Demandes dActionsCorrectives
Rapport NAC/HMA/TSA/001
Pilot par: Date daudit: Lieu dAudit:
Rochdi BAHIRI 21/09/12 SITE DE HAOUMA
Fournisseur (Audit)
SIEMENS
PERSONNES PRESENTES :
Rochdi BAHIRI (Responsable QSE projets EEM)
Nasr Eddine BELGHAZI (Directeur Projet EEM)Amine BENNANI (Responsable QSE CEGELEC
Adnane Malki (Ingnieur Travaux CEGELEC/Representant HSE provisoire)
Stig (Site Manager Siemens)
Alessandro LOGOTETA (Project Manager SIEMENS)
Points auditer (Selon le programme Ref.HMA/GC/GE/TSA/001)
Vendredi 21/09/12 :
9:00 Runion douverture (situation et avancement)9:30 Visite sur Site
10:30 Runion de travail- Discussion du PAQ- Plan de contrle Qualit- Documents & Procdures dexecution(Method statement)- Organisation HSE- Gestion des risques lis aux activits de montage. (Risk assessment)- Comit HSE (Responsables SGTM, CEGELEC & SIEMENS pour la gestion des
interfaces et mise au point des permis de travail pour les travauxchevauchs)
12 :00 Clture de la runion et signature du PV.
7/22/2019 Car Siemens 210912
2/2
Page: 2/2
COMPTE RENDU :
PAQ & PHSE :
- SIEMENS had present their PAQ & PHSE/- SIEMENS made a HSE induction on this day (21/09) with participation of SGTM &
CEGELEC.
Material receiving:
- SIEMENS will have material receiving reports to share with EEM,- If there is a repair on blade, NCR wil l be raised and SIEMENS will share the NCR
report with client with corrective action taken and situation before and after.
Chemicals & Dangerous products:
- A closed area is designed to keep all products used by Siemens with limitedaccess to their staff.
Lifting Equipments:
- SIEMENS will complete the method statement given as hard copy, by list of liftingequipments and certificates (crane conductor and operator training, slingscertificates,etc)
Transportation Interface:
- The transport can present risk to block other trucks when transporting SIEMENSequipments.
Medical conditions:
- SIEMENS have an arrangement with Clinique de DETROIT in Tanger-
Coordination will be done with SWP sub-contractors to have the same Clinique- Ambulance will be on site next week (W39).
Daily Briefings:
- SGTM, CEGELEC & SIEMENS will have a daily briefing at 16h00 for the activitiesplanned for D+1.
Signs:
- Signalisation on site will be installed in French & English.Risk assessments :
- SIEMENS present a folder (hard copy)- SIEMENS will prepare a list of the activities that present a interface work between
them and CEGELEC and will share it with EEM for dispatching.
Cadencement : 2,5 Turbine/week.
SIEMENS : CEGELEC : SGTM : LAHMEYER : Maitre douvrage: