    Demandes dActionsCorrectives

    Rapport NAC/HMA/TSA/001

    Pilot par: Date daudit: Lieu dAudit:

    Rochdi BAHIRI 21/09/12 SITE DE HAOUMA

    Fournisseur (Audit)

    SIEMENS

    PERSONNES PRESENTES :

    Rochdi BAHIRI (Responsable QSE projets EEM)

    Nasr Eddine BELGHAZI (Directeur Projet EEM)Amine BENNANI (Responsable QSE CEGELEC

    Adnane Malki (Ingnieur Travaux CEGELEC/Representant HSE provisoire)

    Stig (Site Manager Siemens)

    Alessandro LOGOTETA (Project Manager SIEMENS)

    Points auditer (Selon le programme Ref.HMA/GC/GE/TSA/001)

    Vendredi 21/09/12 :

    9:00 Runion douverture (situation et avancement)9:30 Visite sur Site

    10:30 Runion de travail- Discussion du PAQ- Plan de contrle Qualit- Documents & Procdures dexecution(Method statement)- Organisation HSE- Gestion des risques lis aux activits de montage. (Risk assessment)- Comit HSE (Responsables SGTM, CEGELEC & SIEMENS pour la gestion des

    interfaces et mise au point des permis de travail pour les travauxchevauchs)

    12 :00 Clture de la runion et signature du PV.

  • 7/22/2019 Car Siemens 210912

    2/2

    Page: 2/2

    COMPTE RENDU :

    PAQ & PHSE :

    - SIEMENS had present their PAQ & PHSE/- SIEMENS made a HSE induction on this day (21/09) with participation of SGTM &

    CEGELEC.

    Material receiving:

    - SIEMENS will have material receiving reports to share with EEM,- If there is a repair on blade, NCR wil l be raised and SIEMENS will share the NCR

    report with client with corrective action taken and situation before and after.

    Chemicals & Dangerous products:

    - A closed area is designed to keep all products used by Siemens with limitedaccess to their staff.

    Lifting Equipments:

    - SIEMENS will complete the method statement given as hard copy, by list of liftingequipments and certificates (crane conductor and operator training, slingscertificates,etc)

    Transportation Interface:

    - The transport can present risk to block other trucks when transporting SIEMENSequipments.

    Medical conditions:

    - SIEMENS have an arrangement with Clinique de DETROIT in Tanger-

    Coordination will be done with SWP sub-contractors to have the same Clinique- Ambulance will be on site next week (W39).

    Daily Briefings:

    - SGTM, CEGELEC & SIEMENS will have a daily briefing at 16h00 for the activitiesplanned for D+1.

    Signs:

    - Signalisation on site will be installed in French & English.Risk assessments :

    - SIEMENS present a folder (hard copy)- SIEMENS will prepare a list of the activities that present a interface work between

    them and CEGELEC and will share it with EEM for dispatching.

    Cadencement : 2,5 Turbine/week.

    SIEMENS : CEGELEC : SGTM : LAHMEYER : Maitre douvrage: