VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer CO Asphalt Programs

TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

VDOT’S PREVENTIVE MAINTENANCE

TECHNIQUES & EXPECTATIONS

1

2017 Asphalt Regional Seminars

Todd Rorrer

Regional Field Engineer

CO Asphalt Programs

Page 2: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

• Thin Hot Mix Asphalt Concrete Overlay (THMACO)

• Surface Treatments/ Seal Coats

• Slurry Surfacing and Micro Surfacing

• Cape Seal (Surface Treatment and Slurry Combined)

• SM-4.75

VDOT’S PREVENTIVE MAINTENANCE

TECHNIQUES & EXPECTATIONS

2

Page 3: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Thin Hot Mix Asphalt Concrete

Overlay

3

Page 4: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Thin Hot Mix Asphalt Concrete Overlay

Preventative Maintenance Overlay and Bonding Agent for Composite

Pavement Rehab

• Requires a specialized spray-bar paver or hot applied polymer

modified tack

• Tack application rate is .25 +/- (0.03) Gal/sq yd

• Delivery temperature is 315oF +/- 15oF measured in the paver hopper

• Base Temperature 50oF or higher

• Accepted based on Visual Inspection

• Rejection requires remove and replace

• No Price Adjustments

• New for 2017 PG Binder has been corrected to PG 64V-28

• One year warranty against raveling and delamination

• By Special provisions – Not in Standard Specification at this time

THMACO

4

Page 5: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

THMACO

Laydown and Paver

5

Page 6: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

THMACO

Laydown and Paver

6

Page 7: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

THMACO

Laydown and Paver

7

Page 8: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

THMACO: Proper mat with proper overspray

8

Page 9: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Potential Issues

THMACO

9

Page 10: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Bleed off:High tack

application and

overspray can

bleed with heavy

rains following

laydown

10

Page 11: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Delamination:

Delamination can

occur with stuck

nozzles on paver

Patching or milling

may be appropriate

11

Page 12: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Raveling and Segregation

Delivery Temperature is critical

Raveling and segregation will occur

12

Page 13: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Reflective crack and spall, with 2

weeks of traffic

13

Pavement cracks or joints

¼ inch or more in width

shall be cleaned and

filled with a sealant

material conforming to

the Special Provision

For Sealing Cracks in

Asphalt Concrete

Pavements or

Hydraulic Cement

Concrete Pavement.

Quantities and

payment will be

according to the

Special Provision For

Sealing Cracks in

Asphalt Concrete

Pavements or

Hydraulic Cement

Concrete Pavement.

Page 14: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Generically known as Chip Seals

VDOT Surface Treatments

14

Page 15: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Seal Treatment:

One Application of liquid asphalt and one application of

cover aggregate

Modified Single Seal:

Two applications of liquid asphalt one application of

cover and one application of blot fine aggregate

Modified Double Seal:

Three applications of liquid asphalt, two applications of

cover and one application of blot fine aggregate

VDOT Surface Treatments

15

Page 16: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Surface Treatments

16

• Appropriate uniformity

• No streaks

• Appropriate amount of cover

loss with traffic

Page 17: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Proper Surface Texture After

Traffic

17

Page 18: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Potential Issues

Surface Treatment

18

Page 19: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

19

Delamination:

• Surface

preparation

• Emulsion

Application

Rate

• Ensure

aggregate

compatibility

Page 20: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Streaking

20

Emulsion application rate

Calibrate the Distributor

Calibrate the chip

spreader

Ensure aggregate

compatibility

Page 21: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Distributor

Calibration

21

Emulsion application rate

Spray bar height

Speed

Required by specification

to be performed in front

of the Engineer per

project

Page 22: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

22

Once height is

established, verify

the application rate

with plate test

Required by

specification to be

performed in front

of the Engineer per

project

Distributor

Calibration

Page 23: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Surface

Treatments

23

Bond breakers

Page 24: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Slurry Seals and Micro Surfacing

24

Page 25: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Slurry Seals and Micro Surfacing

25

Page 26: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

• Mixture of emulsified asphalt and fine aggregate

• Placed in thin lifts to protect and seal current riding

surface

• Micro Surfacing is a slurry seal using Latex Modified

emulsions and additional lab design requirements

Slurry Seals and Micro Surfacing

26

Page 27: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Placed in thin lifts to protect and seal current

riding surface

27

Page 28: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Slurry Seals and Micro Surfacing

28

Delamination:

Poor surface

preparation

Gradation and AC

content too tight

Page 29: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Surface Preparation and / or Gradation

Control

29

Page 30: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Combination of a Surface Treatment and Slurry Seal

• Surface treatment is placed first

• Allowed to cure for at two weeks by specification

• Surface cleaned and Slurry applied

Cape Seals

30

Page 31: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Combination of a Surface

Treatment and Slurry

Seal

Suburban Secondary in

Chesterfield County,

VA

Completed Summer of

2016

Current Condition:

February 2017

Cape Seals

31

Page 32: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Suburban Secondary in Chesterfield County, VA

Completed Summer of 2016

Current Condition: February 2017

Cape Seals

32

Page 33: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Suburban Secondary in Chesterfield County, VA

Completed Summer of 2016

Current Condition: February 2017

Cape Seals

33

Page 34: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

SM-4.75

Preventative

Maintenance Overlay

34

Page 35: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Finer Superpave Mix placed at .75 to 1.25 inches

• Used with A, D and E mixes

• Minimum of three breakdown passes

• Density based on roller pattern and control strip,

however CS cores are not taken

• Material temperatures are critical, best practices

are to work hot to warm in the field

• May be rejected based on visual inspection

• Platform is critical

SM-4.75

35

Page 36: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

New for 2017 – SP Dated July 22, 2016

Last Paragraph of Section VII:

The minimum laydown temperatures:

• for SM-4.75A and SM-4.75D shall not be less than 270°F.

• For SM-4.75E, the minimum laydown temperature shall not be less than

290°F.

VIII. Weather Restrictions

SM-4.75 mixture shall be placed only when the ambient and surface

temperature are 50 degree F or above. The Contractor shall employ a

Material Transfer Vehicle (MTV) during the placement of SM-4.75

mixtures for the ambient and/or surface temperature between 50-60

degree F.

36

Page 37: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Smooth uniform

surface that

protects the

underlying

pavement

37

Page 38: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

SM-4.75

38

Platform is critical:

Curb and gutter

sections need full

width milling

Page 39: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Edge Milling, can lead to

issues…

39

Curb and gutter sections need

full width milling

Page 40: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

Edge Milling,

can lead to

issues…

40

Page 41: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

SM-4.75

41

It is much better to

plane the entire

platform….

Page 42: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

42

Patch out weak spots

Page 43: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

43

Patch out weak spots

Page 44: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

SM-4.75

44

Watch out for over-

runs

Get a feel for

quantities

Page 45: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion

45

Page 46: TECHNIQUES & EXPECTATIONS · 2019-12-31 · TECHNIQUES & EXPECTATIONS 1 2017 Asphalt Regional Seminars Todd Rorrer Regional Field Engineer ... Distributor Calibration 21 Emulsion