13
21.6 A B C D E F G H 17.0 16.2 15.5 11.5 10 9 8 7 6 5 4 3 2 0.5 19.7 17.9 17.5 20.5 L M N P Q R S T W 22 18 17 15 13 12 V 11 21 19 1 9.5 12.5 14 16 14.2 12.7 12.2 20 16.5 U DEMO REFERENCE PACKAGE 1 MECHANICAL ROOM 001B PACKAGE 2 SCOPE OF WORK 40x18 58x14 22x16 14x12 46x18 46x18 58x14 UP 24x20 UP 20x18 UP 18x10 UP 46x18 UP 46x18 UP 5" CHWR 5" CHWS 4" HWR 4" HWS 3" HWR 3" HWS 03 EF 3 AHU 3 EF 1 AHU (E) (E) (E) 1 CU 2 CU (E) (E) 1 EF 1 SF 2 EF 2 SF (E) (E) (E) (E) 5 CC 5 SU (E) (E) 1 2 TUNNEL 1 HP 5 EF (E) 15x8 15x8 20x10 28x10 35x10 9x8 24x10 24x10 12x12 8x10 10x10 18x10 2" CHWR 2" CHWS 3" HWR 3" HWS 1 1/4" HWR 1 1/4" HWS 5" CHWR 5" CHWS 4" HWR 4" HWS 2 1/2" HWR 2 1/2" HWS 1" HWS 1" HWR 2" CHWS 2" CHWR 2" HWS 2" HWR (E) (E) DEMOLISH PIPING IN TUNNEL DEMOLISH PIPING INTUNNEL 3 CAP T T T T T T 4 5 6 HX (E) 7 2" HWR 2" HWS 1 1/2" CHWR UP 1 1/2" CHWS UP (1970's) (1960's) MECHANICAL ROOM 046B (BAT CAVE) MECHANICAL ROOM 038 CU 1 (E) 8 8 1 1/2" HWS 1 1/2" HWR 3/4" HWS 3/4" HWR 1/2" HWS 1 1/4" HWS 1 1/2" HWR (RADIATOR LOOP) (COIL LOOP) (RADIANT FLOOR LOOP) 22x20 44x14 UP 28x12 UP 42x14 UP 28x12 26x20 26x14 14x10 12x8 DEMOLISH HEATING COIL AND THROTTLING DAMPER (E) (E) VAV 02 VAV 01 3" HWS UP 3" HWR UP 4" CHWS UP 4" CHWR UP 1 1/4" HWS UP 1 1/4" HWR UP engineers for a sustainable future TM www.glumac.com Job. No.: Contact: ISSUE DATE: PROJECT NO.: CHECKED BY: REVISIONS These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited. SERA ARCHITECTS COPYRIGHT 2012 900 SW Fifth Ave., Suite 1600 Portland, OR 97204 T. 503.227.5280 F. 503.274.7674 02.13.00545 JOSH CHECKIS E R B M E M O R I A L U N I O N - R E N O V A T I O N & A D D I T I O N P A C K A G E 4 1 0 0 % C O N S T R U C T I O N D O C U M E N T S 2014.08.01 7/30/2014 4:10:50 PM DM100 11045 DEMO PLAN - GROUND LEVEL FLOOR PLAN - HVAC UNIVERSITY OF OREGON 13TH AVENUE & UNIVERSITY STREET SCALE: 1/16" = 1'-0" 1 DEMO PLAN - GROUND LEVEL FLOOR PLAN - HVAC SHEET NOTES # KEYED NOTES A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK, PIPING, ETC IN EXISTING BUILDING IS SHOWN FOR REFERENCE AND IS DEVELOPED THROUGH REFERENCE OF EXISTING BUILDING AS-BUILT DOCUMENTATION AND SITE WALKS. WHERE PROJECT INVOLVES INTERFACE WITH EXISTING BUILDING AND SITE SYSTEMS, EVERY EFFORT HAS BEEN MADE TO NOTE EXISTING UTILITIES AND SERVICES. HOWEVER, THE CONTRACTOR SHOULD THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND BE AWARE THAT IN SOME CASES INFORMATION IS NOT AVAILABLE FOR CONCEALED CONDITIONS, WHICH EXIST IN PORTIONS OF THE EXISTING BUILDING AFFECTED BY THIS WORK. NOTIFY OWNER, ARCHITECT, AND ENGINEER OF EXISTING CONDITIONS DISCOVERED DURING THE DEMOLITION PHASE. B THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS, ELEVATIONS, AND THE STRUCTURAL AND OTHER CONTRACT DRAWINGS AND SHALL COORDINATE WORK WITH THAT OF THE OTHER TRADES TO AVOID INTERFERENCE. THE PLANS ARE DIAGRAMMATIC AND SHOW GENERALLY THE LOCATIONS OF THE FIXTURES, EQUIPMENT, AND PIPES AND ARE NOT TO BE SCALED; ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED IN THE FIELD. C REFERENCE DM600 SERIES DRAWINGS FOR ONE LINE DOCUMENTION OF SYSTEM DEMOLITION REQUIREMENTS. D THE ENTIRE 1970'S ADDITION AND ASSOCIATED SERVICES SHALL BE DEMOLISHED. REFER TO NOTES FOR SELECTED AREAS WHERE SYSTEMS IN THE 1970'S BUILDING ARE REQUIRED TO MAINTAIN THE SERVICES OF THE EXISTING BUILDING TO REMAIN. COORDINATE WITH OWER FOR EQUIPMENT, VALVES, ETC THAT MUST BE RETURNED TO OWNER FOR REUSE. E THE ENTIRE 1960'S ADDITION HVAC SERVICES SHALL BE DEMOLISHED EXCEPT WHERE NOTED. F EXISTING THERMOSTATS ARE ONLY PARITIALLY SHOWN ON THESE DRAWINGS. CONTROLS CONTRACTOR SHALL LOCATE ALL (E) THERMOSTATS AND SENSORS IN (E) BUILDING TO DETERMINE FINAL SENSOR REPLACEMENT SCOPE OF WORK AS PART OF THE DESIGN BUILD CONTROLS SCOPE. REPLACE ALL SENSORS IN (E) AREAS WITH (N) SENSORS AS PART OF DESIGN. 1 COORDINATE CAMPUS UTILITY SHUTDOWN WITH UNIVERSITY. INSTALL 4" SHUT OFF VALVES IN CAMPUS CHILLED WATER SUPPLY/RETURN BRANCH PIPING SERVING THE 1970 ADDITION. DEMO CHILLED WATER PIPING DOWNSTREAM OF VALVES TO THE 1970 ADDTION. 2 COORDINATE CAMPUS UTILITY SHUTDOWN WITH UNIVERSITY. INSTALL A 4" SHUT OFF VALVE IN CAMPUS STEAM BRANCH PIPING SERVING THE 1970 ADDITION. DEMO STEAM PIPING DOWNSTREAM OF VALVE TO THE 1970 ADDTION. DEMO CONDENSATE PIPE BACK TO THE LOCATION OF THE STEAM SHUT OFF VALVE PROVIDE TEMPORARY CAP FOR FUTURE CONDENSATE CONNECTION. 3 PACKAGE 2 SCOPE: DEMOLISH 1 1/4" CHWS/R TO THIS POINT IN BASEMENT. PROVIDE (N) 1 1/2" CHILLED WATER PIPING UP TO AHU-2. SEE M600 SERIES FOR MORE DETAILS 4 DEMOLISH ALL MECHANICAL DUCTWORK, PIPING AND EQUIPMENT IN THIS ROOM. DEMOLISH STEAM/CONDENSATE & CHILLED WATER PIPING BACK TO BUILDING ENTRY. SCOPE INCLUDES SUPPLY FANS, EXHAUST FANS, HEAT EXCHANGER, HEATING PUMPS, EXPANSION TANK, CONDENSATE PUMPS. SEE PLUMBING DRAWINGS ADDITIONAL DEMO SCOPE AND EXISTING EQUIPMENT TO REMAIN. 5 CHILLED WATER BUILDING ENTRY LOCATION 6 STREAM & CONDENSATE BUILDING ENTRY LOCATION 7 STACKED HEATING PUMPS 8 RAISE (E) HYDRONIC PIPING TO ROUTE ABOVE "O LOUNGE" CEILING HEIGHT. COORDINATE HEIGHT WITH (E) HYDRONIC MAIN RISER LOCATION & (N) DUCTWORK RISERS INSTALLED IN PACKAGE 4 ABOVE (N) TELECOM ROOM. 0 32 48 64 16 1/16"-1'-0"

P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

DEMO

REFERENCE PACKAGE 1

MECHANICAL ROOM001B

PACKAGE 2 SCOPE OF WORK

40x18

58x1

4

22x16

14x12

46x1

8

46x1

8

58x14 UP

24x20 UP

20x18 UP18x10 UP

46x18 UP

46x18 UP

5" CHWR5" CHWS4" HWR4" HWS

3" HWR3" HWS

03

EF

3

AHU

3

EF

1

AHU

(E)

(E)

(E)

1

CU

2

CU

(E)

(E)

1

EF

1

SF

2

EF

2

SF

(E)

(E)

(E)

(E)

5

CC

5

SU(E)

(E)

1

2

TU

NN

EL

1

HP

5

EF

(E)

15x8

15x8

20x1

028

x10

35x1

0

9x8

24x1

024

x10

12x12

8x10

10x10

18x1

0

2" CHWR2" CHWS

3" HWR3" HWS1 1/4" HWR1 1/4" HWS

5" CHWR

5" CHWS4" HWR

4" HWS2 1/2" HWR2 1/2" HWS1" HWS1" HWR

2" CHWS2" CHWR2" HWS

2" HWR

(E)

(E)

DEMOLISH PIPING IN TUNNEL

DE

MO

LIS

H P

IPIN

G IN

TU

NN

EL

3

CAP

T

T

T

T

T

T

4

5

6

HX

(E)

7

2" HWR2" HWS

1 1/2" CHWR UP

1 1/2" CHWS UP

(1970's)

(1960's)

MECHANICAL ROOM046B

(BAT CAVE)

MECHANICAL ROOM038

CU

1(E)

8

8

1 1/2" HWS

1 1/2" HWR

3/4" HWS

3/4" HWR

1/2" HWS

1 1/4" HWS

1 1/2" HWR

(RADIATOR LOOP)

(COIL LOOP)

(RADIANT FLOOR LOOP)

22x20

44x14 UP28x12 UP

42x14 UP28x1226x20

26x14

14x10

12x8

DEMOLISHHEATING COILANDTHROTTLINGDAMPER

(E) (E)VAV

02

VAV

01

3" HWS UP3" HWR UP4" CHWS UP4" CHWR UP1 1/4" HWS UP1 1/4" HWR UP

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:10:5

0 P

M

DM100

11045

DEMO PLAN -GROUND LEVELFLOOR PLAN -HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - GROUND LEVEL FLOOR PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 COORDINATE CAMPUS UTILITY SHUTDOWN WITHUNIVERSITY. INSTALL 4" SHUT OFF VALVES INCAMPUS CHILLED WATER SUPPLY/RETURN BRANCHPIPING SERVING THE 1970 ADDITION. DEMOCHILLED WATER PIPING DOWNSTREAM OF VALVESTO THE 1970 ADDTION.

2 COORDINATE CAMPUS UTILITY SHUTDOWN WITHUNIVERSITY. INSTALL A 4" SHUT OFF VALVE INCAMPUS STEAM BRANCH PIPING SERVING THE 1970ADDITION. DEMO STEAM PIPING DOWNSTREAM OFVALVE TO THE 1970 ADDTION. DEMO CONDENSATEPIPE BACK TO THE LOCATION OF THE STEAM SHUTOFF VALVE PROVIDE TEMPORARY CAP FOR FUTURECONDENSATE CONNECTION.

3 PACKAGE 2 SCOPE: DEMOLISH 1 1/4" CHWS/R TOTHIS POINT IN BASEMENT. PROVIDE (N) 1 1/2"CHILLED WATER PIPING UP TO AHU-2. SEE M600SERIES FOR MORE DETAILS

4 DEMOLISH ALL MECHANICAL DUCTWORK, PIPINGAND EQUIPMENT IN THIS ROOM. DEMOLISHSTEAM/CONDENSATE & CHILLED WATER PIPINGBACK TO BUILDING ENTRY. SCOPE INCLUDESSUPPLY FANS, EXHAUST FANS, HEAT EXCHANGER,HEATING PUMPS, EXPANSION TANK, CONDENSATEPUMPS. SEE PLUMBING DRAWINGS ADDITIONALDEMO SCOPE AND EXISTING EQUIPMENT TOREMAIN.

5 CHILLED WATER BUILDING ENTRY LOCATION

6 STREAM & CONDENSATE BUILDING ENTRYLOCATION

7 STACKED HEATING PUMPS

8 RAISE (E) HYDRONIC PIPING TO ROUTE ABOVE "OLOUNGE" CEILING HEIGHT. COORDINATE HEIGHTWITH (E) HYDRONIC MAIN RISER LOCATION & (N)DUCTWORK RISERS INSTALLED IN PACKAGE 4ABOVE (N) TELECOM ROOM.

0 32 48 6416

1/16"-1'-0"

Page 2: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

UP

DN

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

DEMO

PACKAGE 2 SCOPE OF WORK

30x7

16x8

16x6

34x10

22x12

18x8

18x8

18x8

18x8

18x8

18x8

18x8

18x12

12x9

10x6

24x1

218

x12

12x1

216

x5

10x8

44x14 UP42x14 UP

22x36 UP

20x24 UP

20x18 UP

10x18 UP

40x26 UP

12x18 UP 12x18 UP

18x18 UP

24Ø UP

14x14 DN

28x12 DN

16Ø UP

16Ø UP

10

SF

10

RF

(E)

(E)

12x30 UP12x30 UP12x30 UP30x8 UP18x18 UP27x24 UP

4x8

14x6

28x8

20x8

30x8

1"

1 1/4"

1

2

1/2" HWR

1/2" HWS

1/2" HWR

1/2" HWS

1/2"

1/2"

T

T

T

T

T

T

T

T

T

1 1/2" CHWR UP & DN

1 1/2" CHWS UP & DN

1 1/2" HWS UP & DN

1" HWR UP & DN

1 1/2" HWR UP & DN

3/4" HWS DN

8x6

6x6

8x8 UP

FCU

1(E)

3

EF

1(E)

(E) RADIANT SLAB

(E) RADIANT SLAB

(E) RADIANT SLAB

4

28x1

2

3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:10:5

8 P

M

DM101

11045

DEMO PLAN -LEVEL 1 FLOORPLAN - HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 1 FLOOR PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 DEMOLISH ALL HOT WATER HEATER PIPING ANDRADIATORS IN THIS FIRST FLOOR NORTH AREA.

2 DEMOLISH HOT WATER PIPING BACK TO SHAFTAND CAP.

3 DEMOLISH PIPING BACK TO MAIN.

4 REMOVE (E) HOOD & CAP DUCTWORK UP AT SLABPENETRATION. REPAIR (E) HORIZONTAL DUCT TOAVOID FUTURE GREASE ACCUMULATION.

0 32 48 6416

1/16"-1'-0"

Page 3: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

DEMO

MECHANICAL ROOM142D

PACKAGE 2 SCOPE OF WORK

54x16

26x12

16x12

39x17

44x19

54x14

54x14

20x1

0

20x1

422

x14

11x1011x88x8

14x1

2

14x1

2

16x18

10x18

15x18

REFERENCE PACKAGE 1

40x36 22x24

20x16

16x16

16x12

16x7

54x16 UP

20x18 UP

22x36 UP

30x18 UP

20x20 UP

20x20 UP

28x16 UP

12x16 UP

18x16 UP

10x10 UP

12x10 UP

28x26 UP

28x28 DN

28x28 DN

18x18 DN

40Ø

22Ø

22Ø

40Ø UP01

EF

(E)

1

SU

2

SU

3

SU

4

SU

2

EF

4

EF

1

EF

5

EF

3

EF

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E) (E)

02

MUA

(E)

03

KEF

(E)

12x6

12x6

19x1

212

x12

24x20 UP

22x2

412

x24

10x8

40x2

6

1 1/4" HWS

1 1/4" HWR

1/2" HWS1/2" HWR

1 1/2" HWS UP & DN

1" HWR UP & DN1 1/2" HWR UP & DN

14x14

18x17

21x12

106x24

90x2

4

6x6

(E)04

KEF

0 2

EF(E)

16x1

2

16x1

2

16x12

15x8

14x6

18x1

4

1 1/4" HWR DN

3/4" HWR UP & DN3/4" HWS UP & DN

1" HWS1" HWR

1 1/2" HWR DN1 1/2" HWS DN

T

14x6 MIXINGDAMPERS

9x15 MIXINGDAMPERS

10x15 MIXINGDAMPERS

10x15 MIXINGDAMPERS

10x15 MIXINGDAMPERS

9x15 MIXINGDAMPERS

7x6 MIXINGDAMPERS

2

1

1

1

1

1

1

1

44x14 UP & DN

42x14 UP & DN1 1/2" CHWR UP & DN1 1/2" CHWS UP & DN

T T

T

T

T

3

3

3

24x14

4400CFM

5

5

5

DN

CAP

CAP

CAP

H.C.

3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:11:0

5 P

M

DM101m

11045

DEMO PLAN -MEZZANINELEVEL PLAN -HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - MEZZANINE LEVEL PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 DEMOLISH (E) DAMPERS AND CONTROLS.

2 KEEP EXHAUST FAN FOR (N) DESIGN. CONTROLPER BMS PER SPECIFICATIONS.

3 DEMOLISH (E) RADIATORS ALONG ENTIREPERIMETER SOUTH & EAST WALLS. DEMOLISHVALVES & CAP PIPING BEHIND WALL.

4 PROVIDE ACCESS PANELS IN ENCLOSURE & DUCTFOR GREASE CLEANOUT. TYPICAL EVERY 20'

5 DEMOLISH GRILLE & CAP DUCTWORK. DUCTWORKTO REMAIN FOR (F).

0 32 48 6416

1/16"-1'-0"

Page 4: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

DEMO

PACKAGE 2 SCOPE OF WORK

7x8 17x8 20x12 16x12 17x8 7x8

12x818x1222x12

28x12

12x8

32x12

13x12

20x10

40x20

40x20

7x10

10x1

014

x10

18x1

022

x10

14x7

20x7

20x7

17x7

7x7

26x14

13x14

38x9

22x9 38x9

28x15

23x15

15x15

15x10

40x20 UP

13x14 UP

18x48 UP

26x14 UP

18x14 UP

19x15 UP

21x15 UP

20x15 UP

20x20 UP20x20 UP15x22 UP

21x14 UP

38x22 UP

20x20 UP

20x20 UP

28x16 DN

20x20 DN20x20 DN30x30 DN

40Ø UP & DN

3

TU

4

TU

1

TU

2

TU

5

TU

6

TU(E)

(E)

(E)

(E)(E)

(E)

02

KEF

01

MUA

(E)

(E)

6x14

ø8

ø8

14x6 UP

6x14 UP

14x6

18x16 UP

24x12 UP

15x10 UP

15x10 DN

3/4" HWR DN3/4" HWS DN1 1/4" HWR DN

3/4" HWR1 1/2" HWS

1" HWS

3/4" HWR

28x1430x16

12x1

0

20x8

28Ø14Ø

12Ø

10x10

12Ø8Ø

20Ø

14x7

7x7

26x732

x822

x10

18x1

014

x10

10x1

07x

10

25x4

13x15

12x1

27x

12

21x1

4

20x15

28x1528x15

1

T

T

T

T

12x10 M.D.

15x10 M.D.

12x10 M.D.

24x10 M.D.

12x10 M.D.

2

PNEUMATIC SHUT-OFF DAMPER

T

TT

1 1/2" CHWS1 1/2" CHWR

1 1/2" CHWS DN

1 1/2" CHWR DN

4

1 1/2" CHWR1 1/2" CHWS

DISHWASHER LOCATION

3

3

3

3

3

3

12x10

19x10

12x10

12x10

9x9

9x9

9x9

9x9

9x9

9x9

23x15

15x15

T

CAP

FCU

2(E)

5

-

KEF(E)

CU

-(E)

28x26 UP & DN

28x26 UP

(E) RADIANT SLAB

CAP

3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:11:1

4 P

M

DM102

11045

DEMO PLAN -LEVEL 2 FLOORPLAN - HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 2 FLOOR PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 ABANDON HEATER IN PLACE AND CAP PIPING.

2 PNEUMATIC SHUT-OFF DAMPERS CONTROL SWITCHIN RM 219.

3 DEMOLISH DAMPER, ACTUATOR & PNEUMATICS.CAP DUCT TAP FROM REMOVED MAIN.

4 LOCATION OF (E) PUMP ASSEMBLY SERVING AHU - 2CHILLED WATER COIL

5 DEMOLISH PIPING BACK TO MAIN

0 32 48 6416

1/16"-1'-0"

Page 5: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

DEMO

PACKAGE 2 SCOPE OF WORK

-

AC

-

AC

-

AC

-

AC

-

AC

-

AC

-

AC

-

AC

-

AC

-

AC

03

MUA

1

FC

60x30 UP

20x15 UP

21x14 UP

20x20 UP

12x16 UP

15x8 UP

21x40 UP

20x20 UP

20x20 UP

15x22 UP

14x8 UP

25x29 UP

25x25 UP

36x22 UP

54x36 UP

10x7 UP

20x20 DN

38x22 DN

20x20 DN

21x14 DN

36x22

15x8

15x8

28x1

6

42x24

42x24

36x14

36x4

636

x32

36x16

36x56

36x26

(E)

(E)

(E)

(E) (E)

(E)

(E) (E)

(E)(E)

(E)

(E)

(E)

1

24x1

4

24x2

4

14x6

ø12 ø12

ø10

ø8

ø8

14x6

26x26

26x26

20x10 20x10

48x2

4

48x2

4

10x6

14Ø

6x6

24x24 UP

14x6 DN14x6 DN

10x1

0

10x10

15x10 UP

3" HWS DN

4" CHWS DN4" CHWR DN

3" HWR DN

2

3

T

T

T

T

-

AC

(E)

8x8

12x8

MECHANICAL ROOM

4 4

4

4

4

2

AHU

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:11:2

1 P

M

DM103

11045

DEMO PLAN -LEVEL 3 FLOORPLAN - HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 3 FLOOR PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 PACKAGE 2 SCOPE: AHU IS SERVED BY CHILLEDWATER PIPING FROM THE 1970 ADDITION.DEMOLISH PIPING AS SHOWN ON DM603 ANDDM604. ROUTE (N) PIPING TO AHU FROM CHILLEDWATER MAIN IN BASEMENT OF 50S BUILDING.REBALANCE PUMP FOR NEW HEAD LOSSCONDITIONS TO MAINTAIN (E) PRE-TAB REPORTPERFORMANCE.

2 DEMOLISH ALL MECHANICAL EQUIPMENT INMECH ROOM. BEFORE WORK BEGINSCOORDINATE WITH UO FACILITIES WHATEQUIPMENT SHOULD BE RETURNED TO OWNERFOR REUSE.

3 DEMOLISH ALL WINDOW AC UNITS IN THIS AREA.DEMOLISH (E) RADIATORS IN THIS AREA.DEMOLISH VALVES & CAP PIPING BEHIND WALL.SEE 600 SERIES FOR COUNTS.

4 DEMOLISH (E) RADIATORS ALONG ENTIREPERIMETER WALLS. DEMOLISH VALVES & CAPPIPING BEHIND WALL. SEE 600 SERIES FORCOUNTS.

0 32 48 6416

1/16"-1'-0"

Page 6: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

21.6

A B C D E F G H

17.0

16.2

15.5

11.5

10

9

8

7

6

5

4

3

2

0.5

19.7

17.9

17.5

20.5

L M N P Q R S T W

22

18

17

15

13

12

V

11

21

19

1

9.5

12.5

14

16

14.2

12.7

12.2

20

16.5

U

PENTHOUSE400

1

9

SF

(E)

9

EF

(E)

2

RTU

1

RTU

(E)

(E)

(E)

5

SF

5

EF

6

SF6

EF

(E)

(E)

(E)

(E)

40Ø DN

40Ø DN

03

MUA(E)

01

MUA

02

KEF

(E)

(E)

(E)

04

KEF(E)

2

(E)

(E)

(E)

(E)

SF

1

RTU

-

EF

-

EF

-

-

KEF(E)

KEF

01

1

FC(E)

2

AHU

CU

-(E)

EF

-

engineers for a sustainable futureTM

www.glumac.com

Job. No.:

Contact:

ISSUE DATE:

PROJECT NO.:

CHECKED BY:

REVISIONS

The

se d

raw

ings

and

thei

r co

nten

t are

the

prop

erty

of S

ER

A A

rchi

tect

s In

c. a

nd a

re to

be

utili

zed

on th

is p

roje

ct. R

epro

duct

ion

of a

ny p

art o

f thi

s m

ater

ial,

with

out t

he e

xpre

ss w

ritte

n pe

rmis

sion

of S

ER

A A

rchi

tect

s In

c. is

pro

hibi

ted.

SE

RA

AR

CH

ITE

CT

S C

OP

YR

IGH

T 2

012

900 SW Fifth Ave., Suite 1600

Portland, OR 97204

T. 503.227.5280 F. 503.274.7674

02.13.00545

JOSH CHECKIS

ER

B M

EM

OR

I AL

UN

ION

- R

EN

OV

AT

ION

& A

DD

ITI O

N

PA

CK

AG

E 4

100%

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

2014.08.01

7/3

0/2

014 4

:11:2

8 P

M

DM110

11045

DEMO PLAN -ROOF PLAN -HVAC

UN

IVE

RS

ITY

OF

OR

EG

ON

13T

H A

VE

NU

E &

UN

IVE

RS

ITY

ST

RE

ET

SCALE: 1/16" = 1'-0"1DEMO PLAN - ROOF PLAN - HVAC

SHEET NOTES

#KEYED NOTES

A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.

B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.

C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.

D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.

E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.

F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.

1 DEMOLISH MECHANICAL UNITS, DUCTWORK, PIPING, ETCIN PENTHOUSE.

2 (E) ELEVATOR OVERRUN & EQUIPMENT TO REMAIN.

0 32 48 6416

1/16"-1'-0"

Page 7: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING AIRSIDE DEMO SCHEMATIC 1948 BUILDING2

EXISTING AIRSIDE DEMO SCHEMATIC 1961 ADDITION1

EXISTING AIRSIDESCHEMATIC

DM601

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

SHEET NOTES

Page 8: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING AIRSIDESCHEMATIC

DM602

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

EXISTING AIRSIDE DEMO SCHEMATIC 1972 ADDITION1

SHEET NOTES

Page 9: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING CHILLED WATER SCHEMATIC 1961 ADDITION1

EXISTING CHILLEDWATERSCHEMATIC

DM603

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

EXISTING CHILLED WATER SCHEMATIC 1970'S ADDITION2

SHEET NOTES

KEYED NOTES

Page 10: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING CHILLED WATER SCHEMATIC 1948 BUILDING1EXISTING CHILLEDWATERSCHEMATIC

DM604

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

SHEET NOTES

KEYED NOTES

Page 11: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING HEATING WATER DEMO SCHEMATIC 1961 ADDITION1

EXISTING HEATINGWATERSCHEMATIC

DM605

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

SHEET NOTES

KEYED NOTES

Page 12: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

EXISTING HEATING WATER DEMO SCHEMATIC 1948 BUILDING1

EXISTING HEATINGWATERSCHEMATIC

DM606

SHEET NOTES KEYED NOTES

Page 13: P:ArchitectureH45C-Design CoordinationBIMEMU ARCH jodih

EXISTING HEATING WATER DEMO SCHEMATIC 1972 ADDITION1

EXISTING HEATINGWATERSCHEMATIC

DM607

ISSUE DATE:PROJECT NO.:

CHECKED BY:

REVISIONS

Thes

e dra

wing

s and

their

conte

nt ar

e the

prop

erty

of SE

RA A

rchite

cts In

c. an

d are

to be

utiliz

ed on

this

proje

ct. R

epro

ducti

on of

any p

art o

f this

mater

ial, w

ithou

t the e

xpre

ss w

ritten

perm

ission

of S

ERA

Arch

itects

Inc.

is pr

ohibi

ted.

SE

RA

AR

CH

ITE

CTS

CO

PY

RIG

HT

2012

ERB

MEM

OR

IAL

UN

ION

- R

ENO

VATI

ON

& A

DD

ITIO

NPA

CK

AG

E 4

2014.08.01

100%

CO

NS

TRU

CTI

ON

DO

CU

ME

NTS

9/19

/201

3 7:

54:2

6 A

M

11045

UN

IVE

RS

ITY

OF

OR

EG

ON

13TH

AV

EN

UE

& U

NIV

ER

SIT

Y S

TRE

ET

SHEET NOTES

KEYED NOTES