    PRE-INSTALLATION QUESTIONNAIRE

    ARL X-RAY SERIES

    AA83262-05

    Report QUESTIONNAIRE

    No AA83262-05

    Language E

    Date February 2011

    Department Doc

    Author Kah

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    4/22

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    5/22

     

    AA83262-05

    The information in this document is subject to change withoutnotice.

    We assume no responsibility for any errors that may appearin this document.

    Die Angaben in diesem Dokument können ohne vorherigeInformation geändert werden.

    Wir übernehmen keine Verantwortung für eventuelle Mängelin diesem Dokument.

    Les informations contenues dans ce document sont sujettesà changement sans préavis.

    Nous n’assumons aucune responsabilité pour toutes erreurséventuelles contenues dans ce document.

    Ci riserviamo il diritto di modificare le informazioni contenutenel presente manuale senza preavviso e non ne assumiamonessuna responsabilità quanto ad eventuali errori chepotrebbero esservi accidentalmente introdotti.

    Las informaciones contenidas en este documento puedenser modificadas sin previo aviso.

    Nosotros declinamos toda responsabilidad sobre loseventuales errores contenidos en este documento.

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    6/22

    PAGE DE MODIFICATION

    ÄNDERUNGSANGABEN

    REVISION CONTROL SHEET

    AA83262-05

    DateDatumDate

    ModificationÄnderungRevision

    DescriptionBeschreibungDescription

    2000August

    2002 April

    2004 December

    2005June

    2011February

    01

    02

    03

    04

    05

    Introduction of ADVANT'X Series

    General update and introduction of OPTIM’X

    Introduction of ARL ADVANT’X+ and OEM option forARL 9800

    General update and introduction of ARL 9900 Series

    Introduction of ARL PERFORM’X Series

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    7/22

     

    PRE-INSTALLATIONQUESTIONNAIRE

     

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    8/22

     

    AA83262-05 Pre-Installation Questionnaire 1

    1 INTRODUCTION

    The purpose of this pre-installation questionnaire is to help the user to prepare the installation of his ARL

    spectrometer. Please provide precise answers to the following questions and return the questionnaire as soon

    as possible, but by no means before your laboratory is completely prepared. By doing so, you will ensure that

    our engineer arrives on the expected date and that the installation is completed in the best possible conditionsand without loss of time.

    Any loss of time due to wrong information or bad preparation of the laboratory will be charged according to

    our tariff.

    The Pre-Installation Manual indicates all necessary information for the preparation of the laboratory in order

    to ensure an installation without delays and the proper functioning of your instrument.

    Once this form completed, please sign and send it back to your local Thermo Fisher representative.

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    9/22

     

    AA83262-05 Pre-Installation Questionnaire 2

    2 GENERAL INFORMATION

    Date of installation

    By which date will your laboratory be ready to receive the spectrometer(DD-MM-YYYY)?

    Expected starting date of installation by our Service Engineer?

    (DD-MM-YYYY)?

    Is this date flexible? Yes No

    Comments:

    Important: You have to confirm this date by letter or fax at least one month before the

    installation.

    Address of the laboratory:

    Company Name:

    Department:

    Street: No:

    City: Zip code:

    State:

    Country:

    Indicate the nearest airport: International airport

    Local airport

    Approximate distance between airport and plant: km

     Please send us a city map with the location of your company.

    Head quarter address (if different from above)

    Company:

    Address:

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    10/22

     

    AA83262-05 Pre-Installation Questionnaire 3

    User data, phone and fax numbers

    Company:

    Phone: Fax:

    E-Mail: Cellular:

    Person responsible for the equipment:  Mr / Mrs

    Phone: Extension:

    E-Mail: Fax:

    Operator: Mr / Mrs

    Phone: Extension:

    Laboratory:Phone: Extension:

    Hotel recommended for our Service Engineer

    Name:

    Address: Zip code:

    Phone: Fax:

    Estimate charge of the room (shower or bath):

    Approximate distance between the hotel and your plant: km

    In case our engineer will travel by plane, can you ensure his local

    transportation from airport to hotel / plant and from hotel to plant?

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    11/22

     

    AA83262-05 Pre-Installation Questionnaire 4

    Address for urgent spare parts shipment

    Please indicate the address of shipment and receiver’s name and address, in case urgent shipment of spare

    parts is needed:

    Receiver’s Name:

    Name of your forwarding agent:

    3 CERTIFICATION ISO

    Is your company certified ISO xx? Yes No

    If YES, which one?

    ISO 9001 ISO 14001 ISO 17025 OHSAS

    4 STORAGE

    Did you already receive your instrument ? Yes No

    If YES, when?

    Are you aware of the conditions for storage?

    (For details, refer to the Pre-installation manual)

    Yes No

    5 INSTRUMENT CONFIGURATION

    Does the spectrometer configuration defined in our confirmation order

    agree with your request?

    If NO please give more information.

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    12/22

     

    AA83262-05 Pre-Installation Questionnaire 5

    6 LABORATORY PREPARATION

    For the installation, maintenance and repairs, we need a free access of minimum 80 cm around the

    spectrometer. The recommended laboratory dimensions are 2.5 m x 2.5 m.

    Do you have unusual severe vibrations in your laboratory? Yes No

    If YES, do you want Thermo Fisher to provide additional shock absorbers? Yes No

    Does your laboratory meet the following environment conditions? Yes No

    Recommended value Customer value

    Instrument type

    Condition

    OPTIM’X

    ADVANT’X

    9900 OasisPERFORM’X 2500

    ADVANT’XP

    ADVANT’XP+

    9900 XP9900 XP+

    PERFORM’X 4200

    Temperature limits

    in °C

    Min. 18

    Max. 28

    Min. 18

    Max. 32

    Min.

    Max.

    °C

    Temperature variation ±1°C /h < 1 hour (thermal control)

    Long term variation 0,7°C /h drift

    °C/

    hour

    Relative humidity Min. 20 % / Max. 80 % %

    Altitude above sea level Max. 3000 m m

    Is an air conditioning installed in the laboratory? Yes No

    If YES what is its cooling power?

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    13/22

     

    AA83262-05 Pre-Installation Questionnaire 6

    7 POWER SUPPLY

    Mains connection

    Is the Mains power supply in the laboratory ready to be

    connected to the instrument?

    Yes No

    For ARL PERFORM’X series, ARL 9900 and ARL

    ADVANT’X series:

    Is the flexible cable available for the Mains connection? Yes No

    Does the cable meet the following specifications? Yes No

    9900 XP(+) ADVANT’XP(+) ADVANT’X / Oasis

    Cable section 1 line 16 mm2  ≥ 10 mm

    2  2.5 mm

    2 lines ≥ 10 mm2 ≥ 6 mm2 2.5 mm2 

    Instrument is connected on … PERFORM’X series

    Cable section 1 phase 230VAC or 2 Phases

    110VAC or 2 phases of 400VAC

    We recommend the use of

    typical 10 mm2.

    The user has to provide the right

    cable according to the country

    regulation

    Note: The maximum Mains cable section for ARL PERFORM’X series, ARL 9900and ADVANT’X series instruments is 16 mm

    For ARL OPTIM’X:

    Did you supply a plug corresponding to your local Mains?

    (Note: The wires section is 1.5 mm2)

    If NO please comment: 

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    14/22

     

    AA83262-05 Pre-Installation Questionnaire 7

    Does your Mains meet the following specifications? Yes No

    Recommended value Customer

    value

    Instrument type

    Condition

    9900 XP+ /

    Advant’XP+ /

    PERFORM’X

    4200

    9900 XP/

    Advant’XP

    3600

    9900 X+ /

    Advant’X+ /

    PERFORM’X

    2500

    9900

    Oasis/

    Advant’X

    1200

    Optim’X

    Power requirement 7 kVA 6 kVA 5 kVA 3.5 kVA 2 kVA kVA

    Voltage 230 V -15% +10% V

    Frequency 50 Hz or 60 Hz ± 1% Hz

    Voltage between

    Neutral and Earth

    < 1 V V

    Earth impedance < 2 Ω  Ω 

    Note: If the conditions mentioned above cannot be met, you might need to install an insulation

    transformer, voltage stabiliser or UPS (see section 10 of the present questionnaire).

    General comments:

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    15/22

     

    AA83262-05 Pre-Installation Questionnaire 8

    8 GAS SUPPLY (according to instrument configuration)P10 gas (90 % Ar + 10 % (±±±±5 %) CH4)

    Note: You need P10 gas only if your instrument is equipped with a flow proportional counter!

    Did you supply P10 gas bottles? Yes No

    If NO, please comment:

    Does the supplied gas meet the following specifications? Yes No

    Argon CH4

    Quality 48 35

    Purity >99.998% 99.95%

    Impurity O2  < 3 ppm < 10 ppm

    H2O < 3 ppm < 5 ppm

    N2  < 10 ppm < 200 ppm

    H2  < 1 ppm < 20 ppm

    CO2  < 1 ppm < 10 ppm

    C2H6  < 200 ppm

    CnHm  < 50 ppm

    If NO, please comment and contact your local Thermo Fisher representative for a local supplier:

    Helium

    Note: You need Helium only if you have chosen the option for analysis of liquid samples!

    Did you supply Helium gas bottles? Yes No

    If NO, please comment:

    Does the supplied gas meet the following specifications? Yes No

    Quality 46

    Purity 99.996%

    Impurity O2  < 5 ppm

    H2O < 10 ppm

    N2  < 15 ppm

    H2  < 1 ppm

    CO2  < 10 ppm

    CH4 + CnHm < 1 ppm

    If NO, please comment and contact your local Thermo Fisher representative for a local supplier:

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    16/22

     

    AA83262-05 Pre-Installation Questionnaire 9

    Pressure reducer

    Note: You need a pressure reducer only if you have chosen a gas option and if the reducer is not

    supplied by Thermo Fisher.

    Do you have a pressure reducer ? Yes No

    If YES, is it within the following setting range: 0.05 – 1 bar Yes No

    If NO, did you order a pressure reducer with a setting range 0.05 – 1 bar? Yes No

    9 WATER SUPPLY(only ARL PERFORM’X 4200, ARL 9900 XP/XP+ and ARL ADVANT’XP/XP+)

    The instruments ARL PERFORM’X 4200, ARL 9900 XP/ XP+ and ARL ADVANT’XP/ XP+ need to be

    cooled down with water.

    Is your tap water within the following specifications? Yes No

    Condition Recommended value Customer value

    Minimum flow 4.5 l/min l/min

    Pressure Min. / Max. 2.5 / 4.0 bar bar

    Temperature Min. / Max. 5 °C / 18 °C °C

    Acceptable hardness 5° to 25° French degrees

    5° to 15° French degrees

    (gypseous water)

    French

    degrees

    If NO, please comment:

    Is your tap water dirty and do you need to add a water filter?

    Yes No

    Note: If the tap water is not available, if its quality does not meet the specifications above or if

    you want to reduce water consumption, you need to install a water cooler (see section 10

    of the present questionnaire).

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    17/22

     

    AA83262-05 Pre-Installation Questionnaire 10

    10 ACCESSORIES

    Insulation transformer, Voltage stabiliser and UPS

    Is an insulation transformer, voltage stabiliser or UPS needed? Yes No

    If YES, 

    Which kind of device will be installed?

    Are you aware that these devices should be installed in a separate machine

    room?

    Yes No

    Is this machine room equipped with all electrical, gas and water supplies

    necessary for the installation of these devices?

    Yes No

    Is the device supplied from Thermo Fisher or locally? Yes No

    If supplied locally, 

    Does your insulation transformer, voltage stabiliser or UPS comply with

    the specifications indicated in the Pre-Installation Manual ?Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    18/22

     

    AA83262-05 Pre-Installation Questionnaire 11

    Water cooler

    Is a water cooler needed? Yes No

    If YES,

    Are you aware that water coolers should be installed in a separate machine

    room?

    Yes No

    Is this machine room equipped with all electrical, gas and water supplies

    necessary for the installation of the device?

    Yes No

    Is the water cooler supplied from Thermo Fisher or locally? ARL Locally

    If supplied from Thermo Fisher,

    Did you provide a circuit breaker for its line protection according to thefollowing specifications ?

    3-phase: 15 A breaker, 1 phase: 36 A breaker

    Yes No

    If supplied locally,

    Does your water cooler comply with the specifications for water mentioned

    in section 9 ?

    Yes No

    Did you provide a flexible pipe long enough for connection? Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    19/22

     

    AA83262-05 Pre-Installation Questionnaire 12

    11 SHIPMENT AND UNLOADING

    Have you read, understood and agreed with the shipment conditions?

    If NO please comment:

    Yes No

    Does someone of your company has participated in the custom clearance of

    your spectrometer ?

    Yes No

    If YES, have you any comment to make ?

    When receiving the instrument, carefully look at the wooden panels for any visible

    damage. If you detect any damage, please inform us immediately. Contact your insurance

    company as well and inform on the seen damage.

    At what level is located the laboratory (basement, floor, etc.)?

    Do you think that you will have difficulties to move and to transport the

    instrument?

    If YES please comment.

    Yes No

    Is a forklift truck or crane available for transport of the instrument to its

    final location?

    If NO please comment:

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    20/22

     

    AA83262-05 Pre-Installation Questionnaire 13

    12 INSTALLATION

    The installation of the instrument consists of four important parts:

    ♦  Unloading and checking of the equipment

    ♦  Connecting the instrument to all supplies and switching it on♦  Performing the basic tests and the acceptance test♦  Instructing the laboratory personnel in use and operation of the instrument and its software.

    The complete installation should not exceed 4 days.

    In order to complete installation without delay, please consider the following:

    Did you organize additional manpower for the installation?

    If NO please comment:

    Yes No

    Is an oscilloscope available (dual channels, 100 MHz)?

    If NO please comment:

    Yes No

    Have you a storage backup device available?

    If YES please comment which kind of:

    Yes No

    Training

    The service engineer will give the laboratory personnel a short instruction in the instrument operation and

    maintenance as well as in the software.

    Did you buy an additional on-site training (at your factory, during

    installation) ?

    Yes No

    Did you buy an additional training, which will take place at Thermo Fisher

    in Ecublens / Switzerland?

    If NO, would you like us to submit you a quotation for the following topic:

    OXSAS software Sample preparation

    UniQuant® software Analytical assistance

    Maintenance

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    21/22

     

    AA83262-05 Pre-Installation Questionnaire 14

    13 SAMPLES

    Sample preparation machine

    Ensure that all sample preparation machines are ready for using before the arrival of our

    service engineer.

    Are you aware that it is the user’s responsibility to install the sample

    preparation machines?

    If NO please comment:

    Yes No

    Are you familiar with the procedures for preparing samples with your

    installed machines or with those delivered with the spectrometer?

    Yes No

    Are you interested in a special training on sample preparation on site?

    Note:  This training is not included in the installation

    procedure.  Your local Thermo Fisher office will submit

    you a quotation for this extra work, if requested.

    Yes No

    If YES, please indicate machines / procedures

    Standard samples

    Standard samples are needed for the calibration of the instrument. If you did not order an instrument

    calibrated at factory, you will have to calibrate your spectrometer after installation. If you do not have any

    experience in calibrating an ARL instrument, the service engineer will show you a typical example of

    calibration with his own standard samples.

    Are you aware that the calibration of the spectrometer is not included in the

    installation procedure?

    Yes No

    Is one of your operator or maintenance employees already experienced in

    ARL instruments ?

    Yes No

    If YES, please indicate the type and serial number of the instrument.

    Do you need an analytical assistance or a full calibration of your

    spectrometer on site?

    Yes No

    Note: This work is not included in the installation procedure .

    Your local Thermo Fisher office will submit you a

    quotation for this extra work, if requested.

    Do you have a set of standard samples according to your needs?

    If YES, please add the list of the standard samples.

    Yes No

  • 8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5

    22/22

     

    14 RETURN OF THE QUESTIONNAIRE

    It is essential that you answer all questions. The installation cannot start until the laboratory is ready and the

    completed and signed questionnaire is returned. Any waste of time during installation due to wrong

    indication in this questionnaire will be at your charge.

    Our local Thermo Fisher representative remains at your disposal for further information.

     Please return this questionnaire to: 

    Your Thermo Fisher representative

     Phone:

     Fax:

    Name and function of the signatory:

    Name:

    Function:

    Stamp and date: Signature: