1
ASBU ACTIONS UNDERTAKEN BY
THE ALGERIAN CIVIL AVIATION
AUTHORITY IN AIR NAVIGATION FIELD
اجلمهوریة اجلزائریة الدمیقراطیة الشعبیة RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE
وزارة االشغال العمومیة و النــقـلMINISTÈRE DES TRAVAUX PUBLICS ET DES TRANSPORTS
05 septembre 2016
Introduction
In order to implement the Aviation System Block Upgrade (ASBU), the Algerian Civil Aviation Authority has set up a working group in February 2013 to develop a road map.
The working group was made up of all aviation stakeholders (aviation authority, airspace users, ANSP, meteorological service and airports operators)
The working group finalized the road map on September 2013
Response to the ICAO questionnaire related to ASBU block 0 implementation was sent on Mars 2015 .
3
4
Split the current FIR into 02 FIR (North and South)
New ATC systems implementation (North and South)
Total surveillance coverage of the Algerian Airspace (Mode S, ADS-B)
VHF coverage Improvement
Scheduled to be finalized in 2019
The Air Space Management Development Plan
(PDGEA) consists of :
6
11 Mode S SSR radar stations + 05 current MSSR
04 PSR radar + 01 current PSR
13 ADS-B stations
Surveillance coverage (B0-84)
Safety nets (B0-102)
Since 2004, the current system is compliant to this
block.
The futur system will also be compliant :
- STCA (Short Term Conflict Alert)
- APW (Area Proximity Warning)
- MSAW (Minimum Safe Altitude Warning)
- APDA (Approach Path Deviation Alert) (B1-102)
8
Enroute Data-link Application (B0-40)
The current system is compliant by means of:
ADS-C since 2008 (CLAM, RAM, DAIW)
CPDLC since 2011
The futur system will be compliant
9
Sequencement
(AMAN - DMAN) (B0-15)
The futur system will integrate the Departure/Arrival
sequencing functionnality for Airports with approch
control services (Algiers, Oran, Constantine, Annaba,
Hassi Messaoud)
10
What we need ?
1- Well trained ATFM personnel (FMP Personnel)
2- Systems for: traffic prevision, data exchange…
3- calculation/estimation of Airports & Sectors capacities
Full ATFM Implementation (B0-35)
11
What we have done so far
1- ATFM personnel training (FMP Personnel)
- 36 experimented ATCO have already undergone FMP
modules 1 and 2 (provided by EUROCONTROL), those
ATC are going to be the FMP personnel for Algiers FIR.
- Those 36 experimented ATCO will attend the FMP
Module 3 at EUROCONTROL premises (practical training
course) by 2019.
12
What we have done so far
2- Systems for: traffic prevision, data exchange…
- One of the solution to acquire an ATFM system is :
Be part of EUROCONTROL ATFM and IFPS area
- Negotiation process to join EUROCONTROL ATFM and
IFPS Area is ongoing.
13
What we have done so far
3- Calculation/Estimation of Airports & Sectors capacities
-Assistance from ICAO or EUROCONTROL for
capacity calculation is needed.
14
Current ATFM operation in Algiers FIR
-we are an adjacent FIR to Eurocontrol area of responsibility
IFPZ
DAAA
15
Current ATFM operation in Algiers FIR
-We take care that all departing flights from our FIR to the IFPZ
respect the ATFCM measures implemented by EUROCONTROL (to
protect the sectors and airports within the IFPZ)
-we can regulate our international airports when needed by using
EUROCONTROL systems (only international flights could be regulated)
-we can regulate all our waypoints connecting our FIR to the IFPZ by
using EUROCONTROL systems (only international flights could be
regulated)
As an adjacent FIR to EUROCONTROL Area of responsibility:
16
Validation of Algeria PBN
Implementation Plan
(end 2015).
ENNA Road Map for PBN
implementation (achieved
early 2016).
Performance Based Navigation
Implementation (PBN) B065 ?
18
PBN Implementation
• Road Map steps are :
A. Planification : March 2016 - August 2017.
B. Scenari Design : April 2017 - October 2019.
C. Validation : November 2017 - February 2021.
D. Implementation : June 2018 - July 2020.
19
Algeria was supported in the framework of
EUROMED GNSSII/MEDUSA Project for training
and design of GNSS procedures (2015).
Two RNP APCH procedures were designed for
Bejaia Airport (RWY 26 and RWY 08).
Two RIMS stations are planned to be implemented
within Algiers FIR.
PBN Implementation
20
Service Improvement through Digital
Aeronautical Information Management (B0-30)
ENNA action plan :
AIS to AIM migration 2016-2019
Training planned during the 4th quarter 2016
Upgrade of the system during 2017-2018
Implementation of Quality Management System (QMS)
aspects 2019
21
Blocks Title Target date
B0-25 Increased Interoperability, Efficiency and Capacity though Ground-Ground Integration
2019
B0-102 Increased Effectiveness of Ground-Based Safety Nets 2019
B0-40 Improved Safety and Efficiency through the Initial Application of Data Link En-route
2019
B0-84 Initial Capability for Ground Surveillance 2019
B0-15 Improve Traffic Flow through Sequencing (AMAN/DMAN) 2019
B010 Improved Operations through Enhanced En-route Trajectories 2021
B0-05 Improved Flexibility and Efficiency in Descent Profiles using Continuous Descent Operations (CDOs)
2021
B0-20 Improved Flexibility and Efficiency Departure Profiles – Continuous Climb Operations (CCO)
2021
B0-65 Optimization of Approach Procedures including Vertical Guidance 2021
B0-30 Service Improvement through Digital Aeronautical Information Management 2019
B0-35 Improved Flow Performance through Planning based on a Network-wide view 2018
Conclusion
22