12
1 RESUME NAME : MOHD FAIS BIN MOHD NADZIR ADDRESS : NO 4322, LORONG TENGGIRI 1, TAMAN DESA PERMAI, 71000 PORT DICKSON, NEGERI SEMBILAN DARULKHUSUS, MALAYSIA I/C NO : 821004-06-5679 DATE OF BIRTH : 04 OCTOBER 1982 STATUS : MARRIED EDUCATION : CERTIFICATE OF CIVIL ENGINEERING (POLITECHNIC PORT DICKSON) (DECEMBER 2004 ) SIJIL PELAJARAN MALAYSIA SECOND GRADE, (DECEMBER 1999) CURRENT STUDY : UNIVERSITY TECHNOLOGY MALAYSIA EXECUTIVE DIPLOMA IN OPERATION AND PRODUCTION MANAGEMENT (2014-PRESENT) CONTACT NUMBER : +60192572523 / +601123756036 EMAIL ADDRESS : [email protected] CERTIFICATION SKILLS : CRANE INSPECTION (ABM/CIDB) LIFTING SUPERVISOR (ABM/CIDB) SLINGGING AND RIGGING (ABM/CIDB) AESP (NIOSH)

RESUME FAIS 8 2016 PIC H

Embed Size (px)

Citation preview

Page 1: RESUME FAIS 8 2016 PIC H

1

RESUME

NAME : MOHD FAIS BIN MOHD NADZIR

ADDRESS : NO 4322, LORONG TENGGIRI 1,

TAMAN DESA PERMAI,

71000 PORT DICKSON,

NEGERI SEMBILAN DARULKHUSUS,

MALAYSIA

I/C NO : 821004-06-5679

DATE OF BIRTH : 04 OCTOBER 1982

STATUS : MARRIED

EDUCATION : CERTIFICATE OF CIVIL ENGINEERING

(POLITECHNIC PORT DICKSON)

(DECEMBER 2004 )

SIJIL PELAJARAN MALAYSIA

SECOND GRADE,

(DECEMBER 1999)

CURRENT STUDY : UNIVERSITY TECHNOLOGY MALAYSIA

EXECUTIVE DIPLOMA IN OPERATION AND PRODUCTION

MANAGEMENT (2014-PRESENT)

CONTACT NUMBER : +60192572523 / +601123756036

EMAIL ADDRESS : [email protected]

CERTIFICATION SKILLS : CRANE INSPECTION (ABM/CIDB)

LIFTING SUPERVISOR (ABM/CIDB)

SLINGGING AND RIGGING (ABM/CIDB)

AESP (NIOSH)

Page 2: RESUME FAIS 8 2016 PIC H

2

COURSE ATTENDED :

ATTEND SLINGGING AND RIGGING CORSE BY ABN/CIDB

ATTEND LIFTING SUPERVISOR COURSE BY ABN / CIDB

ATTEND CRANE INSPECTOR COURSE BY ABN /CIDB

ATTEND AUTHORISED ENTRANT AND STANDBY PERSON FOR CONFINED SPACE BY NIOSH

ATTEND CONSTRUCTION OF PRESSURE VESSEL ASME

DEVISION 1 (COVERED DESIGN, FABRICATION, TESTING

AND STAMPING )BY ABS CONSULTAN

ATTENDED BASIC WELDING REQUIREMENTS TO

FABRICATION PROCESS. BY KNM.

ATTENDED ERP SYSTEM BY KNM.

ATTENDED 3 DAYS CIVIL ENGINEERING COURSE

BY IKRAM. ( SUB SOIL DRAINAGE SYSTEM )

ATTENDED 1 DAY CIVIL ENGINEERING COURSE

LAND SURVEYOR ( KADASTRA & TOPOGRAFI )

BY JUPEM.

ATTENDED 4 DAYS CIVIL ENGINEERING COURSE

OF SEPTIC TANK HANDLING AND SERVICE AT GLORY BEACH RESORT, PORT DICKSON.

CONDUCT BY INDAH WATER.

ATTENDED 14 DAYS JATIDIRI COURSE BY IKBN

ULU SEPRI, REMBAU NEGERI SEMBILAN.

CAREER OBJECTIVES

To gain an entry-level position in a progressive and established organization that offers

valuable experience, training and career enhancement in the related field.

PERSONAL TRAITS

I am positive thinking person, a quick learner in any field, willing to work hard,

ambitious, highly motivated and have leadership qualities. I can work under pressure

& very low supervision .

Page 3: RESUME FAIS 8 2016 PIC H

3

SKILLS

Communication

Bahasa Malaysia - Excellent in speaking and writing

English - Fair in speaking and Fair in writing

Computer

Microsoft Office

(Word, PowerPoint, Excel, Access and Publisher)- good

Microsoft Project

(Literate)

Software Engineering

( AutoCAD ) - Fair

Skills • Excellent in supervision & sequence of tank erection/ pressure vessel / piping/ skid

and structural fabrication. • Good in managing site construction.

• Good in Lifting and Jacking process

• Good skill for Theodolite & Levelling measure equipment.

• Specialist in fabrication of heavy wall vessel & others equipment for oil & gas / mining process equipment.

• Good experience for bore cladded nozzle welding overlay • Well known in Lead Lining to plate surfaces

• Familiars with ASME/BS & AS fabrication code

• Familiars with U/U2 code • Very familiar to performed & monitoring Post Weld Heat Treatment (PWHT) /

Dehydrogenation • Heat Treatment after welding for welds in P4 and P5 materials.( DHT)

/Intermediate stress relieving

• (ISR). • Familiar to witness Hydro test

• Very Good Knowledge in Welding Procedures & Sequences. • Experience in bolt tensioning activities

• Familiar with ISO 9001 • Knowledge with ISO 14000 & ISO 18000

Good knowledge in NDE requirement & application

Page 4: RESUME FAIS 8 2016 PIC H

4

WORKING EXPERIENCE

05/2012- present MMC TEPAT TEKNIK SDN.BHD

MAY 2012 – PRESENT

SITE MANAGER

07/2014 PRESENT

ASSISTANT OPERATION, MANAGER

05/2012 TO 06/2014

• To act as the management representative for production both internally and

externally.

• To initiate, coordinate and advise on the planning for the use of preferred

practices between QA / QC and production supervisors.

• To maintain an effective communication system for the Management system

throughout the company.

• To manage manpower resources including allocation of manpower to

projects, planning and forecasting future requirement, identifying and recruiting

suitable candidates to maintain or increase staff levels as required.

• To define and implement department’s goals for improved capability and

quality including standardization, improved work practices and procedures.

• To undertake work planning for all tasks to ensure adequate resources and

timely completion.

• To acquire knowledge on fabrication techniques through publications,

training or other means and implement the latest fabrication techniques to the

company in order to control the cost fabrication.

• To recommend new ideas for improvement as necessary to enable the

company to have better competitive edge over competitors.

Page 5: RESUME FAIS 8 2016 PIC H

5

05/2005 – 05/2012 KNM PROCESS SYSTEM,

ACT. PRODUCTION HEAD

• Planned, lead and organized operational and strategic action associated with successfully delivering the project to practical completion and achieving the targeted

project profitability.

• Performed & manage all production works as per company’s approved procedures. • Reviewed all related production reports and to communicate to various department.

• Ensured that production schedule completed on time and at the same time follow the

quality requirement • Responsible to handle Client representative for any requirement during meeting & job

running. • Monitoring of project budget during fabrication & operation to ensure project

running in smooth condition & maximize project profit margin.

PRODUCTION SUPERVISOR,

• Responsible to control & supervise the review fabrication drawings & revert to

engineering department.

• Responsible to control, supervise & monitoring of each project production

schedule to ensure timely completion.

• Responsible to control & supervise planning & monitoring of each project

resources requirements eg: Materials, manpower, facilities & equipment’s.

• Responsible to control, supervise & coordinate the timely delivery of finished

products with logistic, Material Controller, & quality control section.

• Responsible to control & supervise the productivity & optimizing production

cost.

• Strictly adhere to the ISO9001 QA Manual and procedure.

• Performed production works as per company’s approved procedures.

• Prepared all related production reports and to communicate to various

department.

• Ensured that production schedule completed on time and at the same time

follow the quality requirement.

Page 6: RESUME FAIS 8 2016 PIC H

6

PROJECT INVOLVED MMC TEPAT TEKNIK:

1 Project : HIBISCUS PETRONAS BASF PROJECT

Client : WORLEY PARSON Equipment : Storage Tank ( 2 unit)

2 Project : Terengganu Gas Terminal (TGAST) Client : Samsung Engineering Co. Ltd

Equipment : Storage Tank ( 7 unit)

3 Project : New Maintenance Workshop Pelabuhan Tanjung Pelepas Client : MMC Engineering and Services

Equipment : Structural and Mechanical work

4 Project : TNB Jana Manjung 4 Client : Alstom Services Sdn Bhd

Equipment : Storage Tank

5 Project :Sabah Oil & Gas Terminal (SOGT) Client : Emerson Process Management Asia Pacific

Pte Ltd Equipment : Crude Oil Metering Skid & Condensate Metering Skid

6 Project :Sabah Oil & Gas Terminal (SOGT) Client : Emerson Process Management Asia Pacific Pte Ltd

Equipment : Gas Metering Skid

7 Project : Manjung Power Plant Unit 4

Client : Alstom Services Sdn Bhd Equipment : Air and Gas Ducts

8 Project : Stainless Steel Mill - Phase 2

Client : Andritz Power Sdn Bhd Equipment : Furnace Chamber

9 Project : Cendor Phase 2 Develpoment Client : Citech Energy Recovery Systems UK Ltd

Equipment : WHRU Casing

10 Project : Tanjung Bin 4

Client : Alstom Services Sdn Bhd Equipment : Main Cooling Water (MCW) Pipe & Pumphouse Header

11 Project : Sabah Ammonia Urea (SAMUR) Client : Mitsubhishi Heavy Industries Ltd

Equipment : Non Pressure Tanks

12 Project : New Engineering Workshop, PTP

Client : MMC Engineering & Construction Sdn Bhd Equipment : Structural Steel Works

13 Project : Kuantan Resin Project Client : Flexsys Chemical (M) Sdn Bhd

Equipment : Storage Tanks

Page 7: RESUME FAIS 8 2016 PIC H

7

PROJECT INVOLVED KNM

10/2008-05/2015 Supervised production schedule and progress on

4 Heavy Wall Vessel ( AUTOCLAVES ), for PUBLO VIEJO

PROJECT , DOMINICAN REPUBLIC. K0605070 –

Client : HATCH. Owner: BARRICK GOLD MINNING.

Material – SA 516 Gr 70N + 10mm lead linning

Thickness – 100mm

Acceptance Criteria – U Stamp Vessel

WEIGHT : 850 TON PER UNIT

06/2008-12/2008 Supervised production schedule and progress on

8 Heavy Wall Vessel & 2 Bullet Tank, for Peru LNG Export

Facility Project, PERU. K0611029 – Client : Southern Tropic

Material Supply.Co/ CB&I. Owner: PERU LNG S.R.L.

Material – SA 516 Gr 70N

Thickness – 105mm, 50mm, 70mm, 85mm

Acceptance Criteria – U Stamp Vessel

02/2007-06/2008 Supervised production schedule and progress on

Fushon Project, China. K050732- Alberta Taciuk

Processing. The client is Polysius AG.

Material –SA240-321H ( STAINLESS STEEL ) +

SA 387 Gr 11 CL.2 (Chromoly) + EN 10028-3-P275 NL1.

Thickness – 105mm, 50mm, 70mm, 85mm

Acceptance Criteria – ASME VIII Div 1 App 12/ PD 5500

11/2006 – 04/2007 Supervised production schedule and progress on

Dong Quat Refinery Project (DQR), Vietnam

K 051260 – Heavy Naphtha Stripper & LCO Stripper

Debutaniser. The client is JGC and the owner is Vietnam

Oil & Gas Corp.

Material – SA 516 Gr 60 + SA 106 Gr B

Thickness – 13mm to 42mm

Acceptance Criteria – ASME VIII Div 1 App 12

11/2006 – 08/2007 Supervised production schedule and progress on Air

Separation Unit For Mega Methanol Plant Labuan

K 050965. The client is Air Liquide and owner is Petronas

Methanol Labuan

Material – SA 516 Gr 70N

Thickness – 36mm

Acceptance Criteria – ASME VIII Div 1 2004 edition +

2005 addenda

11/2006 – 06/2007 Supervised production schedule and progress on

Petronas Methanol Labuan Project K 051110 – R 01004

Seconday Reformer. The client is LURGI and the owner is

Petronas Methanol Labuan.

Material – SA 387 Gr 11 CL.2 (Chromoly)

Thickness – 50mm, 58mm, 72mm, 82mm

Acceptance Criteria – ASME VIII Div 1 App 12/ PD 5500

Page 8: RESUME FAIS 8 2016 PIC H

8

10/2006 – 11/2007 Supervised production schedule and progress on

ABB/LUMMUS/TOYO ENG CORP. Project K 051115 –

C11022 (Cautic/Water Wash Tower), C11401

(Deethanizer), C11402 (Ethlylene Fractionator), C11405

(Propylene Fractionator), C13201 (Ed Column) & C11301

(Demethaniser). The owner is Shell Eastern Petroleum

Pte Ltd

Material – P355 NL2 / SA516GR60N

Thickness – 22mm, 26mm, 28mm, 42mm

Acceptance Criteria – PD 5500:2103 Table 5.7.2 / ASME

VIII Div 1

10/2006 – 04/2007 Supervised production schedule and progress on

Dong Quat Refinery Project K 050774 – T 2103

Propane/Propylene Splitter. The owner is Vietnam Oil &

Gas Corporation.

Material – A 516 Gr 70

Thickness – 50mm

Acceptance Criteria – ASME VIII Div 1 App 12 2004

edition / TCVN 6008-1995

09/2006 – 05/2007 Supervised production schedule and progress on 2 HP

Absorbers for OGD III Onshore Gas Development

Project K 050421. The client is Eastern Bechtel (EBCL)

and the owner of the project is GASCO, Abu Dhabi Gas

Industries Ltd.

Material – SA 516M Gr 450N

Thickness – 147mm

Acceptance Criteria – ASME VIII Div 2 Article 9-3, ASME

Sect. V Ed. 2004 Addenda 2006, Code Case 2235-9

05/2006 – 11/2006 Supervised production schedule and progress on 4

Heavy Wall SS Vessel for North West Shelf (NWS) Project

K 050365 LNG Australia. The client is Foster Wheeler

UK/Woodside Energy LTD

Material – SA 240 TP 304 / SA 182F 304 / BS1501-304S61 /

BS1503-304S61 / SA 312 TP 304

Thickness – 29mm, 68mm, 72mm , 90mm

Acceptance Criteria – AS 4037 + AS 1210

02/2006 – 06/2006 Supervised production schedule and progress on Acid

Settler–Alky Revap Project K 04270 for Valero

Wilmington SA, USA Fluor. The owner is Valero

Wilmington Refinery.

Material – SA 516 Gr 70N

Thickness – 12mm, 12.7mm, 15mm

Acceptance Criteria – ASME VIII Div 1 2004 edition

03/2006 – 04/2006 Supervised production schedule and progress on G3

Alcan Gove Expansion Project K 04914 – 30 Units Vessels

(Flash, Digestors, Conical, Decanters – Vessels). The

client is Alcan Gove Development Pty Ltd.

Material – A 516 Gr 70 / A 106 Gr B / A 105

Thickness – 25mm

Acceptance Criteria – ASME VIII Div 1 App 12 2004

edition

Page 9: RESUME FAIS 8 2016 PIC H

9

01/2006 – 04/2006 Supervised production schedule and progress on Acid

Dump Tank-Alky Revap Project K 050516 for Valero

Wilmington SA, USA Fluor. The owner is Valero

Wilmington Refinery.

Material – SA 516 Gr 70N

Thickness – 25.4mm , 29mm, 34mm

Acceptance Criteria – ASME VIII Div 1

01/2006 – 04/2006 Supervised production schedule and progress on 2

Large Towers for Sohar Fertilizer Project K 041074, Oman.

The owner is Mitsubishi Heavy Industries (MHI).

Material – SA 516 Gr 70N

Thickness – 33mm, 38mm, 62+3mmt

Acceptance Criteria – ASME VIII Div 1

12/2004 – 05/2005 ZANORSHA CONSTRUCTION S.B

SITE SUPERVISOR

To monitor & involved all technical work at site.

To follow up whatever material for on going project.

To record daily progress and manpower on going

project.

To make sure the progress follow the monthly schedule.

PROJECT INVOLVED

04– 05/2005 PROJEK KERJA-KERJA MENAIKTARAF JALAN KAMPONG

DI KAMPONG PASIR PANJANG, PORT DICKSON NEGERI

SEMBILAN.

TENDER : JABATAN KERJA RAYA

NILAI PROJEK : RM 75,000.00

02 – 03/2005 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN

SEBUAH BALAIRAYA BERUKURAN 70’ x 40’ DI KAMPONG

PAYA LAMA, PORT DICKSON NEGERI SEMBILAN.

TENDER : PEJABAT DAERAH PORT DICKSON.

NILAI PROJEK : RM 125,000.00

02 – 04/2005 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN

SEBUAH RUMAH JANAKUASA UNTUK INSTITUT LATIHAN

FAMA, PORT DICKSON, NEGERI SEMBILAN.

TENDER : FAMA

NILAI PROJEK : RM 113,000.00

12/2004 – 03/2005 PROJEK KERJA-KERJA MENAIKTARAF SISTEM PERPARITAN

DI SUNGAI HJ.ALI, MUKIM LUKUT, PORT DICKSON NEGERI

SEMBILAN.

TENDER : JABATAN PENGAIRAN DAN SALIRAN

NILAI PROJEK : RM 217,000.00

Page 10: RESUME FAIS 8 2016 PIC H

10

01/2001 – 06/2002 AWALUDDIN ENTERPRISE.

CLERK OF WORK

To follow up whatever material for on going project.

To record daily progress and manpower on going

project.

To make sure the progress follow the monthly schedule.

PROJECT INVOLVED

01/2001 – 06/2002 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN

SEBUAH MAKMAL SAINS DUA TINGKAT, SEBUAH BILIK

KEBAL DAN SEBUAH BLOK BILIK DARJAH 3 TINGKAT DI

SEKOLAH MENEGAH RAJA JUMAAT, LUKUT NEGERI

SEMBILAN D.K.

TENDER : JABATAN KERJA RAYA MALAYSIA.

NILAI PROJEK : RM 2,136,000.00

Page 11: RESUME FAIS 8 2016 PIC H

11

REFERENCE

MR. GHANI HASAN

COO

MMC TEPAT TEKNIK SDN BHD

0196643837

RANO ARIFF MUSA

SR PROJECT MANAGER

MMC TEPAT TEKNIK SDN BHD

0123608684

HARIRI ABD GHANI

PROJECT MANAGER

MMC TEPAT TEKNIK SDN BHD

0192736240

MR. AZLAN GOH / MR. WONG KING

WORKS MANAGER ,

KNM PROCESS SYSTEM.

09-5838340/44/46

MR. BRUNO VERKOTER

PRODUCTION MANAGER ,

KNM PROCESS SYSTEM.

09-5838340/44/46

MR. LEO BANIAS BERNASOL

PRODUCTION HEAD ,

KNM PROCESS SYSTEM.

09-5838340/44/46

MR. ZAMRI BIN SHARIFF,

MANAGING DIRECTOR,

PEMBINAAN ZANORSHA S.B.

06-6517844

Page 12: RESUME FAIS 8 2016 PIC H

12