IMAGES (FROM TOP TO BOTTOM) Commencement of bridge launch Nose deflection jack engaging at permanent pier Launch 1 approaching completion PROJECT Construction of Bridge 3528A, Coolup East Road over Murray River CLIENT BMD Constructions FORTEC CONTACT 08 6206 6999 DESCRIPTION The existing bridge structure, the deck and substructure of Bridge 3528A has deteriorated significantly and whilst the superstructure can be upgraded and deck replaced; no strengething and/or maintenance work can extend the design life of the substructure to 100 years that the superstructure would be designed for. MRWA decided to replace the bridge with a new two-span bridge which was constructed at the existing bridge location and launched from the West abutment. Fortec was engaged by BMD Constructions to perform the launching works including supply of launching bearings. The scope includes: Design of site specific launching services including temporary works Technical advice on bridge launching Supply & design of launching equipment including rocker type launch bearings and sliding pads, launching jacks and pulling cables and nose deflection jacks Supply of on-site launching services including launching technicians and engineering support Jacking system for change out of temporary launch bearings for permanent bearings HIGHLIGHTS Design successfully allowed for anticipated nose deflection of 450mm Designed and supplied bespoke rocker type launch bearings to cater for high angular rotation of 0.018 radians CONSTRUCTION OF BRIDGE 3528A BRIDGE LAUNCHING PEEL REGION, WA

CONSTRUCTION OF BRIDGE 3528A · 2019. 11. 29. · Commencement of bridge launch Nose deflection jack engaging at permanent pier Launch 1 approaching completion PROJECT Construction

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTION OF BRIDGE 3528A · 2019. 11. 29. · Commencement of bridge launch Nose deflection jack engaging at permanent pier Launch 1 approaching completion PROJECT Construction

IMAGES (FROM TOP TO BOTTOM)

� Commencement of bridge launch � Nose deflection jack engaging at permanent pier

� Launch 1 approaching completion

PROJECTConstruction of Bridge 3528A, Coolup East Road over Murray River

CLIENTBMD Constructions

FORTEC CONTACT 08 6206 6999

DESCRIPTION The existing bridge structure, the deck and substructure of Bridge 3528A has deteriorated significantly and whilst the superstructure can be upgraded and deck replaced; no strengething and/or maintenance work can extend the design life of the substructure to 100 years that the superstructure would be designed for.

MRWA decided to replace the bridge with a new two-span bridge which was constructed at the existing bridge location and launched from the West abutment.

Fortec was engaged by BMD Constructions to perform the launching works including supply of launching bearings.

The scope includes:

� Design of site specific launching services including temporary works

� Technical advice on bridge launching � Supply & design of launching equipment including rocker type launch bearings and sliding pads, launching jacks and pulling cables and nose deflection jacks

� Supply of on-site launching services including launching technicians and engineering support

� Jacking system for change out of temporary launch bearings for permanent bearings

HIGHLIGHTS � Design successfully allowed for anticipated nose deflection of 450mm

� Designed and supplied bespoke rocker type launch bearings to cater for high angular rotation of 0.018 radians

CONSTRUCTION OF BRIDGE 3528A

BRIDGE LAUNCHINGPEEL REGION, WA