FFAACCTTUUAALL RREEPPOORRTT
CCOONNSSTTRRUUCCTTIIOONN OOFF AANNCCHHOORRSS FFOORR WWIINNDD TTUURRBBIINNEESS
AATT GGRREENNAADDEE,, RROODDRRIIGGUUEESS
PPHHAASSEE 22
Prepared for AJ Maurel Construction Ltée
Prepared by Water Research Co Limited
September 2010
OPG 0083 COL
Report on Anchors at Grenade Page 1 of 23
Revision Description Issued by Date
0 Issued for comments NC / ES 22nd September 2010
Produced Nazila Choolun
Signature
Date 22nd September 2010
Checked Emilio Saldivar
Signature
Date 22nd September 2010
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 2 of 21
1 Introduction 3
1.1 Aims and Scope of the Report 3
1.2 Description of the Project and Site 3
1.3 Subsoil Conditions 4
2 Anchor works 5
2.1 General Description of Anchor Works 5
2.2 Health and Safety 6
2.3 Anchor Boring 6
2.4 Reinforcement and Grouting 11
2.5 Test Anchors 16
3 Closing remarks 17
4 References 18
5 Figures 19
Appendix A Layout of site and Location of Anchors
Appendix B Photographs of site works
Appendix C Photographs of Cuttings
Wind Turbine No. 3
Wind Turbine No. 3
Appendix D Anchor Records
Test Anchors
Wind Turbine No. 3
Wind Turbine No. 4
Contents
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 3 of 21
1 Introduction
1.1 Aims and Scope of the Report
In April 2010, Water Research Co Limited (Water Research) was appointed as subcontractor by AJ Maurel
Construction (Contractor) to carry out drilling and grouting of anchors for 2No. additional wind turbines at
Grenade, Rodrigues. Water Research’s scope of works comprised:
• Drilling and grouting of working and test anchors
• Control of the nature of the raised materials from the drilling
• Reporting on works
This Report presents the description of the work, including:
• General information for the site
• Factual description of fieldworks
• Records of raised materials, anchor drilling and grouting
1.2 Description of the Project and Site
The project comprised the construction of civil works for the installation of 2No. additional Wind Turbines, W3
and W4, in Rodrigues (Phase 2). Phase 1 of the Works was carried out in April/May 2009 and comprised of the
Construction of 2No. Wind Turbines (W1 and W2), an LV room and access roads within the windmill farm (Ref.
4).
The main contract was awarded to AJ Maurel Construction Ltee, who awarded the construction of the
restraining anchors for the wind turbines to Water Research. The wind turbines and associated equipment were
supplied by Vergnet S.A. The main elements of the wind turbines are a 55m tall tubular tower (mat) and 32m
diameter blades. The weight of the tower is 13.5tons and that of the nacelle (including all generative
components and the rotor) is 8.4tons.
The site is located on the north east coast of Rodrigues, at Grenade (Figures 1.1 to 1.3) on ground with an
average slope of 5% and elevations varying between 70m and 113m above mean sea level (amsl). The site is
covered by grass, cobbles and boulders and occasional trees and is bounded to the West by Montagne
Grenade and a valley, to the East by the un-developed land and Montagne au Sel, to the south by 2No. existing
Wind Turbines and the road to Pointe Coton and to the north by the sea. Access roads and power generating
facilities were built during Phase 1 of the works in April 2009.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 4 of 21
1.3 Subsoil Conditions
The published geology of the site indicates the presence of ancient formations of tholeitic basalt (silica
oversaturated basalt) and olivine basalt (Ref. 1).
The site subsoil profile identified during the earlier geotechnical investigation consists of Topsoil (encountered
as soft dark brown gravely high plasticity clay), overlying Residual Soil and Completely Weathered Basalt (both
encountered as high plasticity clay of varying strength and reaching at least 7m in BH2 and BH4) and layers of
basalt rock of various grades of weathering as from 1.20m depth (BH2) and reaching up to the maximum drilled
depth of 15.0m. Highly to Moderately Weathered basalt was generally described as moderately strong to
moderately weak grey fine grained closely jointed vesicular basalt with rare amygdales. Depth at which this
stratum is encountered varies between 1.23m and 10.47m with thicknesses varying between 0.82m and 3.1m.
Moderately to Slightly Weathered basalt is generally described as moderately strong to strong grey fine grained
slightly vesicular basalt with rare amygdales. Depth at which this stratum is encountered varies between 1.20m
and 5.46m with thicknesses varying between 0.4m and 3.1m. In general the encountered rock is classified as of
weak to strong strength and poor to fair quality (Ref. 1).
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 5 of 21
2 Anchor works
2.1 General Description of Anchor Works
Anchorage works on site began on the 18th May 2010 and were completed on 7th June 2010. The Works
comprised the construction of 20No. working anchors and 1No. test anchor. The details of the anchors as given
in the Tender Document are reproduced in Table 2.1; the locations of the anchors are shown in Appendix A.
The photographs of the site works are shown in Appendix B.
Table 2.1 Summary of Anchor Details as per Tender Document
Name as per Tender (CEB)
Name as per Geotechnical Report
Name as per Tender (Vergnet)
No. of Anchors per wind turbine
Ø GEWI bar
Load Length for drilling
Angle of the
anchor
Right tower base slab
Base Anchors Ancrage d'embase (Ed
& Eg)
1No. @ 45° 40 mm 180 6m 45°
Left tower base slab
1No. @ 45° 40 mm 180 6m 45°
Holding side Retaining Anchor Ancrage de retenue (R)
1 No. @ 26° 63 mm 300 8m 26°
Right lateral side Lateral Anchors Ancrages latéraux (Ld
and Lg)
1 No. @ 26° 63 mm 300 8m 26°
Left lateral side 1 No. @ 26° 63 mm 300 8m 26°
Vertical lifting side M1
Manoeuvre Anchors
Ancrage de Manoeuvre
(M,Md & Mg)
1 No. vertical 63 mm 300 8m 0° (vertical)
Right tilted lifting side M2r
1 No. @ 40° 40 mm 350 7,9m 40°
Left tilted lifting side M2l
1 No. @ 40° 40 mm 350 7,9m 40°
Right anticyclonic support
Tower Anchors Ancrage securisation
cyclonique du mat (Bd)
1 No. @ 45° 25 mm 220 6m 45°
Left anticyclonic support
Ancrage securisation
cyclonique du mat (Bg)
1 No. @ 45° 25 mm 220 6m 45°
The drawings produced by Vergnet SA for the anchors were PL99072 MOE, DV911-8976BOR01and DV911-
8976BOR02.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 6 of 21
2.2 Health and Safety
Health and safety management was strictly implemented on site. Use of Personal Protective Equipment (PPE)
such as safety helmets, safety footwear and high visibility clothing/jackets was implemented on site.
Housekeeping on site was maintained to the highest standard possible at all times. No major accidents
involving injury to personnel or damage to structures occurred. Progress meetings were held on site once a
week during the Works.
2.3 Anchor Boring
Prior to drilling, the positions of all anchors were checked by Water Research and the Main Contractor with
respect to reference points fixed on site by the latter and Vergnet SA. The Anchors were drilled in 200mm
diameter using a Rockgiant rig following down the hole hammer (DTH) technique (See Figure 2.1) as best
suitable under prevailing conditions; no steel casing was required on the upper section of the borehole. As per
Vegnet SA’s drawing PL99072MOE, the tolerance on the boring angles were ±3°. The angles of the anchors
were within this tolerance.
Figure 2.1 – Drilling Rig and DTH hammer
Records, including all details of the strata encountered, drilled lengths and grouting quantities, were set up for
each of the anchors and witnessed by the Main Contractor and the Client (CEB). The average boring times for
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 7 of 21
the anchors for each stratum, as requested by Vergnet SA, in the Phase 1 of the Works are also presented in
Table 2.2.
Table 2.2 Summary of boring time as per strata
Strata Boring Time / metre
Max Min Average
Clay with boulders 19min27 45s 3min20
CWB to HWB 4min 1min39 2min44
HWB 3min25 1min 1min39
HWB to MWB 10min37 45s 2min12
MWB 7min09 1min 2min19
MWB to SWB 6min34 1min16 2min54
SWB 19min18 1min10 5min39
Some of the drilled lengths of the anchors were increased to cater for the variations in soil strata encountered
with respect to the design profile. The adjusted lengths of the anchors are presented in Table 2.3.
Table 2.3 Adjusted Drilled Lengths of Anchors
Name of Anchor Wind Turbine No. 3 Wind Turbine No. 4
Drilled Length as
per Tender (m)
Actual Drilled Length (m)
Drilled Length as per Tender
(m)
Actual Drilled Length (m)
Right tower base slab 6.0 9.0 6.0 7.5
Left tower base slab 6.0 9.0 6.0 7.0
Holding side 8.0 9.5 8.0 9.5
Right lateral side 8.0 11.0 8.0 8.5
Left lateral side 8.0 9.0 8.0 9.5
Vertical lifting side M1 8.0 11.0 8.0 9.5
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 8 of 21
Name of Anchor Wind Turbine No. 3 Wind Turbine No. 4
Right tilted lifting side M2r 7.9 11.0 7.9 11.5
Left tilted lifting side M2l 7.9 9.5 7.9 10.3
Right anticyclonic support 6.0 9.5 6.0 7.0
Left anticyclonic support 6.0 9.0 6.0 6.5
Total drilled length (m) 71.8 97.5 71.8 86.8
For the DTH technique, flushing air (compressed air) carries the cuttings from the bottom of the hole to the
surface. When drilling anchors in close proximity (e.g. Manoeuvre and Tower Base Anchors) the previously
drilled holes were covered during the drilling of the adjacent anchors and flushed with air at the end of drilling of
the group. Whenever the anchor hole was grouted on the following day, the hole was flushed again to remove
any spoil that might have fallen in. Following heavy rain on 29th May 2010, the manoeuvre anchors on W4 were
filled with mud. The depth of the mud at the bottom of the anchor hole was measured and since it was thicker
than 1.5m, the drilling hammer was re-introduced into the hole and the mud was removed and the depth of the
hole readjusted to the lengths previously drilled (as shown in Table 2.3 above).
Samples of the cuttings were collected and the material was logged by an engineer as per BS 5930 - Code of
practice for site investigations. Note that the description is based on fragments resulting from the DTH works
and thus it is approximate. The encountered strata are summarised in Tables 2.4 and 2.5 below. Photographs
of the collected samples are presented in Appendix C.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 9 of 21
Table 2.4 Summary of strata encountered Wind Turbine 3
Strata Ld Lg R Bg Bd Ed Eg M1 M2g M2d
Clay with boulders 0.0 – 1.0 0.0 - 3.0 0.0 – 4.0 0.0 – 2.0 0.0 – 2.0 0.0 – 3.0 0.0 – 1.5
2.0 – 2.5 0.0 – 1.0 0.0 – 2.0
CWB to HWB 3.0 – 4.0 6.0 – 7.5 6.0 – 7.0
HWB 4.0 – 6.0 7.0 – 8.0
5.0 – 6.0 8.0 – 9.0 8.0 – 9.0 5.0 – 6.0 7.0 – 8.0
2.0 – 3.0 7.0 – 8.0
3.0 – 3.5 5.0 – 7.0
9.0 – 10.0
HWB to MWB 6.0 – 7.0 8.0 – 11.0 8.0 – 8.5 5.0 – 7.0
8.0 – 9.0 4.0 – 5.0 5.0 – 9.0 2.0 – 4.0 6.0 – 7.0 3.5 – 5.0 3.0 – 5.0 3.5 – 5.0
7.0 – 8.0
MWB 3.0 – 4.0 5.0 – 6.0
3.0 – 5.0 (with clay)
2.0 – 5.0 4.0 – 8.0 (with clay)
3.0 – 6.0 (with clay)
7.0 – 8.0 8.7 – 10.0
6.0 – 7.0
MWB to SWB 1.0 – 3.0 4.0 – 5.0 1.0 – 2.0 8.0 – 8.7
SWB 6.0 – 8.0 8.5 – 9.0
0.0 – 1.0 2.0 – 3.0 7.0 – 8.0
7.5 – 9.5 1.5 – 2.0 (boulder) 2.5 – 3.5
10.0 – 11.0
1.0 – 2.0 (boulder?) 5.0 – 6.0 8.0 – 9.5
2.0 – 3.0 8.0 – 9.0
10.0 – 11.0
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 10 of 21
Table 2.5 Summary of strata encountered Wind Turbine 4
Strata Ld Lg R Bg Bd Ed Eg M1 M2g M2d
Clay with boulders 0.0 – 1.0 0.0 – 2.0 0.0 – 1.0 0.0 – 2.0 0.0 – 3.0 0.0 – 1.0 0.0 – 2.0 0.0 – 2.0 0.0 – 2.0 0.0 – 4.0
CWB to HWB 2.0 – 3.0 2.0 – 3.0 4.0 – 5.0
HWB 6.5 – 7.0 4.0 – 4.5 2.0 – 3.0 6.0 – 7.0 8.0 – 9.5
4.0 – 5.0 5.0 – 6.0 2.0 – 4.0
2.0 – 6.0 5.0 – 7.0 8.0 – 9.0
11.0 – 11.5
HWB to MWB 3.0 – 4.0 9.0 – 9.5 1.0 – 2.0
5.0 – 6.0 6.0 – 6.5 5.0 – 7.5 6.0 – 7.0 4.0 – 6.0
9.0 – 9.5 6.0 – 7.0 9.0 – 10.0
4.0 – 5.0
MWB 7.0 – 8.0 3.0 – 4.0 4.0 – 5.0 3.0 – 4.0 6.0 – 7.0 7.0 – 8.0 7.0 – 8.0 9.0 – 11.0
MWB to SWB 8.0 – 8.5 4.5 – 5.0 7.0 – 8.0 2.0 – 4.0 5.0 – 6.0 3.0 – 4.0
SWB 1.0 – 2.0 (boulder?) 4.0 – 6.5
5.0 – 9.0 3.0 – 4.0 4.0 – 6.0 6.0 – 7.0 1.0 – 3.0 2.0 – 5.0
7.0 – 9.0 8.0 – 9.0
10.0 – 10.3
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 11 of 21
The soil profile identified through the anchor drilling is characterised by the following strata, in order of vertical
sequence: Clay with boulders up to a maximum of 4.0m depth and alternating layers of weathered basalt
reaching to the maximum drilled depths. Shallow bedrock (Moderately to Slightly Weathered Basalts) was
encountered on the Retaining Anchor on Wind Turbine No. 3 and on the anti-cyclonic support Anchors and
Base Anchors on Wind Turbine No. 4 as from as from the surface and reaching up to a depth of 5.0m.
The above profile identified during the drilling is consistent with the design profile determined during the
geotechnical investigation. As mentioned above, the anchor lengths were increased whenever variations to the
design profile were encountered.
2.4 Reinforcement and Grouting
Previous to grouting, the 3m/5m long anchor rods were assembled through the coupling sleeve screw and
spacers were placed every metre, fastened with steel wire along the anchor rod as mentioned in the technical
specifications of the tender document (Figure 2.2). The anchor reinforcement was designed by Vergnet SA.
The typical Anchor reinforcement consisted of GEWI bar in diameters as shown in Table 2.1; as per the product
guide (Ref. 2) of the GEWI High Yield Thread bar.
Figure 2.2-GEWI Reinforcement Bar with spacers at 1m intervals
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 12 of 21
On average, 2No. anchors were drilled and subsequently grouted per day. The three anchors in the manoeuvre
support were drilled and then the anchor eyes were placed at the top of the GEWI bars after which the tool kit
was mounted in the anchor eyes (Figure 2.3). The anchors were grouted after positioning and checking of the
anchors’ alignment and angles.
Figure 2.3 – Preparing the Manoeuvre Anchor for grouting
Grouting proceeded as follows:
All grout surfaces were cleaned of oil, grease and other foreign matter. The colonial mixer (1500
revolutions per minute) did not contain free water.
Full quantity of water was place into the mixer (corresponding ratio to cement weight) and run the
mixer up to full speed.
Cement was slowly poured into the mixer.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 13 of 21
At the end of the mixing, the grout wa injected under gravity from the bottom of the borehole by means
of a tremie pipe. Grouting with the end of the tremie pipe placed at the bottom of the hole enables any
trapped water to come up to the surface and flow out.
Grouting lasted an average of 45min with an average oversupply ratio (grout placed: theoretical volume needed)
varying between 0.8 (undersupply) and 1.5 (oversupply) (Table 2.6) .
Figure 2.4 – Grouting Mixer
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 14 of 21
Table 2.6 Summary of Grouting
Anchor Name Drilled Length
(m)
Ø GEWI bar (mm)
volume of bar (m3)
Volume of hole (m3)
Volume of hole (m3)
Volume Theory (L) Grout details
Volume of grout placed
(m3)
Oversupply (Ratio)
Wind turbine No. 3
Right tower base slab, Ed
9.0 40 0.011 0.442 0.430 430 12 bags 490 1.1
Left tower base slab, Eg
9.0 40 0.011 0.442 0.430 430 12 bags 490 1.1
Holding side, R 9.0 63 0.028 0.442 0.414 414 12 bags 490 1.2
Right lateral side, Ld
11.0 63 0.034 0.540 0.506 506 14 bags 572 1.1
Left lateral side, Lg
9.0 63 0.028 0.442 0.414 414 10 bags 359 0.9
Vertical lifting side M1 11.0 63 0.034 0.540 0.506 506 12 bags 490 1.0
Right tilted lifting side
M2r 11.0 40 0.014 0.540 0.526 526 11 bags 449 0.9
Left tilted lifting side
M2l 9.5 40 0.012 0.466 0.454 454 12 bags 490 1.1
Right anticyclonic support, Bd
9.0 25 0.004 0.442 0.437 437 16 bags +
20litres 674 1.5
Left anticyclonic support, Bg
9.5 25 0.005 0.466 0.462 462 11 bags 449 1.0
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 15 of 21
Anchor Name Drilled Length
(m) Ø GEWI bar
(mm) volume of bar (m3)
Volume of hole (m3)
Volume of hole (m3)
Volume Theory (L) Grout details
Volume of grout placed
(m3) Oversupply
(Ratio)
Wind turbine No. 4
Right tower base slab
7.5 40 0.009 0.236 0.226 226 8 bags 327 1.4
Left tower base slab
7 40 0.009 0.220 0.211 211
6 bags -
20litres (3 litres
used for test
cube)
242 1.1
Holding side 9.5 63 0.030 0.466 0.437 437 12 bags -
20litres 470 1.1
Right lateral side
8.5 63 0.026 0.267 0.241 241 8 bags +
40litres 367 1.5
Left lateral side
9.5 63 0.030 0.298 0.269 269 8 bags +
20litres 347 1.3
Vertical lifting side M1
9.5 63 0.030 0.466 0.437 437 12 bags 490 1.1
Right tilted lifting side
M2r
11.5 40 0.014 0.565 0.550 550 13 bags 531 1.0
Left tilted lifting side
M2l
10.3 40 0.013 0.506 0.493 493 11 bags 449 0.9
Right anticyclonic
support
7 25 0.003 0.344 0.340 340 6 bags +
20litres 265 0.8
Left anticyclonic
support
6.5 25 0.003 0.319 0.316 316 7 bags 286 0.9
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 16 of 21
Like in the construction of Phase 1 (Ref. 4), a 0.5 W/C ratio grout mix was used for the project. Cement on site
was supplied by the Main Contractor. Cubes from grout mixes were taken and handled by the Main Contractor
for compression strength testing.
In accordance with the requirements of the Technical Specifications Water Research provided a daily record of
drilling and grouting operations. This information includes:
1. Location, number, diameter, angle and depth of the anchor holes drilled.
2. Details of grout, volumes of grout injected, quantities of any other material injected and injecting times.
3. Times of sampling and location where samples were taken.
4. Remarks on grouting incidents, delays, surface leaks, interconnections, refusals and any other factors,
which might influence the effectiveness of the grouting.
2.5 Test Anchor
The test anchor was constructed near BH 1 and the Medium Voltage MV control room and the details are as
follows:
Name: Test Anchor No. 1
Ø anchor GEWI Bar (mm): 40
Theoretical Drilled Length (m): 8
Drilled Length (m): 12
Angle of the Anchor: 0° (Vertical)
1No. Test Anchor was drilled in view of carrying out on-site testing (pull out test). The testing will be handled by
the Main Contractor. The summary of the drilling and grouting of the Test Anchor is presented below in Table
2.7.
Table 2.7 Summary Test Anchor No. 1
Clay HWB H/MWB MWB M to SWB
Theoretical Grout Volume
(L)
Actual Grout placed (L)
Oversupply Ratio
0.0-2.0 3.0-4.0 7.0-9.0
2.0-3.0 4.0-5.0 9.0-12.0
5.0-6.0 6.0-7.0 574 594 1.0
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 17 of 21
3 Closing remarks
The Report presents factual information from Anchor Drilling and Grouting Works carried out at Grenade,
Rodrigues from 18th May 2010 to 7th June 2010. The Works comprised the construction of 20No. working
anchors of diameter 200mm. The Works also included the construction of 1No. 200mm diameter Test Anchor
for pull out testing.
The site is located on the north east coast of Rodrigues, at Grenade on ground with an average slope of 5% and
elevations varying between 70m and 113m above mean sea level (amsl). The site is covered by grass, cobbles
and boulders and occasional trees. The site is bounded to the West by Montagne Grenade and a valley, to the
East by the un-developed land and Montagne au Sel, to the south by 2No. existing Wind Turbines and the road
to Pointe Coton and to the north by the sea. Access roads and power generating facilities were already built (as
phase 1 of the Works carried out in April 2009) at the time of the anchor construction works.
The soil profile at the site up to the bored depths is characterised by the following strata, these are in order of
vertical sequence, where present: Clay with boulders up to a maximum of 4.0m depth and alternating layers of
weathered basalt reaching to the maximum drilled depths. Shallow bedrock (Moderately to Slightly Weathered
Basalts) was encountered on the Retaining Anchor on Wind Turbine No. 3 and on the anti-cyclonic support
Anchors and Base Anchors on Wind Turbine No. 4 as from as from the surface and reaching up to a depth of
5.0m.
Some of the drilled lengths of the anchors were increased to cater for the variations in soil strata encountered
with respect to the design profile. The adjusted lengths of the anchors are presented in the Report. The detailed
construction records has been compiled and annexed to the Report. The drilling and concreting were witnessed
by the Client (CEB) and the Main Contractor Colas (Mauritius) and the Anchor Records have been duly signed.
Health and safety was strictly implemented on site. Water Research made use of Personal Protective
Equipment (PPE) such as safety helmets, safety footwear and high visibility clothing/jackets on site.
Housekeeping on site was maintained to the highest standard possible at all times. No major accidents
involving injury to personnel or damage to structures occurred.
We trust that the information contained in this report is satisfactory. Should you have any questions, please do
not hesitate to contact this office.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 18 of 21
4 References
1. Saldivar, E., Choolun, N. (2008), Report on Subsoil Investigation for windmills at Grenade, Rodrigues.
2. Dywidag Systems International, Gewi Threadbar System Brochure,
3. British Standards (1999), BS 5930, Code of practice for site investigations.
4. Saldivar, E., Choolun, N. (2009), Factual Report for Construction of Anchors For Wind Turbines At
Grenade, Rodrigues.
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 19 of 21
5 Figures
Figure 1.1 General location of the site
Site
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 20 of 21
Figure 1.2 Location of the site
SITE
OPG 0083 COL Report on Anchors at Grenade – Phase 2 Page 21 of 21
Figure 1.3 Aerial view of the site