    Principle of CBS

    Basic idea is to provide a matrix of nm sets of contacts with only

    n+m activities or less to select one of nm sets of contacts

    Figure

    There is an array of horizontal and vertical wires shown by solid

    lines

    A set of vertical and horizontal contact points are connected to these wires

    The contact points form a pair

    Each pair consisting of a bank of three or four horizontal and corresponding

    bank of vertical oints

    A contact point pair act as a Cross Point (CP) switch, and remain

    separated or open when not in use

  • 8/7/2019 TSS-S4

    2/11

  • 8/7/2019 TSS-S4

    3/11

    T e contact points are mec anica y mounte an e ectronica y

    insulated on a set of horizontal and vertical bars (HB & VB)

    shown b dotted lines

    These bars are attached to a set of electromagnet

    The corresponding bar rotates & make the connection

    ons er t e examp e o as s own n gure.

    It shows 6 subscribers with HB representing inlet and VB the outlet

    Try for establishing the following connection in sequence:

    A to C and B to E

  • 8/7/2019 TSS-S4

    4/11

  • 8/7/2019 TSS-S4

    5/11

    T e CP AC atc es y energizing first y HB A an t en VB C

    Now for BE, when HB B energizes, BC may latch

    -

    This can be prevented by introducing an energizing sequence

    for latchin

    A CP latches only if the HB is energized first, and then the VB

    In this way, BC will not latch.

    Then for completing BE connection, the VB E needs to be

    energized

    energized

    This should also be avoided, and is done by providing the de-energizing

  • 8/7/2019 TSS-S4

    6/11

    T us after e-energizing A, t e energizing of E wi atc t e

    CP BE

    Thus, the following procedure should be followed for theestablishing a connection in a CBS:

    nerg ze nerg ze

    Energize VB OR Energize HB

    - -

  • 8/7/2019 TSS-S4

    7/11

    w tc on gurat on:

    In a nonblocking CB configuration, there are N2 SE for N users

    ,

    connection establishment

    two given subscribers

    It depends upon who initiates the call

    e.g., when A wishes to call B, it uses CP AB

    while, when B wishes to call A, it uses CP BA

    Thus, by designing a suitable control mechanism, only one switchmay be used to establish a connection between two subscriber

    .

  • 8/7/2019 TSS-S4

    8/11

    ,with N2/2 switches

    We can also eliminate the diagonal CP as it connect the same node

    The call establishment procedure still follows the same pattern

    i.e. HB ener izes first then VB but irres ective of who calls

    Thus the number of CP then reduces to N(N-1)/2 s num er a so represen u y connec e ne wor

    But, this number is still very large to be practical

    t can e re uce s gn cant y y proper es gn ng

  • 8/7/2019 TSS-S4

    9/11

    The CB hardware ma be reduced b connectin two subscribersto a single bar

    and letting the bar turn in both direction i.e., clockwise and anticlockwise

    With such an arrangements, the number of CB reduces, but the

    In the blocking CBS, the number of VB is less than the number of

    . , ,

    Energize HB A

    Energize VB P

    De-energize HB A

    Energize HB B

    Ener ize VB P

    De-energize HB B

  • 8/7/2019 TSS-S4

    10/11

  • 8/7/2019 TSS-S4