72
RESETTLEMENT POLICY FRAMEWORK FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE CHAIN MANAGEMENT PROJECT January, 2014 RP1562 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

RESETTLEMENT POLICY FRAMEWORK

FOR

THE GAMBIA

COMMERCIAL AGRICULTURE

AND

VALUE CHAIN MANAGEMENT

PROJECT

January, 2014

RP1562 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

ii

Table of contents Contents Abbreviations and acronyms.......................................................................................................... iv

Definition of terms .......................................................................................................................... v

Executive Summary ...................................................................................................................... vii

1.Introduction .................................................................................................................................. 1

1.1 Project Description................................................................................................................ 1

1.2 Rationale for Preparation of a RPF ....................................................................................... 6

1.3 Objectives and Principles of the RPF ................................................................................... 6

1.4 Process for the preparation and approval of RAPs ............................................................... 7

1.5 Extent and scope of Resettlement within the project ............................................................ 7

2. Institutional and Legal Frameworks ........................................................................................... 8

2.1 Gambia institutional and legal framework ............................................................................ 8

2.2 World Bank Policies ........................................................................................................... 10

2.3 Comparison of the Gambia Legal Framework and WB Policies ........................................ 12

2.3 Conclusions: Bridging the Gaps ......................................................................................... 14

3. Eligibility and Entitlements ...................................................................................................... 15

3.1 Eligibility ........................................................................................................................ 15

3.2 Entitlements ........................................................................................................................ 16

3.3 Valuing Affected Assets ..................................................................................................... 19

4. RAP Information Requirement ................................................................................................. 22

4.1 Census and Inventory of Project Affected Persons (PAPs) ................................................ 22

4.2 Identification of losses ........................................................................................................ 22

4.3 Baseline Survey .................................................................................................................. 23

5. Implementation Arrangements .................................................................................................. 24

5.1 RAP Development and Approval process .......................................................................... 24

5.2 RAP implementation Process ............................................................................................. 25

5.3 Supervision and Monitoring ............................................................................................... 28

6. Public participation and consultation ........................................................................................ 30

ANNEXES .................................................................................................................................... 32

Annex 1 OP 4.12 - Involuntary Resettlement ........................................................................... 32

Annex 2 TOR ............................................................................................................................ 45

Annex 3 land assets and physical inventory survey form ......................................................... 51

Annex 4 Sample Census Survey form ...................................................................................... 51

Annex 5 Detailed Screening Checklist for Environmental and Social Impacts ....................... 52

Page 3: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

iii

Annex 6 involuntary land acquisition and resettlement form ................................................... 57

Annex 7 consultations with communities ................................................................................. 60

Annex 8 budget template .......................................................................................................... 63

Annex 9 sample Entitlement costing matrix of project affected people ................................... 63

Bibliography ............................................................................................................................. 63

List of Tables

Table1 : Categorization and Resettlement Planning Requirements

Table 2: Comparison of National laws with World Bank Safeguard Policies

Table 3: Forms of compensation

Table 4: Matrix of entitlement and Compensation Packages by Type of Asset Lost and

Ownership Right

Table 5: Methods of Valuation

Table 6: Verifiable indicators

Page 4: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

iv

Abbreviations and acronyms CC Compensation Committee

EIA Environmental Impact Assessment

ESSC Environmental and Social Screening Checklist

GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

GCRC Gross Current Replacement Cost

MIGA Multilateral Investment Guarantee Agency

NALA The National Agency for Legal Aid

NEA National Environment Agency

NGOs None Governmental Organization

MOA Ministry of Agriculture

PAPs Project Affected Persons

PCU Project Coordination Unit

RAP Resettlement Action Plan

RAP Resettlement Policy

Page 5: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

v

Definition of terms An Environmental Impact Assessment (EIA) An Environmental Assessment

instrument to identify and assess major potential environmental impact of proposed sub

projects, evaluate alternatives and design appropriate mitigation, management and

monitoring measure.

Bantaba: means an open space in the community where people meet to discuss communal

matters. It is mainly occupied by men.

Compensation : Means payment in cash or in-kind at replacement cost for an asset

to be acquired by the Project.

Cut-off Date : Means the date that a population record or census, preferably at

the project identification stage, serves as an eligibility cut-off date in order to prevent a

subsequent influx of encroachers or others who wish to take advantage of such benefits. The cut-

off date will be the date when the census for the RP is completed

District Authority: means the district authority established under section 132 of the

Local Government Act 2002. The District Authority is responsible for managing the

affairs of the district

Entitlement : Means the range of measures comprising compensation, income

restoration, transfer assistance, income substitution, and relocation

which are due to affected people, depending on the nature of

their losses, to restore their economic and social base.

Inventory of Losses: Means the pre-appraisal inventory of assets as a preliminary record

of affected or lost assets.

Land Acquisition : Means the process whereby a person is compelled by the local

administration through the executing Agency of the Project to alienate

all or part of the land s/he owns or possesses in favor of the State in the implementation of the

Project or any of its components in return for consideration.

Kabilo: cluster of compounds in a village with communal ownership of land

Market Value: means the most probable selling price or the value most often sought by

buyers and sellers.

Project affected persons: Means a person affected by direct economic and social impacts

caused by: a. the involuntary taking of land resulting in (i) relocation or loss of shelter; (ii) loss

of assets or access to assets; or (iii) loss of income sources or means of livelihood, whether

Page 6: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

vi

or not the affected persons must move to another location; b. involuntary restriction of access to

legally designated parks and protected areas resulting in adverse impacts on the livelihoods of

the displaced persons.

Resettlement : Means all measures taken by the Project to mitigate any and all adverse social

impacts of the Project on the PAPs, including compensation for lost assets and incomes, and the

provision of other entitlements, income restoration assistance, and relocation

as needed.

Resettlement Plan: Means the time-bound action plan with budget setting out resettlement

strategy, objectives, entitlements, actions, responsibilities, monitoring and evaluation.

Resettlement Policy Framework: is a safe guard policy and legal requirement for both the

Government of The Gambia and the WB. The purpose is to have a proactive resettlement system

rather than an adhoc one. It clarifies resettlement principles, organizational arrangements, and

design procedures to be applied incase in any sub project requires involuntary resettlement

during project implementation.

Vulnerable Groups: Means special groups of people who might suffer disproportionately from

the loss of assets, and production base from the effects of resettlement and specifically include:

(i)divorced or widowed female headed households with dependents and low income;(ii)

households with disabled persons or people living with HIV or chronically ill; (iii) households

with persons falling under the category of extreme poor (iv) elderly with no means of support.

Page 7: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

vii

Executive Summary

This Resettlement Policy Framework (RPF) provides a broad framework and guidelines for the

Government of The Gambia and its line ministries, local communities for the development of

Resettlement Plans under the Gambia Commercial Agriculture and Value Management Project

(GCVMP). Where a sub-project/s involve involuntary land acquisition or the restriction on

access to economic/natural resources then a Resettlement Action Plan is needed to be prepared as

per the agreement of the Government with the World Bank. This RPF defines the project

affected persons (PAPs) and provide guidelines for suggested compensation measures to be

incorporate in the RAP).

The Development objective of this Project is to improve production systems and access to

market for targeted agricultural commodities for smallholders in rural Gambia. The Project has

three components underpinned by sub-components.

Component One: Support for development of irrigation and key productive infrastructure

with four sub components at a cost of $15 million

Component Two: Support to value chain management with three sub components at $

3.5million

Component 3: Project Administration and Institution Building with four sub components

at a cost of $2 million

According to the World Bank classification of project investments, the GCAVMP is a category

B with moderate social or environmental impacts, including certain financial intermediary

projects with minimal adverse risks. A Resettlement Policy Framework (RPF) is being

prepared to guide the development of future Resettlement Plans (RP) in terms of the principles and

procedures that will govern land acquisition, compensation and economic assistance to project

affected persons (PAPs). The Principles and resettlement measures which will be applied in all

the project subcomponents will be in accordance with this Resettlement Policy Framework

(RPF) which is also in compliance with National laws and World Bank Operational Policy 4.12.

In the unlikely event that involuntary resettlement and land acquisition is unavoidable, a RA P

will be prepared. The activities to be undertaken must include: communication between the

Project and the community; conducting of socio-economic survey; identifying the impacts of the

resettlement on assets and livelihoods; identify affected persons/groups; conduct valuation

exercise; preparing resettlement costs and submitting to appropriate authorities in this case the

PCU for funding and carry out compensation of the affected persons.

Valuation procedure to be followed must include the use of use of Standard Valuation Tables

and Preparation of Asset Inventory and valuation methods to be adopted shall also include

Replacement Cost method/Approach, Gross Current Replacement Cost method, Comparative

Sales Method and Other methods such as Rates from Contractors. All land acquisition and

compensated shall be in accordance with the Gambia’s legal provisions such as the Land

Acquisition and Compensation Act 1991 and the WB Safeguard Policy. Consultations as per the

provisions in the this policy framework shall be followed which includes but not limited to

public meetings/bantabas, , involvement of PAPs in resettlement committees, documentation of

holdings and assets, agreements on compensation package, and payments, awarding of contracts.

Page 8: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

viii

The institutional arrangement is such that relevant institutions will be engaged according to their

respective roles and responsibilities. RAP shall also include a grievances redress mechanism

which starts from the community to national level.

Resettlement and compensation shall be the responsibility of the Government of the Gambia and

supervision and monitoring should be carried out by the PCU, the WB, communities and NGOs

for feedback and corrections where necessary. Disclosure is a must for any RAP to be executed

which will include distribution and explanation of copies of the RAP to the communities, NGOs,

experts, local Government Authorities, Village and “Kabilo” heads, for their inputs and the WB

Info-shop for wider disclosure to the national and international.

Page 9: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

1.Introduction

The Government of The Gambia has requested funds from the World Bank for the

implementation of the Commercial Agriculture and Value Chain Management Project

(GCAVMP ). The proposed Project Development Objective (PDO) is to improve production

systems and access to market for targeted agricultural commodities for smallholders in rural

Gambia. To achieve this objective, the project would support targeted investments to remove

critical constraints, improve productivity and efficiency and build organizational and

institutional capacities of both public and private sector stakeholders. In particular, the project

would: (i) rehabilitate irrigation infrastructure to enhance the resilience of agricultural

production systems to climate change-induced weather shocks in selected areas; (ii)

rehabilitate/build commercial postharvest infrastructure to facilitate processing and marketing

of agricultural products (iii) support strengthening of the technical, institutional, managerial

and marketing capacities of smallholders and their organizations, as well as the associations of

other stakeholders involved in agricultural production and value chains management, to more

effectively operate in a market-driven environment; and (iv) provide institutional-strengthening

support to improve the governance of GNAIP.

1.1 Project Description

The proposed project would support interventions designed to help the agriculture sector

improve productivity and build resilience against weather-related shocks, while improving

market access to provide incentives for farmers to produce more. It will seek to maximize the

limited Grant resources by focusing: (i) project support on limited number of commodity value

chains that are both important in terms of food security and nutrition, and have significant

development potential to respond to market opportunities, and in limited geographical areas with

suitable agro-climatic conditions; (ii) project activities in each selected value-chain on resolving

the binding constraints on productivity, quality, and value-addition; (iii) on ensuring a fair

balance between required hardware as well as software investments to adequately address

identified constraints; (v) on linking investments supported under the project to the establishment

of sustainable financing mechanisms with improved governance of internally generated

resources within the supply chains actors and their associations to finance operation and

maintenance and future capital investments; and (vi) on coordinating with similar projects

supported by other development partners, in terms of design and implementation, to leverage

support in critical areas on the value chains and avoid duplication and enhance development

outcomes of interventions.

Project Components

The activities of the project are clustered around two main interlinked technical components: (i)

support to development of irrigation and productive infrastructure and (ii) support to value chain

development. The third component deals with coordination of project activities, and support to

the Ministry of Agriculture for overall sector coordination, to facilitate the implementation of the

Gambia National Agricultural Investment Program (GNAIP).

Component 1: Support for development of irrigation and key productive infrastructure--

$15 million

Page 10: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

2

This component would support critical public and private infrastructure needs to enhance the

resilience and competitiveness of the agricultural sector. The objective of this component is to

support the rehabilitation and/or improvement, and management of tidal irrigation schemes and

key small-scale productive infrastructures to address key constraints in the agricultural

production system in order to improve productivity, and to further develop and increase the

efficiency of key value chains through improved access to markets. This objective will be

pursued under the following subcomponents: (i) irrigation development; (ii) farm production

improvement support; (iii) promoting/leveraging private sector investments in agri-business; (iv)

support access to key productive assets; and (v) improving the agricultural investment climate.

Sub-component 1.1-- Irrigation Development (with focus on tidal irrigation schemes)

The sub-component would complement on-going donor support and public sector investments in

land and water management so as to reduce the country’s vulnerability to climate change induced

risks, and raise the productive potential of the limited supply of agricultural land and to boost

rice productivity.. Under this sub-component, the project would finance the rehabilitation of

3000ha of existing tidal irrigation schemes for intensive rice cultivation, in rotation with off–

season vegetables, and sweet potatoes (particularly orange flesh beta-carotene varieties to

improve household nutrition) around CRR (North and South), where tidal irrigation is most

suitable. The selection of specific tidal areas would be carried out after detailed analysis of

technical, financial, economic, institutional, environmental and social aspects of the investments

in the tidal schemes. The activities to be financed would include: (i) physical rehabilitation of

existing tidal irrigation works, including main and secondary canals and drainage structures

(works and goods); construction of on-farm irrigation systems (works and goods); and (ii)

institutional support for a more efficient and sustainable operation and maintenance of the

infrastructure and the land and water resources for irrigated agriculture (technical assistance and

training). Detailed design of irrigation and drainage schemes will be developed. The Ministry of

Agriculture will work closely with the Ministry of Water Resources to design and appraise these

schemes, with participation from the water users and appraised by technical specialists appointed

by the supervising Ministry for the project. The sites would be selected based on: (i) proximity to

markets, (ii) cost and quality evaluation, and (iii) interest expressed by farmer

groups/cooperatives to undertake the development of tertiary network and take subsequent

responsibility for management and maintenance.

The sub-component activities would also include the establishment and capacity building of

Water User Associations (WUAs), and the preparation of management and maintenance

programs for irrigation facilities and equipment.

Sub-Component 1.2: Farm production improvement support:

The objective of this sub-component is to enhance the producers’ access to improved

technologies (including climate-smart technologies) which increase productivity and

competitiveness. This sub-component would coordinate with and leverage WAAPP support in

the identification, implementation of applied research and the dissemination of proven

technologies which are cost-efficient, responsive to market demands and incentives, and enhance

the environmental sustainability of farming practices of the targeted commodities. Technologies

addressing nutrition issues such as nutrient-high varieties, as well as those addressing climate

Page 11: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

3

change issues (such as adaptation and resilience) would be deliberately targeted for adoption. It

would also leverage on seed distribution schemes of WAAPP to increase access of farmers to

improved seed.

Sub-Component 1.3: Promoting/leveraging private sector investment in agribusiness:

Under this sub-component, the project would support activities designed to address some of the

key constraints on the value addition potential of Gambian agriculture. These include:

insufficient agribusiness capacity of smallholders and processors, lack of competitiveness; low

access to financial capital; undeveloped access to markets; weak market information systems;

limited processing and storage facilities; and huge post-harvest losses (estimated at 30-50

percent, especially for fruits). The sub-component would leverage private investment through

demand-driven, public-private partnerships with targeted beneficiaries, including producer’

organizations, professional associations of agro-processors and other relevant Small and

Medium-scale agribusiness Enterprises (SMEs) to increase domestic production and processing

capacities for high-quality rice and horticultural produce (particularly mango) for urban markets..

A number of financing mechanisms to leverage private investments would be investigated during

project preparation, including matching grants and first loss provisions for credit extended

through farming contracts. The project would also help promote linkages with local rice traders

for distribution of processed rice to urban markets. The framework of the relationship between

the famer-based organizations and the agro-dealers/agro-enterprises will be established during

project appraisal. The investments to be supported by the project include support for upgrading

or construction of rice processing facilities; processing units and postharvest management of

fruits and vegetables, cold chain equipment, warehouses, packaging units etc.

Sub-component 1.4-- Support Access to key Productive Infrastructure:

The sub-component aims at enhancing the mechanization of the agricultural works (field

preparation, harvesting and threshing etc.)by building the capacity of the various stakeholders in

the private sector, particularly producer groups, and the facilitation of start-up businesses

supplying these services to the sector. In this vain the sub-component would support sub-projects

that largely consist of equipment that requires a business-type use and management to be

sustainable and profitable, for which the matching grant ratio would (initially) be set at 60%

project contribution and 40% beneficiary contribution (to be firmed up at appraisal), under the

condition that the beneficiary group has a contractual agreement with its members to use and

manage the equipment as a microenterprise, providing services to the whole group and or

community. The sub-component would also be extended to young entrepreneurs who would

farm service centers to provide services to farmers

Component 2: Support to value chain management--$ 3.5million (of which IDA Grant: $3.5

million).

The objective of this component is to develop and strengthen the institutional capacity of farmer-

based organizations, the professional associations of private sector participants in the value

chain; to scale up best practices and support farmers’ and private sector participants’ sub-

projects to address key constraints and exploit the opportunities to improve the productivity,

Page 12: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

4

processing, and marketing of selected commodities; and to strengthen marketing and agri-

business development through engagement with private sector stakeholders.

The project would facilitate the establishment, development and operation of private The

component would take a gender and vulnerable group sensitive approach to capacity building

and provide support to improved nutritional status among rural households in project affected

districts.

Sub-component 2.1: Institutional strengthening and value chain coordination:

Under this sub-component, the project would strengthen the technical and management capacity

of producer groups, professional associations of other participating stakeholders. The project

would under this sub-component enable producers to adopt effective organizational approaches

to access competitive input and output markets through formal linkages between smallholders

and either larger-scale commercial farms or separate services providers. The managerial and

business capacities of local micro-enterprises that support farming activities (small processors,

craftsmen and local traders) will be strengthened, including the ability to properly handle

contracts, and managing business accounts, creating networks and forming professional

organizations. This training activity would be contracted to a competent service provider. As far

as the eligibility and selection of private and non-governmental agricultural services providers

are concerned, preference will be given to those who have the relevant experience, skills,

outreach, and mandate to work with local communities and smallholder farmer groups or

associations.

Sub-component 2.2: Linking Producers to Markets:

The objective of this sub-component is to support improved value chain development, though

support to SMEs and producer organizations to improve their productive capacity and

competitiveness and to develop market linkages. The subcomponent would facilitate farmers’

access to market by creating and supporting productive partnerships between farmers’

organizations with private agribusiness enterprises to foster the integration of a greater number

of smallholder producers in performing and remunerative value-chains, by developing and

implementing public-private alliances in the project areas aimed at improving market linkages.

Project support would be provided to some five (5) partnerships on a matching grant basis’ for

eligible expenditures including advisory services and training in support of farmer organizations

(and their members) and the respective agribusiness partner. Matching grants will be allocated on

the basis of a competitive selection process, utilizing transparent appraisal procedures

specifically designed and established under the project to result in the selection of commercially

viable partnership business plans. The terms and conditions of this matching grant facility will be

determined and agreed during the appraisal mission

Sub-component 2.3: Improving the agricultural investment climate and service delivery.

The sub-component would support policy dialogues with key stakeholders, especially the private

sector through public-private round tables so as to broaden and deepen agricultural the

commercialization agenda. The subcomponent would support MOA and GIEPA to organize the

participatory policy dialogues to review and improve the agribusiness regulatory environment,

institutional conditions and service delivery systems. These business forums would also

Page 13: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

5

contribute to the formulation of national agricultural competitiveness strategies, based on market

opportunities and comparative advantage.

Component 3: Project Administration and Institution Building--$2 million (of which IDA

Grant: $1.50 million).

The objective of this component is to develop and strengthen the overall implementation

capacity of the project coordination unit (PCU), while providing support to the MoA for the

overall coordination of the GNAIP. This component comprises the following four sub-

components: (a) Project management, (b) Impact monitoring and evaluation; (c) Project

communication; and (d) Support to Ministry of Agriculture (MOA) for the implementation of the

Gambia National Agricultural Investment Plan (GNAIP).

Sub-component 3.1:—Supporting Project Management, --$1million.

This subcomponent would: (i) finance the incremental expenses incurred by the Government in

implementing the project through the PCU and the participating field implementing agencies

and various service providers; (ii) provide technical assistance and training to enhance

implementation capacity of the PCU; and (iii) finance office equipment, vehicles, training, and

operating costs to ensure effective coordination and good project management at CPCU and

PCU levels, including safeguards, financial management and audits, reporting and supervision.

Sub-component 3.2: Impact Monitoring and Evaluation:

Under this sub-component, the project would support the establishment and operation of the

Monitoring and Evaluation (M&E) system under the project. This would include support to the

design and implementation of the various surveys and other tools for monitoring and evaluating

the progress of project implementation and the results of the project, including the level of

impact on intended beneficiaries. Technical assistance will be provided to participating technical

implementing agencies for improved monitoring arrangements.

Sub-component 3.3: Communication:

This sub-component will finance consultants and non-consultant services for the preparation and

implementation of a communications education program designed to enhance the quality of

participation of value chain participants and increase transparency and accountability in project

implementation. This support will include: (i) improved information dissemination campaigns at

all levels of government and in the communities to raise awareness and understanding of the

project objectives, approach and guidelines, implementation arrangements; and (ii) hands-on

training in communications education The implementation costs of this subcomponent will

include appropriate multimedia mobile vehicles, simplified posters, leaflets, radio/television

spots, and videos and DVDs.

Sub-component 3.4-- Support to MOA (for implementation of GNAIP)--$2+

Under this subcomponent, the project would provide support to: (i) improve agriculture and rural

development policy and strategy formulation and analysis at all levels of government as well as

to enhance national capacity to implement the Gambia National Agricultural Investment Plan

(GNAIP); and (ii) to streamline interagency coordination in delivering public services to the

rural sector. This support will enable the government, especially the sub-national governments,

Page 14: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

6

to establish the necessary preconditions for increased decentralization of rural development

administration. It is envisaged that, within the framework of the GNAIP, the Government will

establish a pathway for setting-up a Sector-wide Approach (SWAp) in agriculture.. The project

would finance the incremental operating costs for MOA to perform this coordination function.

1.2 Rationale for Preparation of a RPF

The project development objective of the GCVMP is to improve production systems and access

to market for targeted agricultural commodities for smallholders in rural Gambia. The

implementation of the project is expected to have a widespread positive impact on overall socio-

economic status and livelihoods of the target communities and the project-affected people

(PAPs). However, this needs to be done through appropriate environmental resources

management as the individual sub-projects that the GCVMP will finance carry some risks of

adverse environmental and social impacts. While the general impacts are addressed in the

Environmental and Social Management (ESMF), this framework addresses the risks, which

might arise if a sub-project requires for the economic or physical resettlement of populations.

Owing to the community-driven nature of the components of this project, the exact location,

nature and magnitude of sub-projects to be financed could not yet be determined. Therefore it is

at this stage neither possible to determine the demography and livelihoods of the PAPs nor the

resettlement related impoverishment risks they might face. This Resettlement Policy Framework

therefore provides guidelines on how the projects will avoid, manage or mitigate all/any project

related displacement risks. It is specifically to establish the resettlement and compensation

principles, organizational arrangements, and design criteria to be applied to meet the needs of the

people who own or use land or resources, which a subproject need to relocate or displace from

their current places of residence or livelihood in order to achieve the project’s objectives.

1.3 Objectives and Principles of the RPF

The objective of the RPF is to guide the preparation of RAPs that will ensure that, in the event of

any future resettlement, all PAPs will be compensated at replacement cost at market value, for

their losses, and provided with rehabilitation measures so that they are at least well off as they

would have been in the absence of the project. The principle is that involuntary resettlement

should be avoided where feasible, or minimized, exploring all viable alternatives in project

design. If unavoidable, resettlement activities should be conceived and executed as sustainable

development programs, providing sufficient investment resources to enable the persons displaced

by the project to share the benefits of the project. Displaced persons should be consulted and

involved in planning and implementing resettlement programs; and be assisted in their efforts to

improve their levels or to levels prevailing prior to the project implementation, whichever is

higher.

.

Page 15: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

7

1.4 Process for the preparation and approval of RAPs

Process for the preparation and Approval of RAPs is guided by notations described in Table 1

below:

Table1 : Categorization and Resettlement Planning Requirements

Category Number of PAPs Resettlement Impact requirement

A 200 or more

-physical displacement

-Loss of 10% or more of their

productive assets

Significant Full RAP

B <200 Minor Abbreviated RAP

C No loss of assets and incomes or

displacement

None No RAP

1.5 Extent and scope of Resettlement within the project

The initial consultations with communities and potential side visits in Central River and Western

Regions identified no immediate resettlement undertaking/impact in all the options of irrigation

and value addition and major type of impacts if any in some options later in the project might be

land, trees or crops. As such, final selection of proposed sub project options will be the scope of

information of actual resettlement impacts for this project and requirement of the compensation

and consultation adheres to the provisions of this RPF. The scope of this assignment is to prepare

the Resettlement Policy Framework (RPF) for the GCAVMP as specified in the TOR (Annex 2)

Page 16: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

8

2. Institutional and Legal Frameworks

2.1 Gambia institutional and legal framework

The Ministry for Lands and Regional Administration is responsible for the administration of

land in the Gambia, supported by two key technical departments- the Department of Lands and

Surveys which is responsible for the survey, mapping and demarcation of national and

international boundaries and government layouts and the Department of Physical Planning and

Housing is responsible for ensuring the rational and equitable use of the available land

resources. In addition to these two departments is the Land Commission which is provided for

in the Constitution

(Art. 192) The Commission, in co-ordination with relevant public agencies and government

institutions, manages lands vested in the state and provides advice to the Minister on land

matters. There are also reserved lands such as the Forest Parks and Protected Areas for wildlife

which are established by the state but administered by sectoral ministries. The Forestry Act 1998

and the Biodiversity Wildlife Act 2003, for example, vests the administration of the land in these

areas on the Minister for Forestry and the Environment. The legislations relating to land

administration in The Gambia were initially, the Provinces Lands Act and The Banjul and

Kombo St. Mary’s Act. However in 1990, The Banjul and Kombo St. Mary’s Act was repealed

resulting in the enactment of the State Lands Act in 1991 which is contained in Volume 8 of

The Laws of The Gambia. The State Lands Act now covers Banjul and Kombo St. Mary and the

whole of the Western Region. The State Lands Act covers compensation for a person/s when

land is being taken away from them for government developments. The Physical Planning and

Control Act and the Surveys Act were also enacted in 1991.

The main laws the govern land administration in the Gambia are two; that is the State Lands

Act 1991 and the Lands (Provinces) Act, CAP 103.

The State Lands Act 1991, Under this Act the administration of all state lands is vested in the

Minister for Local Government and Lands. The Act covers lands in the entire Kombo St. Mary

as well the districts of Kombo North, South and Central all in Western Region. All such lands

are to be administered by the State ‘for the use and common benefit, direct or indirect of the

community in which such land is situated. The Act provided for the establishment of Land

Administration Boards in 2007 in all the regions purposely to advise on the different aspects of

land administration such as; the acquisition and compensation of land for public purposes and

investigation of disputes on land ownership and occupation in designated areas. This Land

Administration Boards were later dissolved by the Lands Commission Act 2007 and transferred

functions of the board to the Lands Commission. The Act also has provision for leases and

mortgages.

The Lands (Provinces) Act Cap. 103 of the Laws of the Gambia vests all land in the Provinces

in the District Authority. Stated in article 4 “All Provinces’ lands are hereby declared to

be vested in the Authorities of the Districts in which such lands are situated, and shall be held

and administered for the use and common benefit, direct or indirect, of the communities

concerned.’ And article 5 states- ‘The occupation of Provinces’ lands by indigenes shall be

governed and regulated by the customary laws obtaining in the localities in which such lands are

Page 17: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

9

situated.” ‘Non-indigenes must obtain the consent of the District Authority in which the land is

situated The terms and conditions of such occupation must be stated in the lease and recorded in

the Land Register at the Office of the Governor. Section 24(1) of the Act empowers the Minister

to ‘acquire on behalf of the State, any Provinces’ land for any public purpose for a term of years,

paying such compensation or consideration or compensation and consideration as may be

agreed upon.’ This compensation will be in addition to the land rent. The District Authority

within which such land is situated may grant to the Minister, on behalf of the State, a lease of

such land for a term not exceeding twenty-one years. In the case of lease hold lands,

compensation is to be paid when the land is to be compulsorily acquired for public use. Where

the parties are unable to agree on the level compensation, the Act provides for a committee of

arbitration. The decision of the committee is final as provided in Sections 26 & 27

The physical planning and development control Act 19991Act provides for the establishment of

a Planning Board and Planning Authorities that are responsible for the development of national,

divisional and local plans. The Board advises the Minister on the formulation of general physical

development policy. The Planning Authorities are established in each of the administrative

regions including Banjul and Kombo St. Mary and they are also responsible for considering and

approving development permits for any land within its area of jurisdiction. On the subject of

acquisition of land for public purposes the Act makes provision under Section 36 for the

acquisition of such land by the Minister in accordance with the Land Acquisition and

Compensation Act 1991.

Other laws exist that also regulate land acquisition and resettlements includes, The Constitution

of the Republic of the Gambia 1997.which has provided for land acquisition and resettlement.

The relevant section is section 22 which protects from deprivation of property and provides as

thus:

(i)“No property of any description shall be taken possession of compulsorily, and no right over

or interest in any such of property shall be acquired compulsorily in any part of The Gambia,

except where the following conditions are satisfied”

(a) the taking of possession or acquisition is necessary in the interest of defense, public safety,

public order, public morality, public health, town and country planning, or the development or

utilisation of any property in such manner as to promote the public benefit; and

(b) the necessity therefore is such as to afford reasonable justification of the causing of any

hardship that may result to any person having any interest in or right over the property, and

(c) provision is made by law applicable to that taking of possession or acquisition- (i) for the

prompt payment of adequate compensation; and (ii) securing to any person having an interest in

or right over the property, a right of access to a court or other impartial and independent

authority for the determination of his or her interest or right, the legality of the taking of

possession or acquisition of the property, interest or right, and the amount of any to which he or

she is entitled, and for the purpose of obtaining prompt payment of that compensation”.

Section 22 sub section 4 further state “where a compulsory acquisition of land by or on behalf of

the Government involves the displacement of any inhabitant who occupy the land under

customary law, the Government shall resettle the displaced inhabitants on suitable alternative

land with due regard to their economic well being and social and cultural values” while

subsection 6 states . “Where any such property as is referred to in subsection (5) is not used in

the public interest or for the public purpose for which it was taken or acquired, the person who

Page 18: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

10

was the owner immediately before the compulsory taking or acquisition, as the case may be,

shall be given the first option of acquiring that property, in which event he or she shall be

required to refund the whole or such part of the compensation as may be agreed upon between

the parties thereto; and in the absence of any such agreement such amount as shall be

determined by the high Court”.

The Land Acquisition and Compensation Act 1991 also legitimizes the acquisition of property

by the state for public or planning Purpose which can be seen on sections 3,4 and 11

.In computerizing the compensation, the market value of the property is taken which means- the

best price at which an interest in property might reasonably be expected to be sold at the time of

valuation.

Land disputes with regards to ownership, compensation, demarcation are settled by the

arbitration and where that fails the supreme courts takes over.

Land tenure in the Gambia is a dual system which falls under three main categories:

(i). Customary;

(ii). Free hold and

(iii). Leasehold

The Customary form of tenure is mostly prevalent in the Provinces. The tenure is an interest or

title which a member of the larger community acquires in the communal land. It is an interest

which is held as of right by virtue of being a member of the community. The member who holds

such interest has the right of beneficial occupation, free use (subject to the laws of the country).

Upon death, the interest is transferred to his/her successors in title without any limits. this system

is the most relevant for the is project

The Free hold tenure has no term limit and is the highest form of land ownership. It is only

created by express grant from the Government. It is a form of tenure that confers absolute

ownership of the land. This form of tenure mostly exists in Banjul and some part of the greater

Banjul areas. It is a very rare form of ownership and almost does not exist in the provinces and .

The Lease hold tenure involves the execution of a lease between individual(s) and the

Government /District Authority for a period of twenty one years for Provincial lands and ninety

nine years in the state lands area. It is an interest in land for a specified period of time.

Foreigners can only acquire leases for twenty-one years. Various terms and conditions may be

imposed by the grantor including the payment of rent as consideration for the grant. The term for

business leases is dependent on the volume of investment.

2.2 World Bank Policies

The World Bank’s OP4.12 on Involuntary land acquisition and Resettlement, (Annex 1) is the

social safeguards policy that guides (land acquisition and involuntary resettlement) planning and

compliance during implementation of sub-projects. As sub-projects are identified and proposed

for financing both prior to and during the project implementation period, screening for potential

Page 19: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

11

land acquisition / involuntary resettlement will be conducted and the necessary mitigation and

management measures in keeping with the agreed RFP will be developed. In the event that a sub-

project resulting from the Bank-assisted investment projects to address direct economic and

social impacts entails land acquisition and are caused by the involuntary taking of land resulting

in the loss of livelihoods, the loss of shelter, loss of assets or access to assets or sources of

income, the loss of income and relocation, the Borrower must implement measures to ensure as

provided below

The OP 4.12 has the following aims to:

(i) Avoiding or minimizing involuntary resettlement wherever possible through

consideration of all viable alternative project designs.

(i) Instances where it is not feasible to avoid resettlement, resettlement activities should

be conceived and executed as sustainable development programs/activities, providing

sufficient investment resources to enable the individual/families displaced or

adversely affected by project activities to share equitably in project benefits. To this

end, displaced persons should be meaningfully consulted and should have

opportunities to participate in the planning and implementing sustainable resettlement

programs/activities.

(ii) Displaced persons should be informed about their options and rights pertaining to

resettlement

(iii) Displaced persons should be assisted in their efforts to improve their livelihoods and

standards of living, or at least to restore them, in real terms, to pre-displacement

levels or to levels prevailing prior to the beginning of project implementation,

whichever is higher

(iv) Provided prompt and effective compensation at full replacement cost for losses of

assets attributable directly to the project. “Full replacement cost” is the method of

valuation of assets that helps determine the amount sufficient to replace lost assets

and cover transaction costs. In applying this method of valuation, depreciation of

structure and assets should not be taken into account. For losses that cannot easily be

valued or compensated for in monetary terms (e.g. access to public services,

customers and supplies; or to fishing grazing or forest areas), attempts are made to

establish access to equivalent and culturally acceptable resources and earning

opportunities. Should the laws of The Gambia not meet the World Bank’s standards

of compensation for full replacement cost, then compensation under domestic law

would be supplemented by additional measures necessary to meet the replacement

cost standard, as per the requirements of World Bank Operational Policy 4.12. Such

additional assistance is distinct from resettlement assistance to be provided.

(v) Displaced persons should be assisted with relocation and supported during the

transition period

(vi) Particular attention should be paid to vulnerable groups (children, women, elderly,

chronically ill, persons with disabilities, widows);

(vii) There will be adequate measures for monitoring and evaluation of the Resettlement

(viii) The Resettlement Policy Framework will form part of the overall GCAVMP’s

operations Manual and is reference in the project contract agreements.

.

Page 20: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

12

2.3 Comparison of the Gambia Legal Framework and WB Policies

The World Bank Operational Policy adequately provides for project affected Persons (PAPs)

who are either displaced or suffer other losses, as a result of the Bank funded development

activities/ projects. The bank places high premium on preserving the livelihoods of persons to be

affected, but in cases where this is inevitable, the Bank endeavors to minimize displacement as

much as possible. In instances where displacement is unavoidable, compensation should be paid

to PAPs to help them to restore their social, economic and environmental livelihoods.

The Gambian laws as well make revisions for land acquisition and compensation. A comparison

is detailed in table 2 below. Where there is a difference between World Bank policy and The

Gambia’s law, the former will prevail.

Table 2: Comparison of National laws with World Bank Safeguard Policies

Legislation of The

Republic of The

Gambia

WB Involuntary

Resettlement Policy

Conclusion on

Gaps

Actions to address

gaps

1. Eligibility

Law provides for Persons

who suffer any losses and

can produce any form of

title that is legal in the

form of deeds,

leaseholds, or customary

People impacted by:

-Involuntary taking of

land

-Loss of shelter,

assets, income sources

or livelihood

-Involuntary

restriction of access to

protected areas

resulting in adverse

impacts on livelihood

Policy expects all

forms of losses

without exception to

be catered for

In instances where a

Sub project affect

squatters they are

not likely to be

compensated

Both the Republic of

the Gambia and The

WB commits itself

to abide by all the

provisions in the

involuntary

resettlement policy

by signing the credit

agreement for the

GCAVMP project.

Meaning even those

PAPs that have no

form documentation

shall be

compensated in

accordance with the

RPF.

2. Entitlements

Fair and adequate Full replacement cost In instances where a

Sub project affect

squatters they are

not likely to be

compensated

As above the

agreement should

include all PAPs

regardless of status

and special

provisions/assistance

for vulnerable

persons

Page 21: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

13

3. Information

requirements

Laws are not explicit/

silent on consultations

Under the Gambia law, it

is preserve for the

minister to assess loss

due to the resettlement

either through the

Department of Lands&

Surveys or through

consultants

The owner/tenants on the

land must be formally

notified at least a week in

advance of the intent to

enter, and be given at

least 24 hours notice

before actual entry.

Meaningful

involvement of

affected persons,

communities, local

authorities, NGOs, all

stake holders to

ensure that the project

enjoys the full support

of the Bank and

affected persons.

Policy advice that

project affected

persons be assisted

during their transition

period in the

resettlement site and

efforts made to restore

their livelihoods

consultations on

eligibility criteria for

compensation and

assistance; Displaced

persons

& their communities

and host

communities –

participate in

planning,

implementing and

monitoring

resettlement;

Displaced persons and

their

communities are

provided timely and

relevant information,

consulted on

resettlement options,

and offered

opportunities to

participate in

planning,

Communities might

not be fully

informed or have

full access to the

RAP

As part of the

agreement should be

a clause on full

participation of

communities and

processes of

involving them

Page 22: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

14

implementation and

monitoring of

resettlement

2.3 Conclusions: Bridging the Gaps

From the point of view of the process of land acquisition and compensation, it is clear that the

calculations for compensation, consultation and information sharing is mainly the prerogative of

the Minister. This is likely to be significantly more time consuming and more difficult in the

event that resettlement issues arise in a significant number of subprojects. Therefore, it is will be

necessary to streamline the compensation review process and engage more community people

particularly that the project will be operating in areas where the land provinces act prevails and

administration of such lands is vested in the district authorities. This will help to ensure that

approval timelines are consistent with those required by the Bank for timely sub-project approval

and implementation. It is therefore being suggested that the PCU develops and agrees with the

Minister of Lands, a valuation and compensation procedure that allows the delegation of

authority and decision making to the local – district level in the case of sub-projects that have

minimal resettlement impact.

The law does not provide for rehabilitation and in practice this has been left to ad hoc

arrangements taken by project proponents in order to meet international donor requirements. To

clarify these issues and reconcile eventual gaps between the national law and WB Policy, this

RPF has been drafted for the Project, ensuring compensation at replacement cost of all items, the

rehabilitation of non titled people and informal settlers, and the provision of subsidies or

allowances for PAPs that may be relocated, suffer business losses, or may be severely affected.

Page 23: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

15

3. Eligibility and Entitlements

3.1 Eligibility

3.1.1 Eligible Individuals. According to the World Bank Safeguard Policy, eligible individual(s)

are those who are directly affected socially and or economically through the project funded sub-

projects caused by

(i) The involuntary taking of land and other assets resulting in, relocation or loss of shelter,

loss of assets or access to assets, loss of income sources or means of livelihood whether

or not the affected persons must move to another location and

(ii) The involuntary denial of access to a designated social and economic services, such as

football fields, market, recreation centers

3.1.2 Cut–Off Date. The cut-off date for eligibility will be set as the date when the PCU

completes the census survey of people occupying the land needed for the project and the

inventory of their assets including infrastructure, houses, wells, animal drinking points, small

ruminants, communal/social places for example “bantaba” and all the affected people have been

duly informed of their dues. The cut-date will be communicated among the public and PAPs

through various means of communication. A cut-off date is required to prevent opportunists

rushing to settle on the project needed land and causing additional unplanned burden/risk on sub-

project.

3.2.3 Compensation Procedure

Formation of the Compensation Committee A committee will be formed to be charged with

the affairs of resentment. This will include the staff from the PCU, ministry of Lands, department

of physical planning, AG’s chambers, VDC member, district chief, Alkalo, Kabilo Head and a

woman leader.

Public Participation with the PAPs This will initiate the compensation process as part of an

ongoing process that have started at a stage when the project designs are being developed. This

process therefore seeks to get the involvement of PAPs in a participatory approach with the

project, from the beginning.

Notification of land resource holders – The district authority concern and resettlement

committee who would also been involved in identifying the land will notify the land owners

/users, about the established cut-off date and its significance. The user(s) will be informed

through both a formal notification in writing and also by verbal notification in the presence of

District chief, Alkalo, VDC members and Kabilo Heads, as many of the potential PAPs are

illiterate.

Documentation of Holdings and Assets – The resettlement committee will arrange meetings

with affected individuals to discuss the compensation process. For each individual or household

affected, officials of the Compensation Committee completes a compensation file containing the

necessary personal information on the affected party and those that he/she claims as household

members, total land holdings, inventory of assets affected, and information for monitoring their

future situation. This information is confirmed and witnessed by other family and or community

Page 24: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

16

members. The file will be kept current and will include documentation of lands surrendered. This

is necessary because it is one way in which an individual can be monitored over time. All claims

and assets will be documented in writing.

Agreement on Compensation and Preparation of Contracts – All types of compensation are

to be clearly explained to the individuals/ groups or households involved. The respective

Compensation Committees will then draw up a contract listing all property and land being

surrendered, and the types of compensation (cash and/or in-kind/assistance) selected. The type of

compensation will be an individual choice. An individual/group that selects in-kind

compensation has to fill an order form which is signed and witnessed. The compensation

contract and the grievance redress mechanisms are read aloud in the presence of the affected

persons concerned or their representatives and members Compensation Committee (CC) and to

signing.

Compensation Payments – All handing over of property such as land and buildings and

compensation payments will be made in the presence of the affected persons and or their

representatives and the members of the RC. Tables 3&4 describe the forms of Compensation

and compensation package by type of asset lost and ownership rights respectively. Compensation

payment will be based on the market value and this will have been arrived at

either on:

- by Direct Comparison Valuation Technique

Cost Approach.

Table 3 Forms of compensation

Cash Payments Compensation will be calculated in GMD.

Rates will be adjusted in accordance with

inflation

In-kind Compensation Compensation may include items such as land,

houses, other buildings, building materials,

seeds, seedlings, fertilizer, other inputs and

financial credits for equipment

Assistance Assistance may include moving allowance,

transportation and labor

3.2 Entitlements

During preparation of the RAP precise identification of PAPs adversely affected by project

activities will be undertaken and losses of assets and livelihoods carefully assessed. Adetailed

Entitlement Matrix for these PAPs will be prepared. (See Table 4 below ) sample entitlement

and compensation matrix. The matrix provides identification and appropriate and fair

mitigations for various types and levels of asset and livelihood losses. Compensation will be

estimated drawing on established national guidelines, market valuations of property and

structures; values of productive assets including land, agricultural produce, productive trees,

businesses, dwellings, livestock pens, etc.

Page 25: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

17

Table 4: Matrix of entitlement and Compensation Packages by Type of Asset Lost and

Ownership Right

Asset Loss Specification RIGHT/PERSON

DISPLACED

COMPENSATION

ENTITLEMENT

Land All land

irrespective of

impact severity

Owner-Formal or

customary title

Land for land

compensation through

provision of plots of

comparable value

and location as the lost

asset, including

transitional support.

The replacement land

should be a similar size and

have similar characteristics

(soil, water) for agriculture

as the original piece of

land.

Renter or Lease holder

Cash compensation value

for rent proportionate to the

duration of the remaining

lease period

Encroacher /Squatter Assistance

to locate to replacement

plot where the

encroacher/squatter may

legally reside.

Allowance covering one

year of agricultural income;

or provision of a

replacement plot in a public

resettlement area and with

the legal status (owned or

leased) of that lost by the

encroacher/squatter

House or Business

Premise

(including all

infrastructure such

as wells, fences,

outdoor

kitchens, chicken

coops and the

like)

Owner Replace with house of at

minimum, same size and

infrastructure

Renter Reimburse any advance

rental

payments;

Provide assistance to

locate new rental property

at same rental rate and

quality of house;

Page 26: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

18

Provide at least 6 months

rent for vulnerable persons

and 3 months for persons

with no special needs as

disturbance fee

Squatter Provide assistance to locate

new

rental property;

Provide at least

three months rent (as

disturbance fee);

Assistance to

acquire house plot is

recommended

Business Owner Compensate monthly

profits

foregone during period of

relocation;

Pay employee salaries

during

period of relocation;

Renter Compensate profits and

employees for wages .as

above, plus assistance to

acquire new

locale (as for all renters)

Crops Affected crops Farmer/Owner,

cultivator of crops

Compensate for lost

production (yield) at price

between harvests

Trees and fruit trees All affected

trees

Owner/Owner Provide seedlings as

replacement;

Compensate for value of

fruit clump lost

until seedlings come into

production;

Community

Assets

Rehabilitation/substitution

or cash

compensation at full

replacement cost of

the affected structures and

utilities.

Unidentified

Losses

Unanticipated

Impacts

All Displaced Persons Dealt with as appropriate

during subproject

implementation in

accordance with the World

Bank’s Operational Policy

Page 27: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

19

4.12

3.3 Valuing Affected Assets

This sets out the detailed requirements for determining the value of affected assets.

Valuation Procedure to be followed

1. Use of Standard Valuation Tables It is anticipated that a number of small-scale asset

valuations will need to be carried out in the rare even of land acquisition and involuntary

resettlement during the course of the project. Therefore one valuation method or expert would

not be insufficient to evaluate each and every case. It is therefore recommended that an

evaluation expert/firm be contracted by the PCU at the project outset to develop a standardised

procedure for asset valuation, which can then be applied by the project team at the local level.

This standardized procedure would include a series of ‘look-up’ tables for estimating asset value

by type according to the approximate size and condition of the existing asset. The tables would

necessarily be developed using legally acceptable valuation procedures accepted by both the

Gambia Government and World Bank for purposes of fairness and consistency. The approach

will consider replacement costs and types and levels of compensation under the law, and

valuation of lost assets will be made at their replacement cost and different calculation methods

will to be adopted for the different types of assets as outline in Table 4.

2. Preparation of Asset Inventory A field visit would be carried out by a team to the affected

area to carry out an asset valuation survey in order to prepare an inventory of assets for a sub-

project. The team will be led by a representative from the PCU, and will include a representative

of the PAPs, a representative of the ministry of local government and lands, physical planning,

district Chief, a VDC member- essentially Compensation Committee. During the survey, each

asset will be enumerated and inscribed on an inventory and a valuation of the asset carried out

using the approach described above. The values of each asset will then be recorded in a register

and shown to the affected person for agreement. The register will be signed and a copy given to

the affected persons. The document will define when the PAP will be notified, and that the asset

inventory they have signed will not be official until a second signed copy, verified by project

coordinating team before it is returned to the affected person. A copy of the grievance procedure

will also be given to the affected person as required by the banks policy. Annex 3 includes the

land asset and physical inventory survey form.

Valuation Methods to be Adopted

1 Replacement Cost method/Approach. The replacement cost method is based on the premise

that the costs of replacing productive assets is based on damages caused by project operations.

These costs are taken as a minimum estimate of the value of measures that will reduce the

damage or improve on on-site management practices and thereby prevent damage. The approach

involves direct replacement of confiscated assets and covers an amount that is sufficient for asset

replacement, moving expenses and other transaction costs.

Page 28: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

20

2 Gross Current Replacement Cost method. Gross Current Replacement Cost (GCRC) is the

estimated cost of erecting a new building having the same gross external area as that of the

existing one, with the same site works and services and on a similar piece of land.

3 Comparative Sales Method is a method of estimating the value of an asset by comparing it to

the values assessed by the market for similar or comparable assets. The process consists of

identifying comparable assets (the peer group) and obtaining market values for these assets.

converting these market values into standardized values relative to a key statistic, since the

absolute prices cannot be compared and this process of standardizing creates valuation multiples

and applying the valuation multiple to the key statistic of the asset being valued, controlling for

any differences between asset and the peer group that might affect the multiple.

4 Other methods such as Rates from Contractors, when rate schedules do not exist or are out

of date, recent quotations by contractors for similar types of construction in the vicinity of the

project can be used for calculating replacement costs. In projects offering the options of cash

compensation or alternative accommodation, the construction cost estimates for alternative

accommodation could be used for calculating cash compensation payable.

The methods for valuation for the various losses are presented in Table 5 below

Table 5 Methods of Valuation

TYPE OF LOSS METHOD OF

VALUATION

BASIS OF VALUE

Loss of Land Comparative Sales Method Based on the open market

value of comparable recent

land transaction

Loss of Buildings and Other

Civil Works

Replacement Cost Method

or Comparative Sales

Method, gross replacement

cost methods

Full replacement cost

value as if new – recent

construction cost rates and

market values for structures,

assets and materials

Loss of Trees, Perennial

Crops, Food Crops

Comparative Sales Method/

Replacement Cost Method

Based on going market

Rates

Loss of Business Income and

Loss of Business Goodwill

Comparative Method Based on the average

monthly net profit

-Loss of Forest Trees / Comparative Sales

Method/Replacement Cost

Method

Based on stumpage fee

Loss of Wages

- Loss of Fees from

Apprentice Loss of Job

Training

Comparative Method Based on Going Fees and

Wages

Expenditure all transportation-

related to transfer

Comparative Method,/ other

methods

Based on truck/transport

hiring charges

Page 29: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

21

Page 30: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

22

4. RAP Information Requirement

4.1 Census and Inventory of Project Affected Persons (PAPs)

In order to prepare an inventory of all PAPs, a field team would visit the affected area to carry

out a survey. The team would be led by an appropriate person from the PCU and other members

of the Compensation committee including the people from the local authorities and

representative of the PAPs. During the survey, all the PAPs and asset will be enumerated and

inscribed on an inventory. Sample survey form is provided in Annex 4

4.2 Identification of losses

It is important to underscore that at this stage it is not possible to determine the exact number of

PAPs because the individual subprojects of the project components 1 and 3 will be identified

during project implementation by the local communities in a participatory process. For that

reason, the locations, nature and magnitude of these subprojects cannot be determined before

implementation. For each sub-project which might require physical and/or economic

resettlement, land acquisition leading to involuntary resettlement and/or restrictions of access to

resources or livelihoods will be assessed through screening processes and the number of PAPs

will be established through a RAP, which will be elaborated before project implementation.

Category of affected people

In line with the World Bank Safeguard policy on involuntary resettlement O.P. 4.12 and the laws

of the Gambia, the following categories will be used to define affected individual/s or group/s

(i) People who have formal legal rights recognized under the laws of The Gambia.

(ii) People who do not have formal legal rights to land at the time of conducting the

census, but have a claim to such land or assets provided that such claims are

recognized under the laws of the Republic of The Gambia.

(iii) People without any recognized legal rights or claims to land they are occupying.

Those covered under the first two categories above will be provided compensation for the land

they lose and other assistance in accordance with the policy. Persons categorized under the last

and third category will be provided with resettlement assistance in lieu of compensation for the

land they occupy, and other assistance, as and when necessary, to achieve the objectives set out

in this policy, if they occupy the project needed land prior to a cut-off date established by the

PCU in close consultation with the potential Project Affected Persons (PAPs) and the local

officials and acceptable to the Bank. Persons who encroach on the area after the cut-off date are

not entitled to compensation or any other form of resettlement assistance.

All categories of persons defined above are to be provided with compensation for loss of assets

other than land.

Assistance to Affected Groups/ Individuals:

Assistance to affected individual(s) may include the following:

(i) Identification of affected individual(s) and identification of the cause and impacts of their

losses, through one on one interviews.

(ii) Identification of required assistance at the various stages of the process, negotiation,

compensation and relocation

Page 31: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

23

(iii) Implementation of the measures necessary to assist the affected individual(s)

(iv) Monitoring and continuation of assistance after resettlement and or compensation, if

Required

Assistance to Vulnerable People:

Serious attention should be paid to vulnerable people or people with specials needs to ensure

compliance with the bank’s policy with regard to vulnerable people. Vulnerable people include

orphans, children, the aged, people with chronic illnesses, pregnant women, single parents, and

people with disabilities

4.3 Baseline Survey

An important aspect of preparing a RAP is to establish the socio- economic baseline data through

a survey to identify the persons who will be displaced by the individual subproject, to determine

who will be eligible for compensation and assistance, and to discourage inflow of people who are

ineligible for these benefits. The census provides a baseline and consolidates information that

(i) Provides initial information on the scale of resettlement to be undertaken

(ii) Gives an indication of further socioeconomic research needed to quantify losses to be

compensated and, if required, to design appropriate development interventions; and

(iii) Establishes indicators that can/be measured at a later date during monitoring and

evaluation.

A Sample census survey form is provided in (Annex 4).

Baseline data for subproject RAPs will include: number of persons; number, type, and area of

the houses to be affected; number, category and area of residential plots and agricultural land to

be affected; and productive assets to be affected as a percentage of total productive assets

Page 32: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

24

5. Implementation Arrangements

5.1 RAP Development and Approval process

A resettlement Action plan is needed to operationalise the framework and below are the steps to

follow:

1. Identification and preparation During the identification and preparation stage, an

Environmental and Social Screening Checklist (ESSC) (Annex 5) will be completed to

determine, whether or not, a particular sub-project(s) will acquire land and critically analysis all

the issues for any meaningful resettlement undertaking. The ESSC is designed to inform the

PCU about critical issues and to make available critical information to reviewers/evaluators for

informed decision making about the corresponding mitigation measures. It will also provide the

basis for further analysis and tracking of compliance with national legislation provisions and the

Bank’s safeguard policies and procedures at an early stage.

2 Preparation of a Resettlement Action Plan. When the initial screening suggest that there will

be land acquisition and therefore involuntary resettlement as defined under this policy, the PCU

will be required to develop a Resettlement Plan which will entail the following activities:

Baseline Survey Preparation of the resettlement plan will entail doing a baseline survey

consisting of a Census of all affected persons and assets and a socio-economic survey of the

conditions of the affected persons. The census would identify potentially affected individuals,

households and vulnerable groups (children, the elderly, female headed households, widows,

widowers, people with disabilities etc). The socio-economic study will collect baseline socio-

economic data of the potentially affected populations/communities within the project targeted

areas. The socio-economic assessment would focus on identification of stakeholders

(demographic data), the participation process, identification of affected people and impact on

their property, their production systems, the institutional analysis and the system for monitoring

and evaluation. Detailed calculation of household economies and identification of all impacts

will be done in the socio-economic assessment to determine potential compensation process. The

survey should be done by the PCU or could be sub Contracted to a competent person or firm.

Development of a Resettlement Action Plan (RAP). The resettlement action plan will include:

Description of the project sub-component, potential impacts, relevant findings of the baseline

survey, legal framework, institutional framework, eligibility, valuation of and compensation of

losses indicating whether compensation is in-kind or cash for each loss, the unit compensation

rates and overall cost for monetary compensation, including transport, administrative,

procurements, hiring and other costs as may be required. RAP will also describe the grievance

procedures, resettlement measures, community participation, institutional responsibilities,

economic rehabilitation measures required, implementation schedule, costs, the budget and the

sources of funding and last but not least RAP will also describe monitoring and evaluation and a

timetable for resettlement and sub-project activities.

Screening and Appraisal The screening will be carried out by the relevant Government

Agency or an independent competent agency/individual and submitted to the PCU for approval

or otherwise. The process will identify and assess potential impacts for the proposed project

Sub-component and determine whether land is required and whether displacement or loss of

Page 33: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

25

access and/or property is likely to occur, examine whether the involuntary resettlement policy

will be activated or not; examine whether the RAP is adequate and can be implemented, review

the environmental and social impacts assessment

5.2 RAP implementation Process

Implementation of the RAP is given precedence over the implementation of the GCAVMP. This

is in line with WB’s policies to make sure resettlement takes place before any project investment

to ensure that displacement or restriction of access does not occur before the necessary measures

for resettlement are in place. The PCU through the compensation committee will ensure that

compensation is effected in line with the National Legislation and World Bank Safeguard Policy

on Involuntary Resettlement.

Institutional Arrangements:

The Ministry of Agriculture (MOA) is given the overall coordination of the RAP. A PCU will

be established under the MOA to take up the day to day coordination responsibilities. The PCU

will be responsible of approving all sub project activities to be completed under this project.

Prior to any sub project, the subcontractor will conduct screening to assess whether it entails land

acquisition or not and findings/report sent to the PIU and then incorporate the findings into the

final approval document and submit for review by the Project Manager. This process will lead to

sub project RAP if needed and shall also form part of the approval package. The PCU will be

responsible for ensuring overall adherence to the RPF. It is recommended that a focal person be

identified within the PCU to provide oversight on the RPF. As part of efforts to meet the required

capacity to implement the RPF, training on the application of the RPF should be conducted to

respond to the unlikely event when this project is to acquire private land.

The National Environment Agency (NEA), established by an act of parliament is charged with

the responsibility for environmental management in The Gambia. The NEA sets standards and

guidelines relating to environmental protection and/or pollution. It may by notice in writing

direct any developer carrying on any project to submit an Environmental Impact Assessment

(EIA) covering the project. The Environmental Assessment Regulation 1999 has listed the

developments that require clearance with the NEA before implementation can start. Agricultural

development projects are one of those required the issuance of environmental clearance. The

NEA will be responsible for screening and appraising the RAP as well as monitoring and

evaluating the resettlement/rehabilitation process.

The Ministry Lands and Regional Integration is the agency mandated by law to take charge

of land administration in the country including land acquisition, and valuation of losses due to

compulsory acquisition and compensation. The customary land tenure also falls under the MLRI

and this project will be implemented under the CRR and NBR where the Land (provinces) act

applies and the WCR where the State Lands Act mostly applies. Therefore the chiefs, Alkalolos,

Clan Heads or “Kabilo” VDCs will be consulted and participate in the planning, implementation

and monitoring of the land acquisition and resettlement undertakings as they are the land

administrative structures/mechanisms in the provinces. This structures however, to large extend,

excludes women and youths as customary land administration is discriminatory against women

and youths. The structures will be used to prevent or arbitrate and resolve disputes and conflicts

that may arise as a result of involuntary resettlement.

Page 34: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

26

The Lands Commission established under the Lands Commission Act 2007 and charged with

the primary responsibility of advising the Minister on policy matters relating to land

administration. Other responsibilities include the investigation of land ownership and occupation

disputes in all parts of the Gambia.

The Department of Lands and Surveys is responsible by law for the survey, mapping and

demarcation of national and international boundaries and government layouts. The Department is

by law responsible for the processing of compensation claims on compulsory acquisitions and

for this purpose performs, for the government, valuation of various properties for specified

purposes.

The Department of Physical Planning& Housing will be responsible to ensure that land

acquired for the project or for resettlement on a reserve land and also to ensure maximal use of

land. It will be responsible approving housing design proposed for resettlement

The Ministry of Finance the Ministry of Finance and Economic Affairs is the agency that

manages the central government’s budget. The Finance Ministry is responsible for releasing

money through the central bank for the compensation of persons affected by compulsory land

acquisition.

The Attorney General’s Chambers is a mechanism for redress incase of any grievances that

are not arbitrated/resolved at district level. Persons who are not satisfied with compensation due

them are empowered by the Constitution to seek redress in the court of law. The AG’s Chambers

represents the government in the court’s proceedings in such instances. The AG’s Chambers is

also responsible for drafting the Executive Instrument for acquiring the land as needed for the

projects.

The National Agency for Legal Aid (NALA) the NALA is the dedicated administrator of legal

aid in The Gambia created in 2008. The agency is responsible for receiving and reviewing legal

aid applications, ensuring that those who cannot afford the services of lawyers get legal

representation at no charge (Institute for Human Rights and Development in Africa (IHRDA,

2012). In instance where a person is not satisfied with compensation due him/her and cannot

afford the cost of a lawyer in a court of law, is empowered by the Legal aid act (2008) to apply

for legal aid and get representation at no charges.

None Governmental Organization (NGOs) the NGOs will take part in monitoring the

implementation of the resettlement activities and those with expertise and mandate on budget

tracking will track the project budget. They will also conduct researched and PAPs satisfaction.

Grievances Redress Mechanisms. A grievance response mechanism is necessary for the project to address genuine individual and

or collective concerns. The grievances redress mechanism is a proactive and reassuring measure

to those who may consider themselves deprived of just treatment under the project.

Page 35: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

27

The Bank’s OP 4.12 on Involuntary Land Acquisition and Resettlement (Annex 6) requires that

affordable and accessible procedures for third party settlement of disputes arising from

resettlement (i.e., grievance redress mechanisms) be made available. This Grievance Redress

Mechanism (GRM) should take into account the availability of judicial recourse as well as

traditional and community dispute resolution mechanisms.

The mechanism will be developed by the Project Coordination Unit (PCU) and would look at:

Potential Sources of Grievance/Disputes

The potential grievances and disputes may be related to:

(i) Inventory mistakes made during census survey as well as inadequate valuation of properties.

(ii) Disagreements on plot/asset valuation

(iii) Mistakes related to identification and disagreements on boundaries between affected

individual(s) and specifying their land parcels and associated development.

(iv) Family/community issues resulting into ownership dispute

(v) Inheritance issues resulting to ownership issues

(vi) Land acquired by more than one person, both of whom have some forms of documentation

to prove ownership

(vi)Where affected individual(s) are not in agreement/happy with the compensation and

resettlement operations

Proposed Grievance Management and Redress Mechanism

In response to grievance, the following mechanisms will be used

Administrative Mechanism: The RAP will outline procedures to handle grievances. As an

initial step the person affected report his/her grievances to the District Authority which is

responsible for land administration at the provincial level. If the matter cannot be resolved at that

level then a formal report could be made to the PCU by the Person concern or his/her

representative. The PCU shall immediately

(a) Receive and register/record the complaints,

(b) Verification of complaints

(c) Open a case file

(d) Creating various forms of documenting grievances such as verbal, writing,

photographic, audio visual means of lodging and recording complaints

(e) Designate a focal point/committee responsible to deal with grievances

(f) Establishing grievances referral systems and levels

(g) Putting in place time frame to address the documented grievances.

(h) Monitoring and evaluation of the grievance response mechanism- frequencies,

indicators, responsibilities, costs,

A grievances committee will be formed that include at least three people from the PCU

including the project manager and financial controller, one legal person, one person from the

NGO sector, one lands administrative expert and a representative of PAP. The committee will be

chaired by the project manager who will receive and record all complaints with assistance from a

personnel manager/sectretary and then sermon meetings and make consultation as much as

necessary with relevant entity/ies find an agreement acceptable to the PAP. However, if the PAP

Page 36: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

28

is not in agreement with the solution provided at this level. The next level of seeking redress is

the law court.

The Law Courts The Supreme Court is the highest level of appeal and therefore its decision in

resolving grievances is final within the Gambia. Rulings at Supreme Court level is rarely

invoked as most of the affected people are generally satisfied with the administrative responses.

In some cases the PAP are able to negotiate for acceptable awards

5.3 Supervision and Monitoring

The objective of supervision and monitoring is to make assure compliance with national law and

WB OP4.12, to identify and correct issues/problems as early as possible so that implementation

arrangements if any can be adjusted and improved without delays. Resettlement impacts affects

people’s lives directly, and since poor implementation can result in project delays, developing a

practical monitoring system is essential for the success of the project. The monitoring system

envisaged under this project will primarily involve the systematic use of information to

determine the extent to which plans are being implemented effectively. This will involve regular

file visits/checks and reporting within the project. The institutional arrangements,

for monitoring are that PIU will bear the overall responsibility whereas the RC which includes

representative of PAPs will do the day to checks, observations and regular reporting. The Bank

will be involved in monitoring through project supervision and reports coming to the Bank. The

Bank will also be engaged in spot checks and verification of data as and when necessary. The

elements of the monitoring system will include data gathering affecting RAP implementation

including on:

(i) Procurement and physical good deliver

(ii). Use of structures and services by the community

(iii) Measurement of output indicators such as productivity gains etc. The sources of information

could include but is not limited to internal, monthly or quarterly program and financial reporting;

diagnostic studies and other special studies; contact and interviews with project affected people.

Process Parameters for Monitoring:

-Proper documentation and record keeping,

- Efficient and timely delivery of RAP provisions to PAPs,

- Monitoring the consultation process,

- including ensuring that sex disaggregated data is provided,

-The announcements should be arranged in two official newspapers and on public areas

-Announcement of land acquisition plans by the proposed project, in particular announcing such

plans for plots which their owners could not be either identified or contacted,

-Number of consultation activities accomplish and those not carried out, variance explanations, -

-Disclosure of RAP grievance procedures and contact details

-Availability of the RAP implementation to respond to PAPs grievances

-Accidental and/or planned damages and impacts to properties and assets caused by the

construction activities including those not accounted for in the RAP

-Level of coordination and collaboration with respective governmental and nongovernmental

Organizations including CC meetings

-Presence and participation of the PAPs in meetings and negotiations related to RAP

-Grievances handling, recording and reporting and timeliness of response

Page 37: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

29

Results parameters

-Number of PAPs consulted disaggregated by agreements ratification status, type of involuntary

resettlement, consultation date and sex (male/female)

-Number of PAPs who received their compensations and who were subject to RAP measures

-Timely advancement of compensations

- Number and details of grievances by respective PAPs disaggregated by grievance

category, date receiving, package area and gender.

-Number of grievances filed at court, and court decision and cost implications or court decision

on the PAP or Project ,

-Number of resolutions of redress grievances and if timely resolved

-level of Compliance with the RAP implementation time schedule (low, medium or high) levels

to be find later

- Financial variance between reached agreements with PAPs and the estimated budget for

-RAP implementation reported for the whole RAP, and disaggregated on case-by-case

Basis

External monitoring will be carried out by the National Environment Agency (NEA). NGOs,

that might be contracted and the World Bank supervision missions.

Evaluation An evaluation will be done to determine whether the efforts to restore the livelihoods

and living standards of the PAPs have been properly designed and executed. The evaluation will

generally assess compliance with the provisions of RAP and law and policies the country and the

Bank. It will assess accountability commitments such as consultation procedures, fair, adequate

and prompt compensation, the impact of the compensation on income and standard of living, best

practices and lessons learnt. Table 6 below describe the M &E Indicators for RAP

Table 6 Verifiable indicators

MONITORING EVALUATION

Number of outstanding compensation or

resettlement contracts not completed before

next agricultural season

Number of outstanding individual

compensation or resettlement contracts

Number of communities/subprojects unable to

access village-level compensation after two

years.

Number of outstanding village

compensation contracts.

Number of Grievances recognized as

legitimate out of all complaints lodged

All legitimate grievances rectified

Pre- project production and income (year

before land used) versus present production

and income of re-settlers, off-farm-income

trainees, and users of improved mining or

agricultural techniques

Affected individuals and/or households

compensated or resettled in first year who

have maintained their previous standard of

living at final evaluation

Pre- project production versus present

production (crop for crop, land for land).

Equal or improved production per

household.

Pre-project income of vulnerable

individuals identified versus present

income of vulnerable groups

Higher post- project income of vulnerable

individuals.

Page 38: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

30

6. Public participation and consultation

Consultations on the Preparatory Processes

The documents on the resettlement process has been discussed at the preparatory stage during the

community consultation and validation workshop (see annex 7) for the views of the stakeholders

and once the documents are finalized they will be made available to the general public to ensure

as wide publicity as possible.

Consultations on the Resettlement Policy Framework

As provided under World Bank policy OP. 4.12 information and consultation on the GCVMP

Resettlement Policy Framework shall be organized as follows:

(i) Organize a validation workshop for all relevant stakeholders for comments which was done

(ii) Share with the World Bank for comments

(iii) Incorporation of stakeholders and World Bank comments

Consultation on the Resettlement Action Plan (RAP)

Consultation with the public on the entire process of resettlement is essential as it offers

the affected persons an opportunity to participate and contribute to both design and

implementation of the project activities. Public participatory consultation will be done through

stakeholders’ meetings and workshop at suitable locations such at the “bantaba”, and the official

residence or offices of the local leaders. The information will be made to each household on

entitlement eligibility criteria, modes of compensation complaints and grievances resolution

procedures.

Disclosure Requirements

The document for the Resettlement Action Plan when completed will be widely disclosed.

Methods for the disclosure of the document will include:

(i) Distribution of as many copies as possible to different institutions and communities for

comments and suggestions.

(ii) Distribution to individuals and representative persons like Members of the National

Assembly (NAMs), Regional Governors, Village Councilors, Village Development Committee

members etc.

(iii) Conducting meetings to discussion the plan. The meetings will be conducted at the places

where the resettlement will take place.

(iv) An executive summary of the RPF and of any RAP will be made available in the local

languages.

(v) The Government will also authorize dissemination of this document through the World

Bank’s Info- Shop.

Page 39: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

31

7. Costs and Budgets

Resettlement activities in will be the sole responsibility of the Government of The Gambia,

which can be financed through a number of arrangements including the government budget, and

loans borrowed from the domestic market by government..

At this stage, it is not possible to estimate the exact number of people who may be affected since

the technical designs/details have not yet been developed and total land needs particularly new

lands have not yet been identified. When these locations are known, and after the conclusion of

the site specific socioeconomic study, information on specific impacts, individual and household

incomes and numbers of affected people and other demographic data will be available, which

will facilitate the preparation of a detailed and accurate budget for each RAP. The following

assets will need to be identified:

(i).What are the lands impacted or needed for project purposes

(ii).Housing or other physical structures impacted (title or other evidence of valid claims to

land and property rights; plot dimensions, built area of each structure, construction materials for

all structures and infrastructure);

(iii).Businesses (evidence of valid claims to land and property rights; plot dimensions, built

area of each structure, construction materials for all structures and other improvements etc)

(iv). Farming or agricultural impacts (area cropped, cropping patterns, area to be taken, cropping

pattern, field estimate of crops and trees to be taken);

(v) Vegetable gardens (evidence of valid claims to land and property rights, plot dimensions,

number and type of plants or area of crop), if available;

(vi)Trees (by species and maturity); and other infrastructure or investments (e.g., fences, wells,

boreholes). Annex 8 is a proposed budget template for the RAP.

Page 40: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

32

ANNEXES

Annex 1 OP 4.12 - Involuntary Resettlement can be can be found on the Bank’s

website at www.worldbank.org.

Bank1 experience indicates that involuntary resettlement under development projects, if

unmitigated, often gives rise to severe economic, social, and environmental risks: production

systems are dismantled; people face impoverishment when their productive assets or income

sources are lost; people are relocated to environments where their productive skills may be less

applicable and the competition for resources greater; community institutions and social networks

are weakened; kin groups are dispersed; and cultural identity, traditional authority, and the

potential for mutual help are diminished or lost. This policy includes safeguards to address and

mitigate these impoverishment risks.

Policy Objectives

2. Involuntary resettlement may cause severe long-term hardship, impoverishment, and

environmental damage unless appropriate measures are carefully planned and carried out. For

these reasons, the overall objectives of the Bank's policy on involuntary resettlement are the

following:

(a) Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable

alternative project designs.2

(b) Where it is not feasible to avoid resettlement, resettlement activities should be conceived and

executed as sustainable development programs, providing sufficient investment resources to

enable the persons displaced by the project to share in project benefits. Displaced persons3

should be meaningfully consulted and should have opportunities to participate in planning and

implementing resettlement programs.

(c) Displaced persons should be assisted in their efforts to improve their livelihoods and

standards of living or at least to restore them, in real terms, to pre-displacement levels or to

levels prevailing prior to the beginning of project implementation, whichever is higher.4

Impacts Covered

Page 41: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

33

3 . This policy covers direct economic and social impacts5 that both result from Bank-assisted

investment projects,6 and are caused by

(a) the involuntary7 taking of land

8 resulting in

(i) relocation or loss of shelter;

(ii) lost of assets or access to assets; or

(iii) loss of income sources or means of livelihood, whether or not the affected persons must

move to another location; or

(b) the involuntary restriction of access9 to legally designated parks and protected areas resulting

in adverse impacts on the livelihoods of the displaced persons.

4. This policy applies to all components of the project that result in involuntary resettlement,

regardless of the source of financing. It also applies to other activities resulting in involuntary

resettlement, that in the judgment of the Bank, are

(a) directly and significantly related to the Bank-assisted project,

(b) necessary to achieve its objectives as set forth in the project documents; and

(c) carried out, or planned to be carried out, contemporaneously with the project.

5. Requests for guidance on the application and scope of this policy should be addressed to the

Resettlement Committee (see BP 4.12, para. 7).10

Required Measures

6. To address the impacts covered under para. 3 (a) of this policy, the borrower prepares a

resettlement plan or a resettlement policy framework (see paras. 25-30) that covers the

following:

Page 42: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

34

(a) The resettlement plan or resettlement policy framework includes measures to ensure that the

displaced persons are

(i) informed about their options and rights pertaining to resettlement;

(ii) consulted on, offered choices among, and provided with technically and economically

feasible resettlement alternatives; and

(iii) provided prompt and effective compensation at full replacement cost11

for losses of assets12

attributable directly to the project.

(b) If the impacts include physical relocation, the resettlement plan or resettlement policy

framework includes measures to ensure that the displaced persons are

(i) provided assistance (such as moving allowances) during relocation; and

(ii) provided with residential housing, or housing sites, or, as required, agricultural sites for

which a combination of productive potential, locational advantages, and other factors is at least

equivalent to the advantages of the old site.13

(c) Where necessary to achieve the objectives of the policy, the resettlement plan or resettlement

policy framework also include measures to ensure that displaced persons are

(i) offered support after displacement, for a transition period, based on a reasonable estimate of

the time likely to be needed to restore their livelihood and standards of living;14

and

(ii) provided with development assistance in addition to compensation measures described in

paragraph 6(a);

(iii) such as land preparation, credit facilities, training, or job opportunities.

7. In projects involving involuntary restriction of access to legally designated parks and protected

areas (see para. 3(b)), the nature of restrictions, as well as the type of measures necessary to

mitigate adverse impacts, is determined with the participation of the displaced persons during the

design and implementation of the project. In such cases, the borrower prepares a process

framework acceptable to the Bank, describing the participatory process by which

Page 43: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

35

(a) specific components of the project will be prepared and implemented;

(b) the criteria for eligibility of displaced persons will be determined;

(c) measures to assist the displaced persons in their efforts to improve their livelihoods, or at

least to restore them, in real terms, while maintaining the sustainability of the park or protected

area, will be identified; and

(d) potential conflicts involving displaced persons will be resolved.

The process framework also includes a description of the arrangements for implementing and

monitoring the process.

8. To achieve the objectives of this policy, particular attention is paid to the needs of vulnerable

groups among those displaced, especially those below the poverty line, the landless, the elderly,

women and children, indigenous peoples,15

ethnic minorities, or other displaced persons who

may not be protected through national land compensation legislation.

9. Bank experience has shown that resettlement of indigenous peoples with traditional land-

based modes of production is particularly complex and may have significant adverse impacts on

their identity and cultural survival. For this reason, the Bank satisfies itself that the borrower has

explored all viable alternative project designs to avoid physical displacement of these groups.

When it is not feasible to avoid such displacement, preference is given to land-based resettlement

strategies for these groups (see para. 11) that are compatible with their cultural preferences and

are prepared in consultation with them (see Annex A, para. 11).

10. The implementation of resettlement activities is linked to the implementation of the

investment component of the project to ensure that displacement or restriction of access does not

occur before necessary measures for resettlement are in place. For impacts covered in para. 3(a)

of this policy, these measures include provision of compensation and of other assistance required

for relocation, prior to displacement, and preparation and provision of resettlement sites with

adequate facilities, where required. In particular, taking of land and related assets may take place

only after compensation has been paid and, where applicable, resettlement sites and moving

allowances have been provided to the displaced persons. For impacts covered in para. 3(b) of this

policy, the measures to assist the displaced persons are implemented in accordance with the plan

of action as part of the project (see para. 30).16

11. Preference should be given to land-based resettlement strategies for displaced persons whose

livelihoods are land-based. These strategies may include resettlement on public land (see

footnote 1 above), or on private land acquired or purchased for resettlement. Whenever

replacement land is offered, resettlers are provided with land for which a combination of

productive potential, locational advantages, and other factors is at least equivalent to the

advantages of the land taken. If land is not the preferred option of the displaced persons, the

Page 44: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

36

provision of land would adversely affect the sustainability of a park or protected area,17

or

sufficient land is not available at a reasonable price, non-land-based options built around

opportunities for employment or self-employment should be provided in addition to cash

compensation for land and other assets lost. The lack of adequate land must be demonstrated and

documented to the satisfaction of the Bank.

12. Payment of cash compensation for lost assets may be appropriate where (a) livelihoods are

land-based but the land taken for the project is a small fraction18

of the affected asset and the

residual is economically viable; (b) active markets for land, housing, and labor exist, displaced

persons use such markets, and there is sufficient supply of land and housing; or (c) livelihoods

are not land-based. Cash compensation levels should be sufficient to replace the lost land and

other assets at full replacement cost in local markets.

13. For impacts covered under para. 3(a) of this policy, the Bank also requires the following:

(a) Displaced persons and their communities, and any host communities receiving them, are

provided timely and relevant information, consulted on resettlement options, and offered

opportunities to participate in planning, implementing, and monitoring resettlement. Appropriate

and accessible grievance mechanisms are established for these groups.

(b) In new resettlement sites or host communities, infrastructure and public services are provided

as necessary to improve, restore, or maintain accessibility and levels of service for the displaced

persons and host communities. Alternative or similar resources are provided to compensate for

the loss of access to community resources (such as fishing areas, grazing areas, fuel, or fodder).

(c) Patterns of community organization appropriate to the new circumstances are based on

choices made by the displaced persons. To the extent possible, the existing social and cultural

institutions of resettlers and any host communities are preserved and resettlers' preferences with

respect to relocating in preexisting communities and groups are honored.

Eligibility for Benefits19

14. Upon identification of the need for involuntary resettlement in a project, the borrower carries

out a census to identify the persons who will be affected by the project (see the Annex A, para.

6(a)), to determine who will be eligible for assistance, and to discourage inflow of people

ineligible for assistance. The borrower also develops a procedure, satisfactory to the Bank, for

establishing the criteria by which displaced persons will be deemed eligible for compensation

and other resettlement assistance. The procedure includes provisions for meaningful

Page 45: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

37

consultations with affected persons and communities, local authorities, and, as appropriate,

nongovernmental organizations (NGOs), and it specifies grievance mechanisms.

15. Criteria for Eligibility. Displaced persons may be classified in one of the following three

groups:

(a) those who have formal legal rights to land (including customary and traditional rights

recognized under the laws of the country);

(b) those who do not have formal legal rights to land at the time the census begins but have a

claim to such land or assets--provided that such claims are recognized under the laws of the

country or become recognized through a process identified in the resettlement plan (see Annex

A, para. 7(f)); and20

(c) those who have no recognizable legal right or claim to the land they are occupying.

16. Persons covered under para. 15(a) and (b) are provided compensation for the land they lose,

and other assistance in accordance with para. 6. Persons covered under para. 15(c) are provided

resettlement assistance21

in lieu of compensation for the land they occupy, and other assistance,

as necessary, to achieve the objectives set out in this policy, if they occupy the project area prior

to a cut-off date established by the borrower and acceptable to the Bank.22

Persons who encroach

on the area after the cut-off date are not entitled to compensation or any other form of

resettlement assistance. All persons included in para. 15(a), (b), or (c) are provided compensation

for loss of assets other than land.

Resettlement Planning, Implementation, and Monitoring

17. To achieve the objectives of this policy, different planning instruments are used, depending

on the type of project:

(a) a resettlement plan or abbreviated resettlement plan is required for all operations that entail

involuntary resettlement unless otherwise specified (see para. 25 and Annex A);

(b) a resettlement policy framework is required for operations referred to in paras. 26-30 that

may entail involuntary resettlement, unless otherwise specified (see Annex A; and

(c) a process framework is prepared for projects involving restriction of access in accordance

with para. 3(b) (see para. 31).

Page 46: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

38

18. The borrower is responsible for preparing, implementing, and monitoring a resettlement plan,

a resettlement policy framework, or a process framework (the "resettlement instruments"), as

appropriate, that conform to this policy. The resettlement instrument presents a strategy for

achieving the objectives of the policy and covers all aspects of the proposed resettlement.

Borrower commitment to, and capacity for, undertaking successful resettlement is a key

determinant of Bank involvement in a project.

19. Resettlement planning includes early screening, scoping of key issues, the choice of

resettlement instrument, and the information required to prepare the resettlement component or

subcomponent. The scope and level of detail of the resettlement instruments vary with the

magnitude and complexity of resettlement. In preparing the resettlement component, the

borrower draws on appropriate social, technical, and legal expertise and on relevant community-

based organizations and NGOs.23

The borrower informs potentially displaced persons at an early

stage about the resettlement aspects of the project and takes their views into account in project

design.

20. The full costs of resettlement activities necessary to achieve the objectives of the project are

included in the total costs of the project. The costs of resettlement, like the costs of other project

activities, are treated as a charge against the economic benefits of the project; and any net

benefits to resettlers (as compared to the "without-project" circumstances) are added to the

benefits stream of the project. Resettlement components or free-standing resettlement projects

need not be economically viable on their own, but they should be cost-effective.

21. The borrower ensures that the Project Implementation Plan is fully consistent with the

resettlement instrument.

22. As a condition of appraisal of projects involving resettlement, the borrower provides the

Bank with the relevant draft resettlement instrument which conforms to this policy, and makes it

available at a place accessible to displaced persons and local NGOs, in a form, manner, and

language that are understandable to them. Once the Bank accepts this instrument as providing an

adequate basis for project appraisal, the Bank makes it available to the public through its

InfoShop. After the Bank has approved the final resettlement instrument, the Bank and the

borrower disclose it again in the same manner.24

23. The borrower's obligations to carry out the resettlement instrument and to keep the Bank

informed of implementation progress are provided for in the legal agreements for the project.

24. The borrower is responsible for adequate monitoring and evaluation of the activities set forth

in the resettlement instrument. The Bank regularly supervises resettlement implementation to

determine compliance with the resettlement instrument. Upon completion of the project, the

borrower undertakes an assessment to determine whether the objectives of the resettlement

Page 47: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

39

instrument have been achieved. The assessment takes into account the baseline conditions and

the results of resettlement monitoring. If the assessment reveals that these objectives may not be

realized, the borrower should propose follow-up measures that may serve as the basis for

continued Bank supervision, as the Bank deems appropriate (see also BP 4.12, para. 16).

Resettlement Instruments

Resettlement Plan

25. A draft resettlement plan that conforms to this policy is a condition of appraisal (see Annex

A, para. 2-21) for projects referred to in para. 17(a) above.25

However, where impacts on the

entire displaced population are minor,26

or fewer than 200 people are displaced, an abbreviated

resettlement plan may be agreed with the borrower (see Annex A, para. 22). The information

disclosure procedures set forth in para. 22 apply.

Resettlement Policy Framework

26. For sector investment operations that may involve involuntary resettlement, the Bank

requires that the project implementing agency screen subprojects to be financed by the Bank to

ensure their consistency with this OP. For these operations, the borrower submits, prior to

appraisal, a resettlement policy framework that conforms to this policy (see Annex A, paras. 23-

25). The framework also estimates, to the extent feasible, the total population to be displaced and

the overall resettlement costs.

27. For financial intermediary operations that may involve involuntary resettlement, the Bank

requires that the financial intermediary (FI) screen subprojects to be financed by the Bank to

ensure their consistency with this OP. For these operations, the Bank requires that before

appraisal the borrower or the FI submit to the Bank a resettlement policy framework conforming

to this policy (see Annex A, paras. 23-25). In addition, the framework includes an assessment of

the institutional capacity and procedures of each of the FIs that will be responsible for subproject

financing. When, in the assessment of the Bank, no resettlement is envisaged in the subprojects

to be financed by the FI, a resettlement policy framework is not required. Instead, the legal

agreements specify the obligation of the FIs to obtain from the potential subborrowers a

resettlement plan consistent with this policy if a subproject gives rise to resettlement. For all

subprojects involving resettlement, the resettlement plan is provided to the Bank for approval

before the subproject is accepted for Bank financing.

28. For other Bank-assisted project with multiple subprojects27

that may involve involuntary

resettlement, the Bank requires that a draft resettlement plan conforming to this policy be

Page 48: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

40

submitted to the Bank before appraisal of the project unless, because of the nature and design of

the project or of a specific subproject or subprojects (a) the zone of impact of subprojects cannot

be determined, or (b) the zone of impact is known but precise sitting alignments cannot be

determined. In such cases, the borrower submits a resettlement policy framework consistent with

this policy prior to appraisal (see Annex A, paras. 23-25). For other subprojects that do not fall

within the above criteria, a resettlement plan conforming to this policy is required prior to

appraisal.

29. For each subproject included in a project described in para. 26, 27, or 28 that may involve

resettlement, the Bank requires that a satisfactory resettlement plan or an abbreviated

resettlement plan that is consistent with the provisions of the policy framework be submitted to

the Bank for approval before the subproject is accepted for Bank financing.

30. For projects described in paras. 26-28 above, the Bank may agree, in writing, that subproject

resettlement plans may be approved by the project implementing agency or a responsible

government agency or financial intermediary without prior Bank review, if that agency has

demonstrated adequate institutional capacity to review resettlement plans and ensure their

consistency with this policy. Any such delegation, and appropriate remedies for the entity's

approval of resettlement plans found not to be in compliance with Bank policy, are provided for

in the legal agreements for the project. In all such cases, implementation of the resettlement

plans is subject to ex post review by the Bank.

Process Framework

31. For projects involving restriction of access in accordance with para. 3(b) above, the borrower

provides the Bank with a draft process framework that conforms to the relevant provisions of this

policy as a condition of appraisal. In addition, during project implementation and before to

enforcing of the restriction, the borrower prepares a plan of action, acceptable to the Bank,

describing the specific measures to be undertaken to assist the displaced persons and the

arrangements for their implementation. The plan of action could take the form of a natural

resources management plan prepared for the project.

Assistance to the Borrower

32. In furtherance of the objectives of this policy, the Bank may at a borrower's request support

the borrower and other concerned entities by providing

(a) assistance to assess and strengthen resettlement policies, strategies, legal frameworks, and

specific plans at a country, regional, or sectoral level;

(b) financing of technical assistance to strengthen the capacities of agencies responsible for

resettlement, or of affected people to participate more effectively in resettlement operations;

(c) financing of technical assistance for developing resettlement policies, strategies, and specific

plans, and for implementation, monitoring, and evaluation of resettlement activities; and

Page 49: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

41

(d) financing of the investment costs of resettlement.

33. The Bank may finance either a component of the main investment causing displacement and

requiring resettlement, or a free-standing resettlement project with appropriate cross-

conditionalities, processed and implemented in parallel with the investment that causes the

displacement. The Bank may finance resettlement even though it is not financing the main

investment that makes resettlement necessary.

____________

1. "Bank" includes IBRD and IDA; "loans" includes IDA credits and IDA grants,

guarantees, Project Preparation Facility (PPF) advances and grants; and "projects"

includes projects under (a) PPFs advances and Institutional Development Fund (IDF)

grants, if they include investment activities; (b) grants under the Global Environment

Facility and Montreal Protocol, for which the Bank is the implementing/executing

agency; and (c) grants or loans provided by other donors that are administered by the

Bank. The term "project" does not include programs supported by Development Policy

Lending (for which the environmental provisions are set out in OP/BP 8.60, Development

Policy Lending), or by Program-for-Results Financing (for which environmental

provisions are set out in OP/BP 9.00, Program-for-Results Financing. "Borrower" also

includes, wherever the context requires, the guarantor or the project implementing

agency.

2. In devising approaches to resettlement in Bank-assisted projects, other Bank policies

should be taken into account, as relevant. These policies include OP 4.01, Environmental

Assessment, OP 4.04, Natural Habitats, OP 4.10, Indigenous Peoples, and OP

4.11, Physical Cultural Resources.

3. The term "displaced persons" refers to persons who are affected in any of the ways

described in para. 3 of this OP.

4. Displaced persons under para. 3(b) should be assisted in their efforts to improve or

restore their livelihoods in a manner that maintains the sustainability of the parks and

protected areas.

5. Where there are adverse indirect social or economic impacts, it is good practice for the

borrower to undertake a social assessment and implement measures to minimize and

mitigate adverse economic and social impacts, particularly upon poor and vulnerable

groups. Other environmental, social, and economic impacts that do not result from land

Page 50: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

42

taking may be identified and addressed through environmental assessments and other

project reports and instruments.

6. This policy does not apply to restrictions of access to natural resources under community-

based projects, i.e. where the community using the resources decides to restrict access to

these resources, provided that an assessment satisfactory to the Bank establishes that the

community decision-making process is adequate, and that it provides for identification of

appropriate measures to mitigate adverse impacts, if any, on the vulnerable members of

the community. This policy also does not cover refugees from natural disasters, war, or

civil strife (see OP 8.00, Rapid Response to Crises and Emergencies).

7. For the puRAPoses of this policy, "involuntary" means actions that may be taken without

the displaced person's informed consent or power of choice.

8. "Land" includes anything growing on or permanently affixed to land, such as buildings

and crops. This policy does not apply to regulations of natural resources on a national or

regional level to promote their sustainability, such as watershed management,

groundwater management, fisheries management, etc. The policy also does not apply to

disputes between private parties in land titling projects, although it is good practice for

the borrower to undertake a social assessment and implement measures to minimize and

mitigate adverse social impacts, especially those affecting poor and vulnerable groups.

9. For the puRAPoses of this policy, involuntary restriction of access covers restrictions on

the use of resources imposed on people living outside the park or protected area, or on

those who continue living inside the park or protected area during and after project

implementation. In cases where new parks and protected areas are created as part of the

project, persons who lose shelter, land, or other assets are covered under para. 3(a).

Persons who lose shelter in existing parks and protected areas are also covered under

para. 3(a).

10. The Involuntary Resettlement Sourcebook provides good practice guidance to staff on the

policy.

11. "Replacement cost" is the method of valuation of assets that helps determine the amount

sufficient to replace lost assets and cover transaction costs. In applying this method of

valuation, depreciation of structures and assets should not be taken into account (for a

detailed definition of replacement cost, see Annex A, footnote 1). For losses that cannot

easily be valued or compensated for in monetary terms (e.g., access to public services,

customers, and suppliers; or to fishing, grazing, or forest areas), attempts are made to

Page 51: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

43

establish access to equivalent and culturally acceptable resources and earning

opportunities. Where domestic law does not meet the standard of compensation at full

replacement cost, compensation under domestic law is supplemented by additional

measures necessary to meet the replacement cost standard. Such additional assistance is

distinct from resettlement assistance to be provided under other clauses of para. 6.

12. If the residual of the asset being taken is not economically viable, compensation and

other resettlement assistance are provided as if the entire asset had been taken.

13. The alternative assets are provided with adequate tenure arrangements. The cost of

alternative residential housing, housing sites, business premises, and agricultural sites to

be provided can be set off against all or part of the compensation payable for the

corresponding asset lost.

14. Such support could take the form of short-term jobs, subsistence support, salary

maintenance or similar arrangements.

15. See OP 4.10, Indigenous Peoples.

16. Where the borrower has offered to pay compensation to an affected person in accordance

with an approved resettlement plan, but the offer has been rejected, the taking of land and

related assets may only proceed if the borrower has deposited funds equal to the offered

amount plus 10 percent in a secure form of escrow or other interest-bearing deposit

acceptable to the Bank, and has provided a means satisfactory to the Bank for resolving

the dispute concerning said offer of compensation in a timely and equitable manner.

17. See OP 4.04, Natural Habitats.

18. As a general principle, this applies if the land taken constitutes less than 20% of the total

productive area.

19. Paras. 13-15 do not apply to impacts covered under para. 3(b) of this policy. The

eligibility criteria for displaced persons under 3 (b) are covered under the process

framework (see paras. 7 and 30).

20. Such claims could be derived from adverse possession, from continued possession of

public lands without government action for eviction (that is, with the implicit leave of the

government), or from customary and traditional law and usage, and so on.

Page 52: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

44

21. Resettlement assistance may consist of land, other assets, cash, employment, and so on,

as appropriate.

22. Normally, this cut-off date is the date the census begins. The cut-off date could also be

the date the project area was delineated, prior to the census, provided that there has been

an effective public dissemination of information on the area delineated, and systematic

and continuous dissemination subsequent to the delineation to prevent further population

influx.

23. For projects that are highly risky or contentious, or that involve significant and complex

resettlement activities, the borrower should normally engage an advisory panel of

independent, internationally recognized resettlement specialists to advise on all aspects of

the project relevant to the resettlement activities. The size, role, and frequency of meeting

depend on the complexity of the resettlement. If independent technical advisory panels

are established under OP 4.01, Environmental Assessment, the resettlement panel may

form part of the environmental panel of experts.

24. See The World Bank Policy on Access to Information, para. 34 (Washington,

D.C.: World Bank, 2002).

25. An exception to this requirement may be made in highly unusual circumstances (such as

emergency operations) with the approval of Bank Management (see BP 4.12, para. 8). In

such cases, the Management's approval stipulates a timetable and budget for developing

the resettlement plan.

26. Impacts are considered "minor" if the affected people are not physically displaced and

less than 10 percent of their productive assets are lost.

27. For the puRAPose of this paragraph, the term "subprojects" includes components and subcomponents

Page 53: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

45

Annex 2 TOR Resettlement Policy Framework (RPF)

1. Introduction and Project Description

The Government of The Gambia has requested funds for the implementation of the Commercial

Agriculture and Value Chain Management Project. The proposed project would aim to improve

production systems and access to market of targeted agricultural commodities. The project would

have three components: (A) Strengthening key rural infrastructure; (B) Support Agricultural

production and market access; and (C) Institutional support and project Coordination.

Component A: Strengthening Key Rural Infrastructure. The component’s objective is to

improve the country’s resilience to climatic shocks through the construction, rehabilitation and

maintenance of basic irrigation infrastructure and required management systems for enhanced

local grain rice production. Eligible infrastructure would be basic infrastructure related to tidal

irrigation development as well as groundwater extraction and distribution systems. The

component would also support the development of drip irrigation systems as well as other low

cost alternatives such as “semi-Californian” technology (low pressure pipe networks) which have

been successful in other countries, to support horticulture production. Through Public Private

Partnerships (PPPs) the project would help smallholders, small and medium enterprises (SME),

and agribusiness enterprises establish tidal irrigation schemes. The project may complement new

investors' capital with grants set at different levels to support consultants' services, civil works,

and irrigation equipment. It would also support technical advisory services to ensure the

viability of the schemes. It would also seek to leverage private sector investment through public-

private partnerships and viable productive alliance with targeted beneficiaries, including

producers, agro-processors and other relevant small and medium agribusiness enterprises to

increase domestic production and milling capacities for high-quality rice for urban markets. This

would be essential for connecting farmers to markets

1. The scope of works eligible for support and the selection of specific tidal areas would be

carried out after more elaborate technical studies and economic and financial viability

assessments have been conducted in addition to the environmental and social studies of the area

to be developed. A Menu of Options would be developed during the project preparation process.

Annex 1 presents the basic principles for the construction/rehabilitation of tidal schemes and

selection of projects sites. It is expected that a large share of the project funds would go to

rehabilitation and maintenance Irrigations systems. .

2. Component B: Support to agricultural production and access to markets (the

development of value chains). The objective of this component is to improve smallholder

productivity and increase market access and market efficiency for the identified value chains to

promote smallholder commercialization. The component would provide support for enhanced

domestic production, processing, linking producers to markets, and strengthening value chains of

the target commodities. These investments would cover specific aspects of the targeted

commodities (at production, post-harvest and storage, processing and marketing levels), and

focus on the integration of activities across different stages of the value chains. The Component

would also improve technical and organizational capacities producer organizations in targeted

commodities, through advisory support and training. Positive and visible developments in

Page 54: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

46

improving market access are expected to provide major incentives to farmers for increased

production. It would leverage support from existing interventions as the West Africa Agricultural

Productivity Program (WAAPP) and the Gambia Emergency Agricultural Production Support to

enhance the producers’ access to improved technologies (including climate-smart technologies)

which increase productivity and competitiveness. Assistance provided would include support for

the establishment of sustainable services supply models that could include the establishment of

agri-business centers to provide essential services and inputs to smallholder rice farmers in

viable and sustainable productive alliances. Annex 2 presents basic principles and models of

productive alliances that would be explored and tuned up. Envisaged technology transfer and

extension activities would also cover relevant nutrition education and where possible promote

bio-fortified crop varieties.

Component C: Project Management and Coordination. Project management and

coordination would largely rely on existing Government institutions and structures and capacities

build under the CPCU. The component would fund costs associated with: project management

and coordination; relevant technical assistance; project monitoring and evaluation; consultancy

services; communication and training; equipment and vehicles; and incremental operating cost.

The activities to be undertaken under Component A have triggered a number of World Bank

Safeguard policies including OP4.12 on involuntary resettlement. This means that the project is

likely to have impacts on land access, restriction of access to assets, displacement and loss of

livelihood among others. Initial reviews indicate that the project can generate positive social,

environmental and economic impacts. In spite of these potential positive impacts, there is also

the recognition of potential negative impacts which calls for appropriate mitigation measures and

institutional arrangements to implement the measures.

To ensure that the project either completely avoids or minimize such negative impacts as per

World Bank requirement for safeguards, the Government of Ghana is required to prepare a

Resettlement Policy Framework (RPF). This Terms of Reference (TOR) is developed to guide

the preparation of the RPF.

2. Objective for the Assignment

The objective for the RPF is to set out the policies, principles, institutional arrangements,

schedules and indicative budgets that will take care of anticipated resettlements. These

arrangements are also to ensure that there is a systematic process (as against an hoc one) to guide

the different stages of the implementation of the measures outlined in the framework. This

process shall also consider the participation of affected persons, involvement of relevant

institutions and stakeholders, adherence to both World Bank and Government policies,

procedures and requirements; and shall delineate compensation for affected persons.

The consultant shall be guided by these considerations. The RPF shall serve as a guide for the

development of a resettlement action plan (RAP) should this be required after assessment of

locations and specific subproject activities.

3. Specific Requirements of the RPF

Page 55: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

47

The preparation of this RPF should follow the requirements of the World Bank’s policy on

Involuntary Resettlement, OP4.12. The RPF shall also make reference to Government of

Ghana’s legal and institutional requirements. Any identified gaps between these two

requirements are to be clearly captured. The consultant shall explain how these gaps will be

filled, and which one shall take precedence over what and why.

4. Scope of Assignment

The assignment by the consultant shall cover the following key areas. Other areas considered

relevant may be described by the consultant if needed. The consultant shall undertake the

following tasks:

i. Project Description. Provide a brief description of the project to place the RPF in the

right context. This would include a summary of the background to the project and the

components. Most importantly, the consultant shall identify the possible resettlement

issues that each component and subcomponents are likely to generate and for which

reason this RPF is being developed.

ii. Country Legal and Institutional Guidelines and Requirements. Review the national

laws governing land take and other assets. S/he shall also look at the various land

tenure and ownership systems in Ghana, the different legal instruments regarding

government and individual acquisitions, resettlement and compensation policies. The

consultant shall also describe any discrepancies identified in the different legal

instruments and identify the institutions associated with these legal instruments and

their respective roles from the national to the local level. The institutional

arrangement will include implementation and monitoring mechanisms that ensure

inclusiveness and participation of all affected people, groups and communities.

iii. World Bank Safeguards Policies. Spell out the World Bank’s policy on Involuntary

Resettlement OP 4.12 and assess how this applies in the specific case of the

GCAVMP. Attention shall be paid and documented on the difference(s) between the

Bank’s policy and The Gambia’s policy on involuntary resettlement, noting that

where the differences are significant whichever policy is considered to be of a

comparatively higher standard will apply.

iv. Social Assessment and Socio-Economic Surveys. Conduct an initial social and

economic survey within the proposed regions (may rely on existing information from

other studies) for the project activities required under the components that trigger the

involuntary resettlement policy. The survey shall cover issues on the social structure,

economic activities, social characterization of persons likely to be affected including

numbers, the different social institutions, social capital and mechanism for social

cohesion. The RPF shall also explore and describe existing conflict resolution

mechanism and potential for conflict situations arising as a result of the special

conditions in the Northern part of Ghana. This information will serve as critical

baseline data for a future RAP should that become necessary.

Page 56: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

48

v. Estimated Population, Displacement and Categories of Affected People. The

consultant shall record the number of estimated people likely to be affected or

displaced by the project activities as noted in the project component description

above. The different categories may include those who may be losing legal title to

land and those without legal title but use the land for economic activities or for

residential purposes-accommodation. There may be those who may be losing

temporary access to property or business site. These are only examples of those who

are likely to be affected through displacement. The RPF shall identify the right

categories as per the impacts noted or expected.

vi. Eligibility criteria for various Categories of affected people. Determine the method

for setting a cut-off date for eligibility for compensation and also as a means for

making this information (on cut-off date) reach the wider public. In addition, the

consultant shall determine the compensation type for the different categories, losses

and affected persons. The RPF shall take particular note of the multidimensional

impact of the project and factor that into the analysis especially with regard to

different sites and different forms of social impacts. The criteria for compensation

should be pegged on the national legal requirements and provisions, World Bank

OP4.12, and guided by social sustainability and poverty reduction factors and

fairness. The section shall also document the unit of payment for compensation that

is, whether per individuals, families or groups and indicate the scenarios or cases for

the application of each unit of analysis or a combination of units where appropriate.

vii. Methods for valuing affected assets. This section shall describe in detail the methods

used in valuing those assets that will be eligible for compensation as per national or

World Bank policy on involuntary resettlement (OP4.12). This process shall capture

the methodology for taking of inventory of assets, values assigned and agreement

reached with each identified PAP and consider inflationary realities in the final

determination of values. The consultant shall indicate in the RPF a statement on the

possible revision of values should there be major discrepancies between dates for

value determination and actual date for payments. The PAPs shall have an

opportunity to do their own valuation if they have doubts or misgivings through the

facilitation of the project for further negotiations between the PAP(s) and the client.

Valuing of assets should be a process of engagement with PAPs and not an

imposition. The RPF shall demonstrate that the methods used for the exercise in its

entirety were engaging and acceptable to all stakeholders.

viii. Entitlement matrix for proposed resettlement and compensation policy. Following

from the above, the RPF shall include a matrix that details the type of compensation

that each identified PAP will be entitled to and a rationale as part of the matrix.

ix. Organizational Arrangements and Procedures for Delivery of Entitlements. The

RPF shall describe the process for organizational arrangements, responsibilities and

roles, the approval processes for the various stages of the compensation work and

which actors will be involved. This section shall also spell out the actual process for

Page 57: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

49

delivering the entitlement including the roles for the different agencies and reporting

formats and responsibilities.

x. Methods for Consultation with and Participation of Affected People. The consultant

shall as a matter of importance, describe the methodology for consultation and

participation by the PAPs in the process (until they have received their entitlements).

The consultation process includes that for the development of the RPF and

subsequent RAPs. The record of consultation and participation for this RPF shall be

attached as an annex to the final RPF report. As part of this, the consultant will

develop a program for the disclosure of the RPF, but the responsibility for both the

disclosure and dissemination of the RPF lies with the client.

xi. Grievance Redress Mechanisms. Under the grievance redress mechanism, the

consultant shall describe the options available to PAPs for grievance redress they may

have about the process, the identification of eligible people for compensation, the

valuing and payments of compensation and any other complaints they may have with

the entire process. The RPF shall indicate how these would be disseminated and made

accessible to them in a clear and comprehensible manner. The grievance redress

mechanism shall also have an in-built monitoring mechanism to check on

responsiveness to complaints or grievances lodged. The different forms of receiving

the complaints should be clearly described together with the different stages of the

process. In addition, the redress mechanism shall indicate alternatives, in case the

proposed mechanisms, for any reason, do not respond to all grievances and

complaints.

xii. Budget and Funding Arrangements. The RPF shall indicate the sources of funding

for RAPs, should that become necessary and an overall cost estimates for resettlement

including for monitoring of the resettlement activities for all sites. The financial

responsibility of the relevant stakeholders, where applicable, should be stated to avoid

ambiguity of sources of funding for resettlement activities. These budgets shall

consider inflationary trends.

xiii. Monitoring Arrangements. The RPF shall provide appropriate mechanism for

monitoring the implementation of the resettlement activities. The consultant shall

propose participatory monitoring approaches that would involve PAPs. The roles of

different players like the PAPs, civil society, traditional authorities, and local

government authorities among others, in the implementation and monitoring process

will need to be clarified. The RPF shall develop, as part of this, a template for

monitoring with indicators based on the main issues identified and spelt out in the

RPF.

xiv. Implementation Schedule. To avoid confusion with cut-off dates and other time lines

especially because compensation will have to be paid prior to commencement of any

civil works, it is important for the RPF to set out implementation schedule for the

resettlement. The RPF shall, in addition to the implementation schedule identify

potential risks that could militate against the smooth implementation of the

Page 58: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

50

resettlement actions and suggest plausible mitigation measures to serve as a guide to

the client and the team who will be working on the implementation.

xv. Template for the Design of Resettlement Action Plan. The RPF shall develop a

template for the design of a RAP based on the details of the RPF and informed by

World Bank framework for RAPs. This template shall spell out the main subsections

of the RAP and any other relevant annexes that should be included.

5. Qualifications and Experience

The assignment will be carried out by an individual consultant. The Consultant shall have a

minimum of five (5) years working experience, with a background in sociology, anthropology,

development planning or other relevant field. S/he should have expertise and knowledge

preparations of social safeguards or involuntary resettlement documents like Resettlement Policy

Framework (RPF) and Resettlement Action Plan (RAP) and shall demonstrate experience with

working with international development institutions like the World Bank. Knowledge of World

Bank safeguard policies will be additional advantage.

6. Facilities to be provided by Client

The consultant shall be provided with project documents, reports from related projects and

studies already conducted. The client may also facilitate scheduling of meetings with

stakeholders on behalf of the consultant.

7. Time Frame

The assignment shall be completed within four (4) weeks after signing of contract.

8. Expected Output/Deliverables and Reporting Format

The Consultant is expected to have the following deliverables:

(i) Detailed work plan with expected output. This will be discussed by consultant, client

and other experts to ensure quality of final outcome. Three (3) copies shall be

submitted to the client in addition to there an electronic version.

This will be delivered one week after signing of contract;

(ii) Draft Report This will be circulated for comments and relevant issues raised

incorporated into revised version. Three copies shall be submitted to the client. In

addition the consultant will provide an electronic version.

This will be delivered two (2) weeks after submission of inception report.

(iii) Final Report The final report should include a concise Executive Summary and

should have all annexes and bibliography and the dissemination/disclosure plan. This

will be delivered two (2) weeks after submission of draft report. The consultant shall

submit three (3) copies of the report in hard copies and an electronic version.

Page 59: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

51

Annex 3 land assets and physical inventory survey form

District.......................................

Village.......................................

Sur

vey

No

Na

me

H/

H

No

of

pers

ons

in

the

hous

e

Tota

l

hold

ing

of

H/H

Land

to be

acqui

red

La

nd

us

e

typ

e

Los

e of

%to

tal

Lose of assets Loss of crops Lose

of

other

asset

s

Other loses

Perma

nent

struct

ure

Temp

oral

struct

ure

Are of

reside

ntial

land

loss

Fr

uit

tre

es,

typ

e

&

no

Agricul

tural

land

loss

Oth

er

spec

ify

Grav

e

yards

,

well,

mark

ets,

type

& no

Resid

ence

(rente

d)

Busi

ness

loss

Inco

me

loss

Signed by Relevant Safeguard Focal Person: _______________________________

Title: _______________________________

Date: _______________________________

Signed by Project Manager: Name: _______________________________

Title: _______________________________

Date: _______________________________

Annex 4 Sample Census Survey form Part 1

Name of Interviewer

ID Code

Signature

Name of Supervisor

ID Code

After verification of interview

Village Name

ID Code

No of concessions in the Village

Date...........................................................................................

Day Month Year

Part 2 household survey Name

&surna

me

Relationsh

ip to H of

family

sex PO

B

Ag

e

Marit

al

status

Residenti

al status

Ethni

c

grou

p

Religio

n

Level of

Educati

on

Incom

e

earner

Economic activity

Page 60: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

52

M F Y N primar

y

seconda

ry

1

2

3

4

5

6

Note:

Relation to Head of family- spouse, child, parent, grand children, spouse of childe of head of

family, others specify

POB-Place of Birth

Marital status –married, widowed, divorce, unmarried, no answer

Residential status-permanent, absent, visitor, other specify

Level of Education- illiterate, some primary education, complete primary education, some

secondary, complete secondary, tertiary, religious school technical and vocational school others

specify

Annex 5 Detailed Screening Checklist for Environmental and Social Impacts ISSUES SCALE

Mitigatio

n

measure

A Zoning and Land

Use Planning

non

e

minor/sma

ll

moderate/mediu

m

Significant/lar

ge

1 Will the subproject

affect land use zoning

and

planning or conflict

with prevalent land

use

patterns?

2 Will the subproject

involve significant

land disturbance or

site clearance?

3 Will the subproject

land be subject to

potential

encroachment by

urban or industrial

use or located

in an area intended

for urban or industrial

development?

B. Utilities and

Page 61: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

53

Facilities

1 Will the subproject

require the setting up

of

ancillary facilities?

5 Will the subproject

make significant

demands on

utilities and services?

6 Will the subproject

require significant

levels of

accommodation or

service amenities to

support the

workforce during

construction (e.g.,

contractor will

need more than 20

workers)?

C Water and Soil

Contamination

7 Will the subproject

require large amounts

of raw

materials or

construction

materials?

8 Will the subproject

generate large

amounts of

residual wastes,

construction material

waste or

cause soil erosion?

9 Will the subproject

result in potential soil

or water

contamination (e.g.,

from oil, grease and

fuel from

equipment yards)?

1

0

Will the subproject

lead to contamination

of ground

and surface waters by

Page 62: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

54

herbicides for

vegetation

control and chemicals

(e.g., calcium

chloride) for

dust control?

1

1

Will the subproject

lead to an increase in

suspended

sediments in streams

affected by road cut

erosion,

decline in water

quality and increased

sedimentation

downstream?

1

2

Will the subproject

involve the use of

chemicals or

solvents?

1

3

Will the subproject

lead to the

destruction of

vegetation and soil in

the right-of-way,

borrow pits,

waste dumps, and

equipment yards?

1

4

Will the subproject

lead to the creation of

stagnant

water bodies in

borrow pits, quarries,

etc.,

encouraging for

mosquito breeding

and other

disease vectors?

D

.

Noise and Air

Pollution Hazardous

Substances

1

5

Will the subproject

increase the levels of

harmful air

emissions?

1 Will the subproject

Page 63: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

55

6 increase ambient

noise levels?

1

7

Will the subproject

involve the storage,

handling or

transport of

hazardous

substances?

E. Fauna and Flora

1

8

Will the subproject

involve the

disturbance or

modification of

existing drainage

channels (rivers,

canals) or surface

water bodies

(wetlands, marshes)?

1

9

Will the subproject

lead to the

destruction or

damage of terrestrial

or aquatic ecosystems

or

endangered species

directly or by induced

development?

2

0

Will the subproject

lead to the

disruption/destruction

of wildlife through

interruption of

migratory routes,

disturbance of

wildlife habitats, and

noise-related

problems?

F. Destruction/Disrupti

on of Land and

Vegetation

2

1

Will the subproject

lead to unplanned use

of the

infrastructure being

developed?

2 Will the subproject

Page 64: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

56

2 lead to long-term or

semipermanent

destruction of soils in

cleared areas not

suited for agriculture?

2

3

Will the subproject

lead to the

interruption of

subsoil and overland

drainage patterns (in

areas of

cuts and fills)?

2

4

Will the subproject

lead to landslides,

slumps, slips

and other mass

movements in road

cuts?

2

5

Will the subproject

lead to erosion of

lands below

the roWorld Banked

receiving

concentrated outflow

carried by covered or

open drains

2

6

Will the subproject

lead to long-term or

semipermanent

destruction of soils in

cleared areas not

suited for agriculture

2

7

Will the subproject

lead to health hazards

and

interference of plant

growth adjacent to

roads by

dust raised and blown

by vehicles?

G Cultural Property

2

8

Will the subproject

have an impact on

archaeological or

historical sites,

including historic

Page 65: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

57

urban areas

2

9

Will the subproject

have an impact on

religious

monuments,

structures and/or

cemeteries?

3

0

Have Chance Finds

procedures been

prepared for

use in the subproject?

H

.

Expropriation and

Social Disturbance

Will the subproject

involve land

expropriation or

demolition of existing

structures?

Will the subproject

lead to induced

settlements by

workers and others

causing social and

economic

disruption?

Will the subproject

lead to environmental

and social

disturbance by

construction camps?

Annex 6 involuntary land acquisition and resettlement form IMPACT NOT

KNOWN

YES NO SCALE/TO

WHAT

EXTEND?

Is the proposed

sub-project

undertaking

likely to involve

land acquisition

Must the land

eye marked

acquired?

Is there an

Page 66: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

58

alternative?

Is the location of

the land t

acquired known?

What is the size

of the Land?

Ownership-

Whose land is it?

Productive land

that is allocated

to women?

Any

documentations?

What is the land

being use for

currently?

Are there future

plans for use of

the land?

Security of Land

– is it being used

as collateral?

Borrowed?

Will there be loss

of housing?

Will there be loss

of incomes, or

businesses ? and

livelihoods?

Will access to

facilities,

services, or

resources be lost

Is the no of

people affected

directly and

indirectly

known?

Will any social

or economic

activities be

affected by land

use related

changes?

Will water be

affected?

Page 67: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

59

Will any social

or economic

activities be

affected by land

use related

changes?

Will the

involuntary

resettlement be

conducted in

accordance with

World Bank

Safeguard

Policy?

Will the

involuntary

resettlement be

conducted in

accordance with

Gambia

Government

legislation

provisions

regarding

resettlement?

Will there be loss

of crops, trees,

forest, and other

fixed assets?

Are the most

vulnerable

people affected?

Women,

children, elderly,

people with

disabilities

Is there any legal

or social disputes

that are not

resolved?

Are the people

affected

involved?

Does the PCU

have the capacity

Page 68: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

60

to execute plan?

Are the capacity

building

requirements to

execute this plan

fulfilled?

Is there budget

allocated for the

plan?

Annex 7 consultations with communities

A team comprising consultants, staff from department of Agriculture and other agriculture project

staff went on a consultative visit to stake holders and also visited other project sites and potential

sites for this project. The team met farmers (men and women) in communities, extension workers,

community leaders, land owners and regional directors. Below are dates and communities visited.

Date Site/Community Region/Site Main Issue(s) Person (s) Remarks

15.11.2013 Nuimi Lamin NBR Vegetable cold store Adama Touray Discussed gender and resettlement policy. Also discussed on challenges they faced operating the cold store. Store not functional at the time of visit.

15.11.2013 Chamen Nianija CRR North 1. Possibility of 2 crop/year Tidal irrigation 2. Access bridge to fields

Chief and village elders

Potential constraint is saline intrusion to make 2 crop/year impossible. also discussed lack of tools for women and the fact that if there is need for involuntary land acquisition affected persons will be duly and fairly compensated. However community members confirmed that there will be no need to acquire new land as the existing land cannot even be all used.

15.11.2013 Kuntaur Wassu CRR North Potential available area for tidal irrigation

Asst Regional Agric. Director (RAD) Jammeh

Region a potential area for GCAVMP intervention,

16.11.2013 Janjanbureh CRR –Prisoners’

A modified pump irrigated perimeter to

Commissioner of Prisons -

These rice fields were modified from pump

Page 69: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

61

Rice field tidal irrigated scheme Janjanbureh irrigated to tidal flooding by reducing height of embankment to allow tidal flow into the fields because it is cheaper than pump irrigation. In the process of “cutting” to reduce the height of the land to allow tidal flooding the top soil was removed and this could expose unsuitable soil type.

16.11.2013 Sankulay Kunda CRR South Possibility of rehabilitating abandoned pump irrigated rice fields to “test” new concept of management by a group

May be developed within the GCAVMP

16.11.2013 Boiram CRR South Review operations and performance of small scale rice milling 1. Sited in the village among residents 2. Equipment seemed well maintained but excessive husks piled up, apparently not usable. 3. Husks used to fill up crater left in the yard during mud block making. 4. Husks are sometimes used as manure in rice fields 5. Where no one else needs it in village, the piles are burnt away 6. Bran is sold out to as animal feed

Operator Mainly Chinese models capable of cleaning 100 bags paddy (x 50 kg) in 8 hours (625kg/hr. Produces 50 kg bran from 4 bags (200 kg) of paddy rice.

16.11.2013 Sapu Agriculture Station

CRR South 1. Mainly tidal irrigation scheme 2. Constraints – ineffective farmer organizations; need

Ayib Touray - RAD Ansumana Njie-Agronomist

The milling machine is Chinese made capable of doing 700kg/hr (cleaned and bagged and ready for market)

Page 70: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

62

capacity building of farmer organizations; weak input supply ; Low yields – 1-2 tons/ha; 3. Need in-service training for Extension staff 4. Water borne d illnesses due to impoundment of fields 5. Surrounding communities make use of national Malaria Control Program – bed nets, etc. 6. Rice milling machine

Siting is well away from habitation, and consequently noise pollution will not be an issue Apparently not in operation now (no barn/husks observed) but waste generated is treated much the same way as in Boiram

16.11.2013 Touba Demba Sama CRR South Currently tidally irrigated (approx. 95 ha). Catchment includes 9 other communities ( Demba Sama, Misira, Kanunku, Sambel Kunda, Wellingara, Karantaba, Yida and Banni

Woman President- Maimuna Ceesay

Issues: hippo threats; tsetse flies; clogging of canals by overgrown grass–habors snakes, mosquitoes, disclosed the existence of a RP

17.11.2013 Kanwally WCR Development of Horticulture garden –LHDP 1. 5 ha fenced area; 2. Infrastructure (water tank-75,000L), processing area for grading, sorting and cleaning; borehole; reticulation system.

1.

President of the women vegetable Kafo

Apparently poor soil condition; Community using cattle to provide manure disclosed the existence of a gender and Re settlement Policy, there is no waiting shed for child minders and pregnant women

17.11.2013 Tampoto WCR 1.Newly developed area for horticulture 2. GALDEP provided : processing equipment to handle tomato; solar powered water supply system; inputs 3.Processing area has processing

The women president

1.The first attempt of the community to work on a project of this type 2. Low soil fertility 3. Will need training in: gender, waste management; pesticide and fertilizer use

Page 71: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

63

Annex 8 budget template Amount or

number/quantity

Total estimated cost Agency responsible

Asset acquisition

Land

Structures

Crops and economic

trees

Infrastructure

Land Acquisition

and preparation

Land

Structures

Crops and other

Community

Infrastructure

Relocation

Transfer of

possessions

Installation costs

Economic

rehabilitation

Training

Capital Investment

Technical Assistance

Monitoring

Contingency

Total

Based on the outcomes from the above discussed activities, the consultant will ensure that

all values for lost assets are based on current market rates, by square meter, at new replacement

cost, not taking into account any depreciation as per the requirements of WB (OP 4.12).

Annex 9 sample Entitlement costing matrix of project affected people

Compensation for land Compensation for structure Compensation for crops & trees

Compensation for other assets & loses (wells, schools, grave yards..

TOTAL

Quantity Unit price GMD

Entitlement GMD

Quantity Unit price GMD

Entitlement GMD

Quantity Unit price GMD

Entitlement GMD

Quantity Unit price GMD

Entitlement GMD

Bibliography 1 Constitution of the Republic of the Gambia, 1997

Page 72: FOR THE GAMBIA COMMERCIAL AGRICULTURE AND VALUE …documents.worldbank.org › curated › en › ... · GCAVMP The Gambia Commercial Agriculture and Value Chain Management Project

64

2 Environmental Impact Assessment Guidelines 1999

3 Land Acquisition and Compensation Act, 1991

4. Lands Commission Act 2007

5 Lands (Provinces) Act

6. National Environmental Management Act 1990

7 Physical Planning and Development Control Act, 1991

8. Republic of Iraq-Regional Government of Kurdistan Transport Corridors Project:

resettlement policy framework for Roads corridors

9 Republic of Kenya Resettlement Policy Framework Natural Resource Management

Project (NRMP) (2001)

10 Resettlement policy framework for the Gambia growth and

Competitiveness project Gambia investment promotion & free zones agency (GIPFZA)

the gateway project (2009)

10 State Lands Act,1991

11. Surveys Act 1991