    PROJECT TITTLE: DESIGN OF A CULVERT.

    CASE STUDY: MTONI KIJICHI ROAD(DARAJANI)

    STUDENT NAME: GAD LOI

    ADMISSION NUMBER: 100101P7285.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    2/43

    INTRODUCTION

    Mtoni kijichi road is the paved road which is in

    Temeke Municipal, its 4 km and it is one of the

    main entrance and exit to Kijichi and Mbagara

    kuu. The road face the problem of overflowing

    of water during rainy season at the place called

    Darajani(150metre) which has culvert which is

    not sufficient to convey water during rain seasonhence causes overflowing of water over the

    road.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    3/43

    PROBLEM STATEMENT

    Overflowing of water across the road at

    Darajani(Mtoni Kijichi paved road) during rainy

    season hindering the passage of people and

    traffic.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    4/43

    OBJECTIVE OF THE PROJECT

    To design the box culvert to convey water across

    the road at Darajani(Mtoni Kijichi paved road).

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    5/43

    PROJECT OUT COME

    To come out with the design that when

    implemented will solve the problem which is

    current facing the road for 20 years to come.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    6/43

    METHODOLOGY

    Literature review

    Data collection

    Data analysis Design

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    7/43

    LITERATURE REVIEW

    Culvert is defined as a structure sized to conveysurface water runoff under a highway, railroad, orother embankment.

    Whenever streams have to cross the roadway,

    facility for cross drainage is to be provided. Alsooften the water from the side drain is taken acrossby these cross drain in order to divert the wateraway from the road, to a water course or valley. Thecross drainage structure commonly in use are

    culverts andbridges. When a small steam crosses aroad with a linear waterway less than about 6 meter,the cross drainage structure provided is calledculvert; for higher value of linear waterway the

    structure is called bridge.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    8/43

    The common types of culverts in use are;

    Slab culvert

    Box culvert Arch culvert

    Pipe culvert.

    In slab culverts reinforced concrete slab is placed overabutments made of masonry and the span is generallylimited to 3metre.

    Box culverts of square or rectangular shapes is made ofreinforced concrete.

    Arch culverts is generally built using brick or stone

    masonry, plain cement concrete may also be used.Pipe culverts of minimum diameter 75 cm and made ofsteel or prefabricated reinforced concrete is used whendischarge is low.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    9/43

    Importance of culverts;

    To drain off surface and subsurface water on the

    road To prevent water remain stagnant along the side

    of the road

    To prevent the damages of the road pavement

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    10/43

    Location of the culvert

    Should be located at moderate flow of water

    Should not be placed at bend in water course

    It should be at the straight reach of the watercourse i.e. passing through the opening

    culvert.

    Should be located where there is no possibility

    of silting and scoring during functioning.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    11/43

    Structure detail of a culvert design;

    Barrel area is measured perpendicular to the flowand refers to the water area in the barrel.

    Barrel length is the total culvert length from theentrance to the exit of the culvert. Because the heightof the barrel, barrel slope, and barrel skew influencethe actual length, an approximation of the barrellength is usually necessary to begin the designprocess.

    Barrel roughness is a function of the material used tfabricate the barrel. Typical materials include

    concrete, corrugated metal and plastic. Theroughness is represented by a hydraulic resistancecoefficient such as the Mannings n value.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    12/43

    Barrel slope is the actual slope of the culvert barrel, and isoften the same as the natural stream slope.

    Critical depth is the depth at which the specific energy of a

    given flow rate is at a minimum. For a given discharge andcross section geometry there is only one critical depth.

    Slope there are two classification of slope, steep and mild.

    steep slope occurs where the critical depth is greater

    than the normal depth,mild slope occurs where critical depth is less than

    normal depth.

    Headwater(HW), that depth of the water impounded

    upstream of the culvert due to the influence of the culvertconstriction, friction, and configulation.

    Tailwater(TW), the depth of water a the out let of theculvert.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    13/43

    Part of the box culvert;

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    14/43

    HIGHWAY DRAINAGE

    is the process of removing and controlling excess

    surface and sub-soil water within the right of

    way. It is divided into two;

    i. Surface drainage: the removal and diversion

    of surface water from the roadway and

    adjoining land.

    ii. Sub-surface drainage: the removal of excess

    soil-water from the sub grade

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    15/43

    The design of surface drainage system is divided

    into two parts

    Hydraulic analysis

    Hydrologic analysis

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    16/43

    Hydraulic analysis

    Deal with designing facilities required toaccommodate the estimated discharge

    Mannings formula is used

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    17/43

    V=Allowable velocity of flow in the drain m/sec

    n=Mannings roughness

    r=Hydraulic radius(cross section area of

    flow/wetted perimeter)

    S= longitudinal slope of channelQ=quantity of surface water m3/sec

    A=cross sectional area of channel m2

    v= average velocity m/sec

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    18/43

    Hydrological analysis

    is used to determine the maximum quantity ofwater expected to reach the element of drainagesystem.

    Q=C.i.Ad

    WhereQ=run-off (m3/sec )C=run-off coefficient, expressed as the ratio

    of run-off to rate of rain fall,

    i=intensity of rainfall (mm/sec)Ad=drainage area in 1000m

    2

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    19/43

    Design consideration;

    There are two procedures for designing culverts:

    (1) the manual use of inlet and outlet controlnomographs and

    (2) the use of computer system such as HY8

    Culvert Analysis Microcomputer Program.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    20/43

    The use of nomographs requires a trial and error

    solution and Inlet and Outlet Control,

    Inlet Control If the culvert is operating on a steepslope it is likely that the entrance geometry will

    control the headwater and the culvert will be on

    inlet control.Outlet Control If the culvert is operating on a

    mild slope, the outlet characteristics will probably

    control the flow and the culvert will be on outletcontrol. (Drainage manual 2000)

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    21/43

    HW=H+ho-LS,

    ho=1/2(critical depth+D),

    Q=AV,List design data:

    Q = discharge

    L = culvert lengthS = culvert slope

    TW = tailwater depth

    V = velocity for trial diameter

    Ke= inlet loss coefficientD= diameter

    HW=headwater

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    22/43

    Type of structure Design of entrance Coefficient

    value ke

    Box, reinforced

    concrete

    Wingwalls parallel(extension of side),square

    edged at crown 0.7

    Wingwalls at 10 to 25 degree to barrel, square

    at crown

    0.5

    Headwall parallel to embankment(no wingwalls)

    Square edged on 3 edgesRounded on 3 edges to radius of 1/12 barrel

    diamension

    Beveled edges on 3 sides

    0.5

    0.2

    0.2

    Wingwalls at 30 to 75 degree to barrel

    Crown edge rounded to radiounof 1/12mbarreldimension

    Beveled top edge

    Square edge crown

    0.2

    0.2

    0.4

    Side or slope tapered inlet 0.2

    Entrance loss coefficient, ke for outlet control, full or partly full

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    23/43

    Run-off Coefficient

    Type of the surface Value of run-off coefficient

    1 Bituminous and cement concrete pavement 0.8-0.9

    2 Gravel and WBM pavement 0.35-0.70

    3 Impervious soil 0.4-0.65

    4 Soil covered with turf 0.3-0.55

    5 Pervious soil 0.05-0.3

    The value of run-off coefficient C depends mainly on the type of surface and its slope as

    show in the table below;

    When the drainage area Ad consists of several types of surfaces with run-off coefficientsc1, c2, c3, with their respective areas A1, A2, A3, the weighted value of run-off

    coefficient C is determined from;

    C=(A1C1A2C2A3C3..)/(A1A2A3.)

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    24/43

    Allowable velocity {v}

    Material of the drainage Maximum limiting velocity

    Cast iron pipe 3.5-4.5 m/s

    Earthen channel 0.6-1.2m/s

    Brick sewer pipe 1.5-2.5m/s

    Stone ware sewer pipe 3.0-4.5m/s

    Concrete sewer pipe 2.0-3.0m/s

    The velocity of unlined channel must be high enough to prevent silting and it should notbe too high as to cause erosion. The allowable velocity of flow depends on the soil type

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    25/43

    Mannings roughness coefficient value n-

    Type of culvert Roughness or corrugated Mannings value

    Concrete culvert Smooth 0.010-0.011

    Concrete box Smooth 0.012-0.015

    Spiral rip metal pipe Smooth 0.012-0.013

    Corrugated polyethylene smooth 0.009-0.015

    Corrugated polyethylene Corrugated 0.018-0.025

    Polyvinyl chloride PVC Smooth 0.009-0.011

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    26/43

    Data collection

    The following data are required; Leveling data

    Rainfall data

    Catchment area

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    27/43

    LEVELING DATALevelling

    is the process of measuring the difference in elevationbetween two or more points.

    Levelling work is carried out side by side to give thecenterline profile and typical cross section. The equipmentused in leveling works are leveling staff, Dum level,wooden pags,measuring tape.

    The leveling work was taken along the whole roadsegment 150m. It was commenced from the TBM locatedat small topplate of a pipe culvert along the road. The

    readings were taken at interval of 20m at the centre lineof the road and on right and left hand side of the existingroad. The rise and fall method was used to compute thereduced level which is used to draw the longitudinalprofile of road.

    LEVELING DATA

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    28/43

    LEVELING DATACHAINAGE BS IS FS RISE FALL RL REMARKS

    TBM 1.485 100

    0+000 1.720 0.235 99.765 RIGHT

    1.740 0.020 99.745 CENTRE

    1.700 0.040 99.785 LEFT

    0+020 1.820 0.120 99.665 RIGHT

    1.760 0.060 99.725 CENTRE

    1.800 0.040 99.685 LEFT

    0+040 1.610 0.190 99.875 RIGHT

    1.700 0.090 99.785 CENTRE

    1.820 0.120 99.665 LEFT

    0+060 1.750 0.065 99.730 RIGHT

    1.770 0.020 99.710 CENTRE

    1.780 0.010 99.700 LEFT

    0+080 1.501 0.28 99.980 RIGHT

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    29/43

    CHAINAGE BS IS FS RISE FALL RL REMARKS

    2.420 1.530 0.030 99.950 CENTRE

    1.601 0.820 100.770 LEFT

    0+100 2.170 0.570 100.200 RIGHT

    2.100 0.070 100.270 CENTRE

    2.089 0.011 100.281 LEFT

    0+120 1.380 0.709 100.990 RIGHT

    1.540 0.140 100.850 CENTRE

    1.600 0.060 100.790 LEFT

    0+140 1.010 0.590 100.380 RIGHT

    0.390 0.620 102.000 CENTRE

    0.210 0.810 102.810 LEFT

    0+160 1.540 1.330 101.480 RIGHT

    1.890 0.350 101.130 CENTRE

    1.960 0.070 101.060 LEFT

    Longitudinal profile

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    30/43

    000 0+020 0+040 0+060 0+080 0+100 0+120 0+140

    Longitudinal profileFigure; Longitudinal profile

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    31/43

    Rain fall intensity i, dataRain fall intensity

    The design value of the rain fall intensity (i) is to be determined for the expected

    duration of storm water to flow the remotest point in drainage area to the drain inletwhich is estimated using the Time flow inlet chart. The time for water to flow throughthe drain between inlet and outlet points is determined based on the allowable velocityof flow in the drain, generally ranging from 0.3-1.5m/sec, depending on the soil type.The time of concentration or the duration of storm for design may be taken as the suminlet time and time of flow through the drain. The frequency of occurrence of the stormor the return period may taken as 5; 10; 25; or 50 years.

    Consider the following equation for the determination of the rain fall intensity;T2= L/V (in sec)

    T= T1+T2T = time of concentration or design value of rain fall duration

    T1= Inlet time

    T2= time of flow

    L= length of the drainV= Allowable Velocity of flow.

    With known value of coefficient of run off C and the Drainage area Ad, from the graph ofrain fall intensity duration frequency curve, the rain fall intensity (i) is found in mm/seccorresponding to duration T and frequency of return period.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    32/43

    DAR PORT MONTHLY RAIINFALLYear Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    2001 105.7 192.4 170.9 237.4 254.8 10.9 6 15.3 12.5 3.7 16.1 87.32002 98.2 61.7 49.2 595.9 42.6 2.6 44.2 79.9 27 47.5 43.6 125.32003 56.1 49.7 68 70.3 133.9 73.1 12.1 10 3.8 22.8 39.5 40.92004 52.7 135.1 53.4 143.4 36.1 41.7 3.3 3.5 66.1 127.7 45.5 172.32005

    93.3

    2.1

    71

    138.7

    408.5

    8.3

    9.2

    25.6

    10.3

    13.1

    45

    10

    2006 9.4 28.1 269.4 243.1 109.4 189.3 9 21.3 13.4 52.9 151.9 214.52007 10.2 20.9 140.2 190.8 219.9 28.5 11.2 42.3 2.3 5.9 73.8 18.92008 45.5 52.2 112.5 227.6 169.5 30.4 2.1 18.7 35.4 67 137.3 7.72009 65.4 49.6 51.7 197 16.7 16.9 2.9 2.5 0.5 17.6 7.4 32.82010 52.3 54.1 77.7 353.4 74.1 21.8 5.8 15.9 20.7 0 45.6 88.12011 9.5 34.4 40.6 205.1 72.2 13.2 3.7 19.9 38.3 22.7 77 235.12012 3.6 31.1 84.1 210.4 97.5 7.8m 8.1m m m m

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    33/43

    RAINFALL INTENSITY IN mm/hr

    15 MIN 30 MIN 1 HR 2 HRS 3 HRS 6 HRS 12 HRS

    2 YRS 92.08 65.04 42.78 23.66 16.62 9.50 4.99

    5 YRS 117.48 84.18 57.02 31.61 21.92 12.77 7.49

    10 YRS 134.32 96.84 66.44 36.87 25.42 14.93 7.91

    25 YRS 155.60 112.84 78.35 43.52 29.85 17.67 9.37

    50 YRS 171.40 124.72 87.19 48.45 33.13 19.70 10.46

    100 YRS 187.08 136.50 95.96 53.34 36.39 21.71 11.54

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    34/43

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    35/43

    Catchment Area(Ad)Drainage area(the area which drains rainfall into drainage)consists of;

    1 pavement area

    2 area of the adjoining land

    3 area of land on the other side of drain, with therecorresponding value of run-off coefficient C.

    From Chainage 0+00 to 0+150

    Length of road(the length of the stretch of land parallel tothe road from where water is expected to flow to theculvert)=150m

    Therefore drainage area consists of:-A half width of Carriageway 3.4m, C=0.8

    Width shoulder 1.35m, C=0.8

    Drainage Area (Ad)=

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    36/43

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    37/43

    CATCHMENT AREA (Ad)

    Drainage area (the area which drains rainfall into drainage)consists of;

    1 pavement area

    2 area of the adjoining land

    3 area of land on the other side of drain, with theircorresponding value of run-off coefficient C.

    From Chainage 0+00 to 0+150

    By using Simpsons rule the Drainage Area (Ad) = h/3(ho +hn4*even+ 2*odd+)

    = 20/3 (50.8+32.4) +4(79.8+15.2+21.8+32.4) +2(17.7+101.3)Drainage Area (Ad) =5746.7m

    2

    DATA ANALYSIS

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    38/43

    DATA ANALYSIS THE LENGTH, WIDTH AND THE HEIGHT OF THE EXISTING CULVERT.

    The culvert which is current not sufficient with the quantity of water flowing through its

    Length = 8.5m,

    Width = 3m,

    Height = 3m

    RUN OFF COEFFICIENT

    The value of run off coefficient C

    This determined by the type of material to be used to construct the culvert, which isconcrete material ranging from 0.3 - 0.55

    Therefore run off coefficient C = 0.4

    CATCHMENT AREA (Ad)

    Drainage area (the area which drains rainfall into drainage) consists of;

    1 pavement area

    2 area of the adjoining land

    3 area of land on the other side of drain, with their corresponding value of run-offcoefficient C.

    From Chainage 0+00 to 0+150By using Simpsons rule the Drainage Area (Ad) = h/3(ho hn4*even+ 2*odd+)

    = 20/3 (50.8+32.4) +4(79.8+15.2+21.8+32.4)+2(17.7+101.3)

    Drainage Area (Ad) =2593788.7m2

    HYDROLOGIC ANALYSIS

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    39/43

    HYDROLOGIC ANALYSIS This involves determining three parameters which are used in calculating quantity

    of water (Q) to be drain according to the following equation:

    Q=C*I*A

    Determination of Rainfall intensity (I)

    T1 = 27 min, the drain inlet is estimated using the Time flow inlet chart.

    T2= L/v =8.5/2*60

    =0.071min

    The time of concentration or the duration of storm for design may be taken as thesum inlet time and time of flow through the drain

    Tc = 27+0.071= 27 min

    Quantity of run off

    From the rationale formula

    Q= C i Ad

    C=0.4

    I =161mm/hrAd=2593789m

    2

    Q= (0.4 x 161 x 2593789 x 10-3)/3600

    =34.8m3/sec

    =35m3/sec

    CROSS SECTIONAL AREA OF THE

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    40/43

    CROSS SECTIONAL AREA OF THE

    CULVERT

    Q =A V

    A = Q/V

    V= 2m/sec

    Q =35m3/sec

    A =35/2

    =17.5

    Cross sectional area of the culvert =18m2

    The designed width and height of the culvert which will the

    sufficient to convey water across the Kijichi road;Width = 6m

    Height = 3m and the length of 8.5m.

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    41/43

    Designing of the culvert

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    42/43

  • 7/30/2019 Gad Loi Mini 2 . Presentation

    43/43

    REFERENCE

    Drainage Manual. (2000).

    Craig, F. R. (2004). Soil Mechanic,3rd Edition.

    KHANNA, S. K. (1991). Highway Engineering. 7th

    Edition: Nem Chand & Bros, Civil lines.

    Schofield, W. (n.d.). Engineering Survey 5th Edition.

    Tanzania Work Ministry (1999). Tanzania Pavement

    and Material design.