company, Laos (Electricity De France) 1080 MW Power Plant (Oct 09 to Present)Senior Engineer Maintenance & Planning

    Involved in erection and commissioning of 4X250 MW Nam Theun 2 Power Company of Electricity DeFrance Group, France (One of the worlds biggest group in Power Generation).

    Timely and safe execution of erection & commissioning activities as per given erection schedule.

    Looking after safety of man and material at site.

    Preparing day by day activity plan of erection and commissioning.

    Daily T&C activity planning and monitoring of Nam Theun 2 Power Company.

    Preparing daily report of erection, commissioning and operational events as specified in the work instructions.

    Adopting the erection and commissioning procedure as given in suppliers technical manual.

    Erection of 4X250MW Francis Turbine (Andritz make)

    Follw up Erection and maintenance of Dam Hydraulic Gates (Radial and Flap).

    Preparation of punch list & Warranty Defect Notification for various equipments of Power House, Dam site,Substation and Regulating Dam.

    Implementation and In charge of Preventive & Corrective maintenance planning.

    Preparation of Preventive Maintenance Master Plan including all the maintenance activities for each & everyequipments of Power House, Dam site, Substation and Regulating Dam.

    Preparation of the 7 years maintenance rolling program of NT2 and yearly planned outages program.

    In charge of the preparation of the yearly maintenance planning and follows it up during the year, in respect ofthe PPAs, with the maintenance sections and operation department.

    mailto:[email protected]:[email protected]
  • 7/27/2019 Manav Ere August 13

    3/3

    In charge of the preparation and monitoring of the maintenance indicators for Preventive Maintenance /Corrective Maintenance.

    Collection of all maintenance section weekly, monthly and yearly reports and preparation of the maintenancedepartments ones .

    Implementation and application of Computerized Maintenance Management System (CMMS) for Maintenanceactivities.

    In charge of Corrective and Preventive Work order initiation and follow up.

    Planning and Co ordination with various Contractors for shutdown maintenance work.

    In charge of the management of the monthly / weekly planning for the maintenance department (resources /activities).

    Preparation of various reports.

    Supervision of maintenance activities during outage.

    Fault & Trip analysis.

    Jai Prakash Power Ventures LimitedKarcham Wangtoo Hydro Electric Project 4X250 MW (Aug 07 to Oct 09.)Electromechanical Engineer (Site Installation)

    Involved in erection and commissioning of 4X250 MW Karcham Wangtoo Power Plant of JAI PRAKASHGroup.

    Timely and safe execution of erection & commissioning activities as per given erection schedule.

    Looking after safety of man and material at site.

    Safe handling, lifting and proper storage of site material.

    Preparation of daily work record, problem faced, important and pending activities.

    Preparing day by day activity plan of erection and commissioning.

    Planning for man power requirement as per given erection and commissioning schedule.

    Preparing daily report of erection, commissioning and operational events as specified in the work instructions.

    Adopting the erection and commissioning procedure as given in suppliers technical manual.

    Erection of 4X250MW Francis Turbine (Andritz make)

    Erection of 4 X 277.8 Mva Synchronous Generator (Siemens make)

    Erection of 275 ton, 210 ton, 180 ton E.O.T. crane. (Unique make)

    BASPA II 3X100 MW (Aug 03 Aug 07)

    Assistant Engineer Mechanical

    Overall maintenance of Power Plant including Generator, Turbine and auxiliaries.

    TECHNICAL QUALIFICATIONDIPLOMA IN MECHANICAL ENGINEERING Feroze Gandhi Institute of Engineering TechnologyFINAL YEAR 2003First division (76.9%)SOFTWARE EXPOSURE

    MS OFFICE, AUTO CAD2000, MS PROJECT, ERP, I planning, CMMS (GP Mate), Crystal Report.PERSONAL INFORMATION

    Fathers name : Sri Krishna Nand MishraDate of birth : 23 rdaugust 1983Sex : MalePhysical status : Weight: 69 kg, height: 178cmsMartial status : SingleLinguistic ability : Hindi, English, Thai, Lao, FrenchExpected salary : As per company norms.Passport No. : Z2128266