PRE-INSTALLATION QUESTIONNAIRE
ARL X-RAY SERIES
AA83262-05
Report QUESTIONNAIRE
No AA83262-05
Language E
Date February 2011
Department Doc
Author Kah
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
4/22
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
5/22
AA83262-05
The information in this document is subject to change withoutnotice.
We assume no responsibility for any errors that may appearin this document.
Die Angaben in diesem Dokument können ohne vorherigeInformation geändert werden.
Wir übernehmen keine Verantwortung für eventuelle Mängelin diesem Dokument.
Les informations contenues dans ce document sont sujettesà changement sans préavis.
Nous n’assumons aucune responsabilité pour toutes erreurséventuelles contenues dans ce document.
Ci riserviamo il diritto di modificare le informazioni contenutenel presente manuale senza preavviso e non ne assumiamonessuna responsabilità quanto ad eventuali errori chepotrebbero esservi accidentalmente introdotti.
Las informaciones contenidas en este documento puedenser modificadas sin previo aviso.
Nosotros declinamos toda responsabilidad sobre loseventuales errores contenidos en este documento.
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
6/22
PAGE DE MODIFICATION
ÄNDERUNGSANGABEN
REVISION CONTROL SHEET
AA83262-05
DateDatumDate
ModificationÄnderungRevision
DescriptionBeschreibungDescription
2000August
2002 April
2004 December
2005June
2011February
01
02
03
04
05
Introduction of ADVANT'X Series
General update and introduction of OPTIM’X
Introduction of ARL ADVANT’X+ and OEM option forARL 9800
General update and introduction of ARL 9900 Series
Introduction of ARL PERFORM’X Series
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
7/22
PRE-INSTALLATIONQUESTIONNAIRE
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
8/22
AA83262-05 Pre-Installation Questionnaire 1
1 INTRODUCTION
The purpose of this pre-installation questionnaire is to help the user to prepare the installation of his ARL
spectrometer. Please provide precise answers to the following questions and return the questionnaire as soon
as possible, but by no means before your laboratory is completely prepared. By doing so, you will ensure that
our engineer arrives on the expected date and that the installation is completed in the best possible conditionsand without loss of time.
Any loss of time due to wrong information or bad preparation of the laboratory will be charged according to
our tariff.
The Pre-Installation Manual indicates all necessary information for the preparation of the laboratory in order
to ensure an installation without delays and the proper functioning of your instrument.
Once this form completed, please sign and send it back to your local Thermo Fisher representative.
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
9/22
AA83262-05 Pre-Installation Questionnaire 2
2 GENERAL INFORMATION
Date of installation
By which date will your laboratory be ready to receive the spectrometer(DD-MM-YYYY)?
Expected starting date of installation by our Service Engineer?
(DD-MM-YYYY)?
Is this date flexible? Yes No
Comments:
Important: You have to confirm this date by letter or fax at least one month before the
installation.
Address of the laboratory:
Company Name:
Department:
Street: No:
City: Zip code:
State:
Country:
Indicate the nearest airport: International airport
Local airport
Approximate distance between airport and plant: km
Please send us a city map with the location of your company.
Head quarter address (if different from above)
Company:
Address:
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
10/22
AA83262-05 Pre-Installation Questionnaire 3
User data, phone and fax numbers
Company:
Phone: Fax:
E-Mail: Cellular:
Person responsible for the equipment: Mr / Mrs
Phone: Extension:
E-Mail: Fax:
Operator: Mr / Mrs
Phone: Extension:
Laboratory:Phone: Extension:
Hotel recommended for our Service Engineer
Name:
Address: Zip code:
Phone: Fax:
Estimate charge of the room (shower or bath):
Approximate distance between the hotel and your plant: km
In case our engineer will travel by plane, can you ensure his local
transportation from airport to hotel / plant and from hotel to plant?
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
11/22
AA83262-05 Pre-Installation Questionnaire 4
Address for urgent spare parts shipment
Please indicate the address of shipment and receiver’s name and address, in case urgent shipment of spare
parts is needed:
Receiver’s Name:
Name of your forwarding agent:
3 CERTIFICATION ISO
Is your company certified ISO xx? Yes No
If YES, which one?
ISO 9001 ISO 14001 ISO 17025 OHSAS
4 STORAGE
Did you already receive your instrument ? Yes No
If YES, when?
Are you aware of the conditions for storage?
(For details, refer to the Pre-installation manual)
Yes No
5 INSTRUMENT CONFIGURATION
Does the spectrometer configuration defined in our confirmation order
agree with your request?
If NO please give more information.
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
12/22
AA83262-05 Pre-Installation Questionnaire 5
6 LABORATORY PREPARATION
For the installation, maintenance and repairs, we need a free access of minimum 80 cm around the
spectrometer. The recommended laboratory dimensions are 2.5 m x 2.5 m.
Do you have unusual severe vibrations in your laboratory? Yes No
If YES, do you want Thermo Fisher to provide additional shock absorbers? Yes No
Does your laboratory meet the following environment conditions? Yes No
Recommended value Customer value
Instrument type
Condition
OPTIM’X
ADVANT’X
9900 OasisPERFORM’X 2500
ADVANT’XP
ADVANT’XP+
9900 XP9900 XP+
PERFORM’X 4200
Temperature limits
in °C
Min. 18
Max. 28
Min. 18
Max. 32
Min.
Max.
°C
Temperature variation ±1°C /h < 1 hour (thermal control)
Long term variation 0,7°C /h drift
°C/
hour
Relative humidity Min. 20 % / Max. 80 % %
Altitude above sea level Max. 3000 m m
Is an air conditioning installed in the laboratory? Yes No
If YES what is its cooling power?
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
13/22
AA83262-05 Pre-Installation Questionnaire 6
7 POWER SUPPLY
Mains connection
Is the Mains power supply in the laboratory ready to be
connected to the instrument?
Yes No
For ARL PERFORM’X series, ARL 9900 and ARL
ADVANT’X series:
Is the flexible cable available for the Mains connection? Yes No
Does the cable meet the following specifications? Yes No
9900 XP(+) ADVANT’XP(+) ADVANT’X / Oasis
Cable section 1 line 16 mm2 ≥ 10 mm
2 2.5 mm
2
2 lines ≥ 10 mm2 ≥ 6 mm2 2.5 mm2
Instrument is connected on … PERFORM’X series
Cable section 1 phase 230VAC or 2 Phases
110VAC or 2 phases of 400VAC
We recommend the use of
typical 10 mm2.
The user has to provide the right
cable according to the country
regulation
Note: The maximum Mains cable section for ARL PERFORM’X series, ARL 9900and ADVANT’X series instruments is 16 mm
2
For ARL OPTIM’X:
Did you supply a plug corresponding to your local Mains?
(Note: The wires section is 1.5 mm2)
If NO please comment:
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
14/22
AA83262-05 Pre-Installation Questionnaire 7
Does your Mains meet the following specifications? Yes No
Recommended value Customer
value
Instrument type
Condition
9900 XP+ /
Advant’XP+ /
PERFORM’X
4200
9900 XP/
Advant’XP
3600
9900 X+ /
Advant’X+ /
PERFORM’X
2500
9900
Oasis/
Advant’X
1200
Optim’X
Power requirement 7 kVA 6 kVA 5 kVA 3.5 kVA 2 kVA kVA
Voltage 230 V -15% +10% V
Frequency 50 Hz or 60 Hz ± 1% Hz
Voltage between
Neutral and Earth
< 1 V V
Earth impedance < 2 Ω Ω
Note: If the conditions mentioned above cannot be met, you might need to install an insulation
transformer, voltage stabiliser or UPS (see section 10 of the present questionnaire).
General comments:
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
15/22
AA83262-05 Pre-Installation Questionnaire 8
8 GAS SUPPLY (according to instrument configuration)P10 gas (90 % Ar + 10 % (±±±±5 %) CH4)
Note: You need P10 gas only if your instrument is equipped with a flow proportional counter!
Did you supply P10 gas bottles? Yes No
If NO, please comment:
Does the supplied gas meet the following specifications? Yes No
Argon CH4
Quality 48 35
Purity >99.998% 99.95%
Impurity O2 < 3 ppm < 10 ppm
H2O < 3 ppm < 5 ppm
N2 < 10 ppm < 200 ppm
H2 < 1 ppm < 20 ppm
CO2 < 1 ppm < 10 ppm
C2H6 < 200 ppm
CnHm < 50 ppm
If NO, please comment and contact your local Thermo Fisher representative for a local supplier:
Helium
Note: You need Helium only if you have chosen the option for analysis of liquid samples!
Did you supply Helium gas bottles? Yes No
If NO, please comment:
Does the supplied gas meet the following specifications? Yes No
Quality 46
Purity 99.996%
Impurity O2 < 5 ppm
H2O < 10 ppm
N2 < 15 ppm
H2 < 1 ppm
CO2 < 10 ppm
CH4 + CnHm < 1 ppm
If NO, please comment and contact your local Thermo Fisher representative for a local supplier:
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
16/22
AA83262-05 Pre-Installation Questionnaire 9
Pressure reducer
Note: You need a pressure reducer only if you have chosen a gas option and if the reducer is not
supplied by Thermo Fisher.
Do you have a pressure reducer ? Yes No
If YES, is it within the following setting range: 0.05 – 1 bar Yes No
If NO, did you order a pressure reducer with a setting range 0.05 – 1 bar? Yes No
9 WATER SUPPLY(only ARL PERFORM’X 4200, ARL 9900 XP/XP+ and ARL ADVANT’XP/XP+)
The instruments ARL PERFORM’X 4200, ARL 9900 XP/ XP+ and ARL ADVANT’XP/ XP+ need to be
cooled down with water.
Is your tap water within the following specifications? Yes No
Condition Recommended value Customer value
Minimum flow 4.5 l/min l/min
Pressure Min. / Max. 2.5 / 4.0 bar bar
Temperature Min. / Max. 5 °C / 18 °C °C
Acceptable hardness 5° to 25° French degrees
5° to 15° French degrees
(gypseous water)
French
degrees
If NO, please comment:
Is your tap water dirty and do you need to add a water filter?
Yes No
Note: If the tap water is not available, if its quality does not meet the specifications above or if
you want to reduce water consumption, you need to install a water cooler (see section 10
of the present questionnaire).
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
17/22
AA83262-05 Pre-Installation Questionnaire 10
10 ACCESSORIES
Insulation transformer, Voltage stabiliser and UPS
Is an insulation transformer, voltage stabiliser or UPS needed? Yes No
If YES,
Which kind of device will be installed?
Are you aware that these devices should be installed in a separate machine
room?
Yes No
Is this machine room equipped with all electrical, gas and water supplies
necessary for the installation of these devices?
Yes No
Is the device supplied from Thermo Fisher or locally? Yes No
If supplied locally,
Does your insulation transformer, voltage stabiliser or UPS comply with
the specifications indicated in the Pre-Installation Manual ?Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
18/22
AA83262-05 Pre-Installation Questionnaire 11
Water cooler
Is a water cooler needed? Yes No
If YES,
Are you aware that water coolers should be installed in a separate machine
room?
Yes No
Is this machine room equipped with all electrical, gas and water supplies
necessary for the installation of the device?
Yes No
Is the water cooler supplied from Thermo Fisher or locally? ARL Locally
If supplied from Thermo Fisher,
Did you provide a circuit breaker for its line protection according to thefollowing specifications ?
3-phase: 15 A breaker, 1 phase: 36 A breaker
Yes No
If supplied locally,
Does your water cooler comply with the specifications for water mentioned
in section 9 ?
Yes No
Did you provide a flexible pipe long enough for connection? Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
19/22
AA83262-05 Pre-Installation Questionnaire 12
11 SHIPMENT AND UNLOADING
Have you read, understood and agreed with the shipment conditions?
If NO please comment:
Yes No
Does someone of your company has participated in the custom clearance of
your spectrometer ?
Yes No
If YES, have you any comment to make ?
When receiving the instrument, carefully look at the wooden panels for any visible
damage. If you detect any damage, please inform us immediately. Contact your insurance
company as well and inform on the seen damage.
At what level is located the laboratory (basement, floor, etc.)?
Do you think that you will have difficulties to move and to transport the
instrument?
If YES please comment.
Yes No
Is a forklift truck or crane available for transport of the instrument to its
final location?
If NO please comment:
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
20/22
AA83262-05 Pre-Installation Questionnaire 13
12 INSTALLATION
The installation of the instrument consists of four important parts:
♦ Unloading and checking of the equipment
♦ Connecting the instrument to all supplies and switching it on♦ Performing the basic tests and the acceptance test♦ Instructing the laboratory personnel in use and operation of the instrument and its software.
The complete installation should not exceed 4 days.
In order to complete installation without delay, please consider the following:
Did you organize additional manpower for the installation?
If NO please comment:
Yes No
Is an oscilloscope available (dual channels, 100 MHz)?
If NO please comment:
Yes No
Have you a storage backup device available?
If YES please comment which kind of:
Yes No
Training
The service engineer will give the laboratory personnel a short instruction in the instrument operation and
maintenance as well as in the software.
Did you buy an additional on-site training (at your factory, during
installation) ?
Yes No
Did you buy an additional training, which will take place at Thermo Fisher
in Ecublens / Switzerland?
If NO, would you like us to submit you a quotation for the following topic:
OXSAS software Sample preparation
UniQuant® software Analytical assistance
Maintenance
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
21/22
AA83262-05 Pre-Installation Questionnaire 14
13 SAMPLES
Sample preparation machine
Ensure that all sample preparation machines are ready for using before the arrival of our
service engineer.
Are you aware that it is the user’s responsibility to install the sample
preparation machines?
If NO please comment:
Yes No
Are you familiar with the procedures for preparing samples with your
installed machines or with those delivered with the spectrometer?
Yes No
Are you interested in a special training on sample preparation on site?
Note: This training is not included in the installation
procedure. Your local Thermo Fisher office will submit
you a quotation for this extra work, if requested.
Yes No
If YES, please indicate machines / procedures
Standard samples
Standard samples are needed for the calibration of the instrument. If you did not order an instrument
calibrated at factory, you will have to calibrate your spectrometer after installation. If you do not have any
experience in calibrating an ARL instrument, the service engineer will show you a typical example of
calibration with his own standard samples.
Are you aware that the calibration of the spectrometer is not included in the
installation procedure?
Yes No
Is one of your operator or maintenance employees already experienced in
ARL instruments ?
Yes No
If YES, please indicate the type and serial number of the instrument.
Do you need an analytical assistance or a full calibration of your
spectrometer on site?
Yes No
Note: This work is not included in the installation procedure .
Your local Thermo Fisher office will submit you a
quotation for this extra work, if requested.
Do you have a set of standard samples according to your needs?
If YES, please add the list of the standard samples.
Yes No
8/18/2019 Xrf Pre-Installation Questionnaire Aa83262-5
22/22
14 RETURN OF THE QUESTIONNAIRE
It is essential that you answer all questions. The installation cannot start until the laboratory is ready and the
completed and signed questionnaire is returned. Any waste of time during installation due to wrong
indication in this questionnaire will be at your charge.
Our local Thermo Fisher representative remains at your disposal for further information.
Please return this questionnaire to:
Your Thermo Fisher representative
Phone:
Fax:
Name and function of the signatory:
Name:
Function:
Stamp and date: Signature: