  • 7/31/2019 Abu Sami Final1

    1/15

    May 2005

    NORTHERN AREA HEAVY EQUIPMENT DIVISION

    RTR J24 (CCR) CATALYST LOADINGby

    Awadh Al-Yami

  • 7/31/2019 Abu Sami Final1

    2/15

    OUTLINE

    Objective

    Introduction

    Previous Situation

    Proposal

    Current Situation

    Recommendation

  • 7/31/2019 Abu Sami Final1

    3/15

    OBJECTIVE

    TO SHARE WITH YOU AND EXPLAIN THE JOB ACCOMPLISHED IN

    RTR J24 (CCR) TO LOAD AND OFFLOAD THE CATALYST BY USING

    SAUDI ARAMCODEMAG CRANE 250TINSTEAD OF THELIEBHEER

    CRANE 400TTHAT RTR USUALLY RENT FROM LOCAL

    CONTRACTOR TO PERFORM THIS JOB.

  • 7/31/2019 Abu Sami Final1

    4/15

  • 7/31/2019 Abu Sami Final1

    5/15

  • 7/31/2019 Abu Sami Final1

    6/15

    RTR J24 (CCR) T&I

    ONE WEEK LATER 400 Ton liebheer Crane Contracted from Razyiat was

    in the Plant Site.

    A question was raised what is the purpose for this

    huge crane.

  • 7/31/2019 Abu Sami Final1

    7/15

    RTR J24 (CCR) T&I

    The question was answered to me by the T&I Director,saying the crane is rented to load and offload the PlantCatalyst.

    How Aramco rented a crane to do such job whichcould be performed by one of the high technologyowned crane in safest, cost, and time effectivemanner.

    ?

  • 7/31/2019 Abu Sami Final1

    8/15

    RTR J24 (CCR) T&I

    INFORMATION BY REFINERYPERSONNEL

    Plant Height = 90 m

    400 Ton liebheer Crane

    Required Load=1.2T

  • 7/31/2019 Abu Sami Final1

    9/15

    RTR J24 (CCR) T&I

    DURING TWO DAYS

    INPUT FROM RTR REFINERY

    MY FINDING Using DEMAG 250

    Ton Load Chart

    RADIUS = 32 METER

    BOOM LENGTH = 97.6 METER

    CRANE CAPACITY = 3.4 TON

  • 7/31/2019 Abu Sami Final1

    10/15

    RTR J24 (CCR) T&I

    At that Time:

    Job was done within 5 days

    by the contracted cranedue to earlier agreementwith RTR

  • 7/31/2019 Abu Sami Final1

    11/15

    ONE MONTH LATER AFTER THE T&I

    Plant J24 had a malfunctionsand R&HED was consulted todo this Job as the proposed liftwas approved by the Refinery

    Personnel and CraneOperation Foremen.

  • 7/31/2019 Abu Sami Final1

    12/15

    RTR J24 (CCR) T&I

  • 7/31/2019 Abu Sami Final1

    13/15

    SAUDI

    ARAMCO

    RAZYIAT

    CONTRACTORCRANE TYPE DEMAGE LIEBHERR

    CRANE CAPACITY 250 ton 400 ton

    PLANT HEIGHT 90 meter 90 meter

    BOOM LENGTH 97.9 meter Not specify

    RADIUS 32 meter 32 meter

    ATTACHMENTS Folding jib Luffing jib

    COUNTER WEIGHT 31 Ton 100 Ton

    ASSEMBLY DURATION 1 Day 4 DaysJOB DURATION 3 days 5 days

    TOTAL CHARGE $16,000 $120,000

    COST SAVING $104,000 $0

  • 7/31/2019 Abu Sami Final1

    14/15

    Use full-frame

    images to

    maximizeimpact

  • 7/31/2019 Abu Sami Final1

    15/15

    Thank you