    Dpartmenet fdral de lenvironnement, des transports,

    de lnergie et de la communication DETEC

    Ofiice fdral de lnergie OFEN

    D:\SecureDATA\Forschungsprogramme\TP0067 F-Wasserkraft\01 laufend\P103094 Sedimentation in Pumped Storage Plants\V154102 Sedimentation in Pumped

    Storage Plants\Berichte\Titelseite Rapports annuel 2009.doc

    Rapport annuel 2009

    Mthodes d'observation et de prvisionde l'alluvionnement des retenues desamnagements de pompage-turbinage

    Sustainable sedimentation in pumpedstorage plants

  • 8/13/2019 000000290084

    2/26

    D:\SecureDATA\Forschungsprogramme\TP0067 F-Wasserkraft\01 laufend\P103094 Sedimentation in Pumped Storage Plants\V154102 Sedimentation in PumpedStorage Plants\Berichte\Titelseite Rapports annuel 2009.doc

    Mandant:Office fdral de lnergie OFENProgramme de recherche Force hydrauliqueCH-3003 Bernewww.bfe.admin.ch

    Cofinancement:Competence Center for Energy and Mobility CCEM-CH, CH-5232 Villigen PSI

    Mandataire:Ecole Polytechnique Fdrale de Lausanne EPFLLaboratoire de Constructions Hydrauliques LCHStation 18CH-1015 Lausannelchwww.epfl.ch

    Auteurs:Michael Mller, EPFL-LCH, [email protected]

    Prof. Dr. Anton Schleiss, EPFL-LCH, [email protected]

    Responsable de domaine de lOFEN: Dr. Michael MoserChef de programme de lOFEN: Dr. Klaus JordeNumro du contrat et du projet de lOFEN:154102 / 103094

    Lauteur de ce rapport porte seul la responsabilit de son contenu et de ses conclusions.

    http://www.bfe.admin.ch/http://www.yz.ch/mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]://www.yz.ch/http://www.bfe.admin.ch/
  • 8/13/2019 000000290084

    3/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller i

    Table of contents

    Rsum et motivation ..................................................................................................................... iiZusammenfassung und Motivation .............................................................................................. ivSummary and motivation .............................................................................................................. vi1 Recall ........................................................................................................................................ 12 State of the art and contribution of the PhD project ............................................................ 2

    2.1 State of the art .................................................................................................................... 22.2 Contribution of PhD project ................................................................................................ 2

    3 Research plan and main objectives (overview) .................................................................... 34 Results: Flow fields in front of Grimsel II intake/outlet ........................................................ 4

    4.1 Description of prototype ...................................................................................................... 44.2 Measuring device ............................................................................................................... 54.3 Analysis of velocity data ..................................................................................................... 54.4 Next steps of data evaluation ............................................................................................. 7

    5 Outlook ..................................................................................................................................... 85.1 Turbidity monitoring at Grimsel II power plant .................................................................... 85.2 Physical scaled model ........................................................................................................ 85.3 Numerical models ............................................................................................................... 85.4 Project timetable schedule ................................................................................................. 95.5 Follow-up of the project ...................................................................................................... 9

    6 References ............................................................................................................................. 107 Appendix ................................................................................................................................ 10

  • 8/13/2019 000000290084

    4/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller ii

    Rsum et motivation

    Mots cls : Amnagement de pompage-turbinage, sdimentation des rservoirs, turbulence,

    coulements devant une prise, turbidit, ADP, mesures sur prototype, modlisationphysique, modlisation numrique, gomtrie des prises d'eau

    La sdimentation des rservoirs est un des problmes majeurs de l'ingnierie hydraulique duXXIme sicle. A l'chelle mondiale, les rservoirs cres par des barrages se remplissent desdiments un taux d'environ 1 % de leur volume utile par anne. En plus de ces pertes devolume, les sdiments peuvent s'accumuler devant les ouvrages essentiels des amnagements, mentionner les prises d'eau et les vidanges de fond. Ainsi, les processus de sdimentationaffectent srieusement non seulement la fiabilit et la dure de vie des amnagementshydrolectriques, mais aussi la scurit d'un point de vue d'exploitation et structurale. En outre,une concentration importante en sdiments dans l'eau passant par les turbines et les pompes

    produit l'abrasion de ces machines.Les rservoirs alpins suisses subissent d'un taux de sdimentation de 0.2 % et sont donc plusdurable du point de vue volume de stockage. Nanmoins, aprs 40 60 annes d'exploitation, lesprocessus de sdimentation deviennent une menace cause des courants de turbidit. Cescourants de turbidit apparaissent pendant des priodes de fortes prcipitations et transportent,sous forme d'une avalanche sous-marine, des grandes quantits de sdiments en direction dubarrage o les dpts concentrs bloquent les ouvrages de vidange de fond et affectent lascurit oprationnelle de ces derniers.

    En plus de leur fonction comme bassin d'accumulation pour des amnagements hydrolectriques,les rservoirs sont souvent un lment essentiel dans la protection contre les crues. Ils mettent disposition un volume de stockage intermdiaire important, et donc permettent de laminer les

    crues et de protger la population et les infrastructures situes l'aval. La perte de volume parsdimentation rduit cette capacit de laminage. Par consquence, elle met en danger nonseulement l'exploitation adquate d'un systme de production nergtique, mais toute une rgion l'aval des rservoirs cause de la perte des possibilits de laminage.

    En Suisse, le bassin versant du Rhne est un bel exemple d'une rgion compose de toute unesrie d'amnagements hydrolectriques qui, avec leurs rservoirs artificiels, font partie d'unsystme complexe de laminage de crues. Une perte de ces bassins d'accumulation aura deseffets catastrophiques sur la valle du Rhne lors des vnements de crues.

    D'autres domaines d'utilisation des rservoirs sont galement concerns par les pertes de volume,notamment les fonctions de stockage d'eau pour l'approvisionnement en eau potable et pourl'irrigation. La sdimentation aggrave la future pnurie d'eau mondiale en rduisant la capacit des

    rservoirs dj dvelopps.

    Afin de satisfaire la demande nergtique croissante, les projets d'amnagementshydrolectriques de pompage-turbinage gagnent d'importance l'chelle suisse et mondiale. Detels projets se composent gnralement d'un rservoir suprieur et infrieur afin de pomper et/outurbiner l'eau entre ces derniers. Les problmes de sdimentation long terme de ces rservoirssous l'influence des changements oprationnels rpts entre les modes de turbinage et depompage sont relativement peu connu.

    En analysant des aspects de sdimentation tels que les concentrations dans tout le systme d'unamnagement et l'influence des alternations modales de pompage-turbinage sur les vitessesd'coulement et la turbidit dans les rservoirs, le projet de recherche propos examinera dessolutions pour garantir la scurit des ouvrages d'vacuation et la durabilit long terme des

    amnagements de pompage-turbinage.

  • 8/13/2019 000000290084

    5/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller iii

    Une rponse aux questions principales suivantes aimerait tre trouv: comment le processus depompage-turbinage affecte-t-il la turbulence dans le rservoir ainsi que la sdimentation par desparticules fines? Comment peut-on influencer la turbulence par la gomtrie de la prise d'eau afinde rduire le dpt des sdiments fins?

    Dans le cadre d'une thse, ce projet de recherche traitera les points suivants:

    Une tude de littrature indiquera les paramtres d'intrt primordial du problme et lespistes conqurir.

    L'tablissement des bases thoriques permettra de dcrire les processus physiquesprincipaux derrire les diffrents phnomnes en question.

    Des mesures sur prototype de longue dure permettront d'analyser la concentration ensdiments dans les conduites en charge d'un systme de pompage-turbinage (mesures deturbidit) et les conditions d'coulements devant une prise d'eau en lac (mesures devitesse d'coulement).

    La modlisation physique chelle rduited'un rservoir de gomtrie simple servira debase pour dterminer l'influence des paramtres comme la dure de pompage/turbinage,

    le dbit et la forme de l'ouvrage de restitution sur les processus de sdimentation. Lors d'une modlisation numriqueles conditions du prototype et les essais en laboratoire

    seront simuls.

    L'analyse des mesures sur modle et prototypesera employe afin de vrifier les modlesthoriques et pour calibrer les modles numriques.

    Bas sur l'analyse des rsultats des essais, le dveloppement de modle thoriquedcrivant le comportement long terme du transport et des dpts sdimentaires dans desrservoirs exploits par des amnagements de pompage-turbinage sera effectu

    Des rgles et recommendations de conception nouvelles et innovatrices pour la gestiondurable de la sdimentation des amnagements pompage-turbinage seront dfinies. En

    particulier il sera tudi comment les ouvrages d'entre et de sortie doivent tre conuspour obtenir un champ de turbulence favorables dans la retenue dans le but de rduire leprocessus de l'alluvionnement des sdiments en suspension.

    Rapport de thseetpublications scientifiques

  • 8/13/2019 000000290084

    6/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller iv

    Zusammenfassung und Motivation

    Stichwrter : Pumpspeicheranlagen, Verlandung von Stauseen, Turbulenz, Strmungsfelder in

    Becken, Trbung, ADP, Prototypmessungen, hydraulische Modellversuche,numerische Modellversuche, Geometrie von Ein- und Auslaufbauwerken

    Die Verlandung von Stauseen ist eines der anspruchsvollsten Probleme des Wasserbaus des21. Jahrhunderts. Weltweit verlieren knstlich angelegte Staubecken jhrlich rund 1 % ihresnutzbaren Speichervolumens. Zustzlich zu diesen Kapazittsverlusten knnen sichAblagerungen vor wichtigen Elementen wie Einlaufbauwerken oder Grundablssen bilden. Sobeeinflussen Sedimentationsprozesse in Speichern nicht nur ernsthaft die Zuverlssigkeit und dieLebensdauer von Wasserkraftanlagen, sondern auch die Kontinuitt der Energieproduktion unddie Sicherheit der Bauwerke. Zudem nutzen hohe Partikelkonzentrationen im Wasser, welches dieTurbinen und Pumpen durchluft, diese Maschinen ab.

    Die Stauseen in den Schweizer Alpen weisen eine niedrigere Verlandungsrate von 0.2 % auf undsind folglich nachhaltiger im Bezug auf das verfgbare Speichervolumen. Trotzdem werden dieAblagerungsvorgnge nach 40 bis 60 Betriebsjahren aufgrund von so genannten Trbestrmen zueiner Gefahr. Diese Trbestrme treten vor allem nach starken Regenfllen auf undtransportieren, in Form einer Unterwasserlawine, grosse Mengen von Sedimenten in RichtungStaumauer, wo die kompakten Ablagerungen den Grundablass blockieren und dessen sicherenBetrieb gefhrden.

    Zustzlich zu ihrer Funktion als Staubecken fr Wasserkraftwerke spielen die Speicher hufig einewesentliche Rolle im Hochwasserschutz eines Einzugsgebietes. Sie stellen ein grossesZwischenspeichervolumen zur Verfgung und erlauben dadurch, Hochwasserspitzen zureduzieren und die Bevlkerung und Infrastrukturen unterhalb der Anlage zu schtzen. Der Verlust

    von Speichervolumen durch Verlandung reduziert diese Hochwasserentlastungskapazitt. Folglichgefhrden die Ablagerungsprozesse nicht nur die Stromproduktion, sondern eine ganze Regionunterhalb der Stauseen aufgrund des Verlusts der Rckhaltemglichkeiten whrendHochwasserperioden.

    Das Rhonebecken bildet ein sehr gutes Beispiel fr ein Einzugsgebiet in der Schweiz, welchesdurch eine Reihe von Wasserkraftwerken gekennzeichnet ist. Diese Anlagen sind, mit Ihrenknstlich angelegten Speichern, ein Teil eines komplexen Hochwasserschutzsystems. Ein Verlustdieser Speichermglichkeit htte bei Hochwasser katastrophale Auswirkungen auf das Rhonetal.

    Weitere Anwendungsbereiche von Stauseen, beispielsweise die Speicherung von Wasser zurTrinkwasserversorgung oder zu Bewsserungszwecken, sind ebenfalls von Sediment-ablagerungen betroffen. So verschrft der Kapazittsverlust von bestehenden Speicheranlagen

    durch Sedimentation die zuknftige weltweite Wasserknappheit.

    Um die steigende Energienachfrage zu befriedigen werden Pumpspeicheranlagen sowohl in derSchweiz, wie auch weltweit stets wichtiger. Solche Projekte bestehen im Allgemeinen aus einemoberen und unteren Reservoir, zwischen welchen das Wasser turbiniert oder gepumpt wird. Dielangfristigen Ablagerungsprozesse solcher Speicher unter Einfluss von stetig wechselnden Pump-und Turbiniersequenzen sind im Vergleich zur Sedimentation in herkmmlichen Kraftwerkenverhltnismig unbekannt.

    Dieses Forschungsprojekt wird den Einfluss des abwechselnden Pumpspeicherbetriebes auf diePartikelkonzentrationen im System einer Anlage, sowie auf die Strmungsbedingungen und dieTrbung in den Staubecken untersuchen. Damit sollen Lsungen zu einem langfristigen undnachhaltigen Sedimentmanagement in Pumpspeicherkraftwerken gefunden werden.

  • 8/13/2019 000000290084

    7/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller v

    Auf folgende Hauptfragen sollen Antworten gefunden werden: Wie beeinflusst derPumpspeicherbetrieb die Turbulenz im Becken und die Ablagerung von Feinsedimenten? Wiekann die Turbulenz durch die Geometrie der Ein- und Auslaufbauwerke beeinflusst werden, umdas Absetzen feiner Sedimente zu reduzieren?

    Im Rahmen einer Doktorarbeit wird das vorliegende Projekt folgende Arbeitschritte beinhalten:

    Eine Literaturstudie zeigt relevante Parameter auf und gibt Forschungsanreize.

    Die Erarbeitung von theoretischen Grundlagen erlaubt, die physikalischen Vorgnge derverschiedenen Phnomene zu beschreiben.

    Messungen im Prototyp werden ber mehrere Monate durchgefhrt, um diePartikelkonzentration in den Druckleitungen von einem Pumpspeicherwerk zu analysieren(Trbesonde) und die Strmungsbedingungen vor einem Ein- und Auslaufbauwerk im Seezu bestimmen (Geschwindigkeitsmessungen).

    Hydraulische Modellversuche in einem einfachen Becken erlauben, den Einfluss diverserParameter, wie zum Beispiel der Dauer der Pumpspeichersequenzen, des Abflusses oderder Form des Auslaufes, auf die Ablagerungsvorgnge im Speicher zu untersuchen.

    Im numerischen Modell werden sowohl die Labormessungen, wie auch der Prototypsimuliert.

    Die Auswertung der Daten aus Labor- und Prototypmessungen werden bentigt, um dietheoretischen Modelle zu berprfen und die numerischen Modelle zu eichen.

    Basierend auf dieser Versuchsauswertung erfolgt die Entwicklung eines theoretischenModelles, welches das langfristige Verhalten von Sedimenttransport undAblagerungsprozessen beschreibt.

    Neue und innovative Auslegungsregeln fr die nachhaltige Nutzung von Stauseen, welchevon Pumpspeicheranlagen genutzt werden, werden vorgeschlagen. Insbesondere wird derFrage nachgegangen, wie die Ein- und Auslaufbauwerke gestaltet werden mssen, damit

    eine gnstige Turbulenz im Stausee erreicht werden kann, welche das Absetzen derFeinsedimente verhindert.

    Dissertation undPublikationen

  • 8/13/2019 000000290084

    8/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller vi

    Summary and motivation

    Keywords : Pumped storage hydropower plant, reservoir sedimentation, turbulence, flow fields

    in reservoirs, turbidity, ADP, prototype measurements, physical modeling, numericalmodeling, geometry of intake and outlet structures

    Sedimentation of dam reservoirs is one of the most challenging problems of the XXIstcentury inhydraulic engineering. On a worldwide scale, dam reservoirs silt up at a rate of about 1 % of theiruseful storage volume every year. Furthermore, sediments can settle in front of essential elementsof hydropower schemes, such as intake structures or outlet works. Thus, sedimentation processesseriously affect not only the reliability and the lifetime of hydropower structures, but also theirstructural safety. In addition, important sediment concentration in water passing through turbinesand pumps produce significant abrasion of these machines.

    The mean annual sedimentation rate of the Swiss Alpine reservoirs is around 0.2 % and therefore

    much lower than the worldwide one. Thus, the Swiss Alpine reservoirs are more sustainable fromthe point of view of storage volume. Nevertheless, after 40 to 60 years of operation thesedimentation process becomes a real threat due to the turbidity currents. These turbidity currentsoccur especially during high precipitation and they transport, like an underwater avalanche, bigamounts of sediments down to the dam, where the concentrated deposits block the outlet worksand affect their safe operation.

    In addition to their purpose of water storage for hydropower production, dam reservoirs are oftenan important element for flood protection strategies. They provide an intermediate storage andpermit to reduce flood peaks and therefore to protect downstream population and infrastructures.Storage loss reduces this flood protection capacity and consequently endangers not only thereliability of the energy production system, but an entire region downstream of the reservoirs due

    to reduced flood protection.

    In Switzerland, the Rhone River basin is a perfect example for a region characterized by a seriesof hydropower schemes along the main stream and its tributaries. With their artificial reservoirs,the power plants play an important role in a complex flood protection system. The loss of suchstorage would result in catastrophic affects on the whole Rhone Valley in case of floods.

    Other fields of exploitation of reservoirs, namely storage of drinking and irrigation water, areconcerned by sedimentation processes which lead to reduced capacity. Sedimentation thusaggravates future worldwide water scarcity by reducing the storage from already developedsupplies.

    To satisfy a continuously increasing energy demand, pumped storage hydropower projects

    become more and more relevant on a worldwide scale. Such projects generally consist of anupper and a lower reservoir in order to pump and/or turbine water between them. Long-termsedimentation issues of such reservoirs due to fast and repeated change of operations betweengenerating and pumping modes are relatively unknown compared to traditional hydropowerschemes.

    Studying sedimentation issues such as concentrations throughout the whole scheme andinfluences of pumping/generation modes on flow fields and turbidity in the reservoirs, the proposedPhD project will examine solutions to guarantee long-term sustainability of pumped storagehydropower plants.

  • 8/13/2019 000000290084

    9/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller vii

    The following main questions are to be answered: how does the pumping and generating activityaffect turbulence in the reservoir and sedimentation process by fine sediments? How could beinfluenced the turbulence by the geometry of intakes and outlets in order to reduce settling downthe fine sediments?

    The thesis will be structured in the following main subtasks:

    A literature studywill point out the main parameters of interest of the problem.

    Theoretical basiswill be outlined based with the main goal to describe the main physicalprocesses behind the different phenomena in question.

    Prototype measurements will be performed on an existing pumped storage hydropowerproject. At the pressurized shaft/tunnel, sediment concentration during pumping andgenerating will be measured and measurements of flow velocity near the intake/outletstructures will be carried out.

    Physical scaled modelingwill concentrate on particle exchange rates and settling rates insimple reservoir geometry. Influences of the duration of pumping and generating mode, thedischarge and the shape of the outlet jet will be analyzed.

    Analysis of model and prototype measurements will be used to verify theoreticaldevelopments and to calibrate numerical models.

    Numerical modelingwill allow to simulate both prototype and laboratory tests.

    The development of theoretical modelwill be based on the analysis of the test results. It willdescribe long-term behaviour of sediment transport and deposition in a pumped storagehydropower scheme.

    New and innovative design guidelinesfor sediment sustainability of pumped storage powerplants submitted to severe hydraulic transients due to market constraints will be defined. Inparticular, the question of how to design intake and outlet structures in order to obtainfavorable turbulences in the reservoir in order to reduce settling down of the suspended

    sediments will be studied. Dissertation report andscientific publications

  • 8/13/2019 000000290084

    10/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 1

    1 RECALL

    Modern power plants are expected to operate at variable speed in a wide range of output powerwith improved efficiency, flexibility and safety. Therefore, the pumped storage power generationhas gained in importance since it allows storing and generating electricity to supply high peak

    demands by moving water back and forth between reservoirs at different elevations.A project consortium called HydroNet Modern Methodologies for Design, Manufacturing andOperation of pumped storage power plantshas been built aiming to converge towards a consistentstandardized methodology for design, manufacturing, operation, monitoring and control of pumpedstorage power plants in order to give new impulsions in the hydropower technology and maintainthe strong position of Switzerland in peak hydropower production as well as in the exportation ofhigh valued technology. HydroNet is funded by the Competence Center Energy and Mobility(CCEM) and swiss electric research.

    The Laboratory of Hydraulic Constructions (LCH), as one of the partners of the HydroNetconsortium, contributes with two PhD thesis in the civil engineering field. The present projectconsists in the description and the control of sedimentation issues in the reservoirs of pumped

    storage plants (Figure 1.1). Such storages are submitted to frequent exchanges of water duringpumping and generating modes. The influence of alternating pumped storage activity and thegeometry of the basin and the intake/outlet structures on the sedimentation processes are to beexamined in prototype measurements, as well as in physical and numerical modeling.

    Figure 1.1 : HydroNetproject consortium partners and main objectives

    HYDRONET

    (EPFL - LCH)

    ECOLOGY ISSUES

    CIVIL ENGINEERING

    (EAWAG)

    HYDRODYNAMIC

    (EPFL - LMH)

    ELECTRICITY

    (EPFL - LME)

    OPTIMUM DESIGN AND

    OPERATION OF PUMPED

    STORAGE POWER PLANTS

    Control & Monitoring

    Downstream ecological

    effects of particles

    Physical & Chemical

    change of particles

    Motor-Generator optimization

    Transient Behaviour (SIMSEN-Hydro)

    UMP Monitoring

    Control strategies for

    variable speed

    CONTROL & MONITORING

    - Instrumentation of existing power plant

    - Data collection and storage

    - Signal processing data mining

    - Validation of monitoring methods

    - Predictive maintenance

    - Non-intrusive instrumentation

    - Profitability optimization (Economy)

    Pressurized waterways

    Sedimentation

    Civil EngineeringFlow induced vibration

    Unsteady behaviour &

    hydro acoustic

    Control & Monitoring

    Rotor-Stator

  • 8/13/2019 000000290084

    11/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 2

    2 STATE OF THE ART AND CONTRIBUTION OF THE PHD PROJECT

    2.1 State of the art

    The state of the art in the field of reservoir sedimentation has been established based on aliterature review (refer to references given in the report entitled Demande de subside submittedto OFEN by the end of 2008).Sedimentation issues in traditional hydropower plants are quite well described, sediment transporttheory and the main measures against reservoir sedimentation are developed. However, not all ofthose measures are sustainable, efficient and affordable. There is a strong need to limit sedimentaccumulation in reservoirs in order to ensure their sustainable use. Measures can be taken in thecatchment area, in the reservoir or at the dam. A sustainable sediment strategy should alsoinclude the downstream reaches; therefore monitoring data should also include downstreamimpacts as well as sedimentation processes in the reservoir.An integrated approach to sediment management that includes all feasible strategies is required tobalance the sediment budget across reservoirs. The complete sediment problem and applicationof the range of sediment strategies as appropriate to the site has to be analyzed. The dam andother hydraulic structures have to be operated in a manner consistent with the preservation of

    sustainable long-term benefits.The fields of study concerning turbulence phenomena, behaviour of out-flowing jets or large scalevorticity are under investigation by the PhD candidate.

    2.2 Contribution of PhD project

    In contrary to traditional hydropower plants, the link between sedimentation problems and themore recent pumped storage hydropower projects remains poorly treated.

    Due to pumped storage operations suspended sediments are transferred from one reservoir of thesystem to the other. These sequences can create additional input of sediment and even artificialreservoirs with any natural sediment supply can fill up and suffer from storage losses. As the

    pumped storage activity is growing, flow conditions in the reservoir are alternating from one stateto another during relatively short laps of time.

    What are the effects of such changes between pumping and generating mode on the flow fields inreservoirs and consequently the behaviour of sediments? How toes the pumping/generatingactivity affect turbulence in the reservoir and sedimentation process by fine sediments? How couldbe influenced the turbulence by the geometry of intakes and outlets in order to reduce settlingdown the fine sediments?

    Furthermore, how do parameters like discharge or duration of alternating pumping and generatingmode affect the sedimentation processes in a reservoir? Can we predict sedimentation processesby controlling concentrations within the pipes relying two lakes? Are there conceptual solutionsduring the operation time of a pumped storage plant which allow to use the alternating pumping

    and generating activities in order to positively influence the reservoir sustainability? These aresome of the questions which are considered in the framework of this PhD thesis which will end tosome practical applications, mainly:

    New design guidelines for sediment sustainability of pumped storage power plantssubmitted to severe hydraulic transients due to market constraints.

    Development of new theoretical model based on the analysis of the test resultsdescribing the long-term behaviour of sediment transport and deposition in a pumpedstorage hydropower scheme.

    Relevant monitoring methodsin order to predict sediment behaviour and concentrationsthroughout the whole scheme and for different hydraulic functions of the system.

  • 8/13/2019 000000290084

    12/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 3

    3 RESEARCH PLAN AND MAIN OBJECTIVES (OVERVIEW)

    The research plan of this project has been submitted to the Director of the Doctoral Program inEnvironment by November 2008. It was accepted by the dean of the doctoral school of the EPFLin early January 2009. The main objectives and an overview of the methodology followed duringthe PhD thesis is given hereafter.

    The present research aims to develop solutions guaranteeing sustainable sediment managementin pumped storage hydropower plants by answering the following key question: how can we usethe turbulence introduced by the pumping and generating activity for hindering the suspendedsediments to be settled?

    The work will be structured in the following main subtasks :

    Literature concerning reservoir sedimentation, sediment transfer through pressurizedpipes and tunnels and flow patterns close to water intakes and power station outletchannels is investigated.

    Theoretical basis may include theory on sedimentation of reservoirs, especially thoseareas close to water intakes and turbine outlet channels, theory on transport capacity in

    pressurized systems, etc. The goal of this stage is to describe the main physical processesbehind the different phenomena in question.

    Prototype measurementshave been performed on the pumped storage hydropower plantGrimsel II, Switzerland. Flow velocities in front of the intake/outlet structure in Lake Grimselhave been recorded during three weeks and at three different locations near the intake.The pressurized shaft will be equipped with a turbidity measurement device in order toacquire prototype-scaled measurements of sediment concentration during pumping andgenerating, as a function of discharge, head, or hydraulic transients.

    Physical scaled modeling which consists of a simple reservoir where the influence ofintake/outlet position, duration of pumping and generating mode, the discharge and theshape of the outlet jet can be analyzed. The turbulence due to pumping and generating

    mode will be described as a function of inlet/outlet geometry.

    Analysis of model and prototype measurements that will be used to verify theoreticaldevelopments and to calibrate numerical models. Detailed analysis of test results and acomparison with theoretical developments will allow the determination of adequacy andefficiency of the theoretical model.

    Numerical modeling will allow to simulate both prototype and laboratory tests.

    Development of theoretical modelbased on the analysis of the test results describing thelong-term behaviour of sediment transport and deposition in a pumped storage hydropowerscheme.

    New and innovative design guidelines for sediment sustainability of pumped storagepower plants submitted to severe hydraulic transients due to market constraints will bedefined. We aim to describe the influence on turbulence by intake and outlet geometry for acertain reservoir geometry.

    Dissertation report and scientific publications

  • 8/13/2019 000000290084

    13/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 4

    4 RESULTS: FLOW FIELDS IN FRONT OF GRIMSEL II INTAKE/OUTLET

    Prototype measurements and monitoring are an important part of the CCEM HydroNetproject. Incollaboration with the Kraftwerke Oberhasli AG (KWO) such data recording is carried out atGrimsel II pumped storage plant situated in the Central Alps of Switzerland (Figure 4.1). Theunderground powerhouse of this pumped storage scheme exploits water of the upper reservoir

    Lake Oberaar (2303 m a.s.l.) and the lower reservoir Lake Grimsel (1909 m a.s.l.).

    Figure 4.1 : Situation of the pumped storage scheme Grimsel II

    With the objective of recording flow velocities in front of the intake/outlet structure of Lake Grimsel,prototype measurements were carried out in autumn 2008. Such measurements allow to observeeventual influences of the alternating pumping and generating modes between the upper and thelower reservoirs on the flow, as well as the influence of the geometry of the intake/outlet structure.

    4.1 Description of prototype

    The Lake Grimsel intake/outlet is characterized by a tulip-shaped structure embedded in a recessof the lake topography with its foundation platform situated at a level of 1942 m a.s.l. A verticalpressure conduit of 7.5 m in diameter ejects water into a lateral open cylinder equipped with tenguiding walls which distribute the out-flowing discharge equally on the ten side openings of thetulip (Figure 4.2).

    Figure 4.2 : Schematic plan view (left) and cross section (right) of the intake/outlet structure of the

    Grimsel II plant

    Pressurizedshaft

    Lower reservoir:Lake Grimsel

    Upper reservoir:Lake Oberaar

    Inlet/Outlet

    Grimsel 2power plant

    Q

    Q

  • 8/13/2019 000000290084

    14/26

    Sustainable

    EPFL LC

    To the Wedirection olevel. Themeasurem

    Th

    rec Th

    strprowo

    Ththe

    Fig

    4.2 Me

    The AcouGrimsel reinstrumentwater. Usipassing aand contrsounder.temperatusystem of

    looking poin order toindicates t

    4.3 An

    During theweekdays.resultingConseque(generatin

    drawdownprovided ain order t

    1s

    Inlet/

    sedimentat

    Michael

    st, the intaf dam Spitte conditioent configu

    alignmen

    ollect dataimplemen

    cture andfiler and lirks.

    minimalinstrument

    re 4.3 : Pos

    asuring d

    tic Doppleservoir botemits anng the phyove the prlled by thhe mome

    re and Easa two plan

    sition. Twoknow at w

    he beginni

    alysis of v

    first meas. In Novein measuntly, charag mode du

    along thell relevantcontrol t

    measurement

    Outlet

    ion in pump

    Mller

    e/outlet isllamm, ths and theration (Fig

    of the thr

    in a probabtation of th5 m beloits interfer

    istance ofs.

    itions of th

    vice

    Profiler dtom are acoustic si

    sical princiofiler. The

    measurent the de-North-vele articulati

    angles relat momeng of a relia

    locity dat

    urement caber 2008,

    ement pecteristic ping the da

    eek, pumata relatee pressur

    November 200

    d storage pl

    surroundereservoirimplementre 4.3):

    ee profilers

    le main dire instrume the horiznce betwe

    50 m betw

    ADP-devi

    vices (ADle to recornal whichple of Dopcorrect posment of thice is cocity comp

    on allows t

    ted to vertithis positible recordi

    a

    mpaign invelocity p

    riods ofmped stor, pumping

    ing activityto the Gri recordin

    Measure

    2n

    meas

    8

    lants

    by relativottom is fltion criteri

    in the axi

    ction of thts in a mintal intak

    en the emi

    een two p

    es (left); p

    , Figure 4.d flow velis reflectepler shift,ition of the

    water denected tonents. Who orientate

    cal and horn stabilizeg period.

    Septemberrofiles haix (1stcaage cycleat night) a

    during wesel II pla of the A

    ent Septemb

    rement Nove

    ly steep rot and situafor the A

    s of one o

    out-flowinimal distan axis guated beam

    ofilers limit

    eparation o

    3, right) thacities overback to t

    he ADP cADPs waspth at thethe batte

    en the ADthe meas

    izontal posis. A consta

    2008, thee been rpaign) a

    could bed midterm

    kends). Dt, namelyPs. The

    r 2008

    ber 2008

    N

    Rap

    ck slopested almostP devices

    the ten o

    g jet.ce of 25 mantees and the con

    s sidelobe

    f an ADP-in

    t have beea periode profilerlculates thdetermineloweringy, it startreaches tring devic

    tions are rnt value of

    measuremcorded ald eightgathered,

    sequences

    ring the mischarge aoppler Pr

    port d'avan

    nd to the10 m belo, lead to th

    tlet sector

    from the istable posicrete civil

    interferen

    strument (r

    n implemef severaly the partie velocity

    by GPS foint by m recordinge reservoi in an exa

    corded bythese two

    nt periodo during

    days (2ndincluding(successiv

    easuring pnd Lake Gofilers reco

    ement 2009

    Page 5

    ast, in thethe intake

    e following

    s allows to

    take/outlettion of thengineering

    e between

    ight)

    ted on theeeks. Thecles in theof the flowrom a boatnual echo pressure,r bottom, act upward-

    the device,arameters

    as of fourweekends,ampaign).

    short terme reservoir

    riod, KWOimsel levelrd velocity

  • 8/13/2019 000000290084

    15/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 6

    components on every meter of the water column, in a time interval of 5 minutes. Thus, timedependent, three-dimensional velocity profiles can be generated in the reservoir and giveinformation about flow conditions in front of the intake/outlet structure.

    Figure 4.4 shows two typical flow fields observed during pumping and generating activity inSeptember 2008. In these cases, the flow direction corresponds to the expected main direction of

    the in- and out-flowing jet.

    Figure 4.4 : Velocity profiles in front of the intake/outlet of the Grimsel II plant, September 2008campaign; pumping mode (left), generating mode (outflowing discharge, right)

    However, there are periods, where the orientation of the velocity vectors and the expected maindirection of the jet do not correspond clearly. It has been observed, that the water masses are inmovement even thought there is no pumped storage activity. At first view, no preferentialorientation of the flow direction can be seen. In addition, a second main direction of the velocityvectors (north-northeast) appears during generating and pumping mode, which could point out theinfluence of the lake topography.

    In order to determine whether the recorded velocities are directly correlated to the pumped storageactivity, power spectra of the data series and the discharge data have been compared. Thisapproach, based on the Fast Fourier Transform (FFT) method, is often used in signal processingand allows finding the main frequencies of a data series (Lyons 2004). Figure 4.5 reveals that themain frequencies of the two signals (peaks) are close to each other and therefore foreshadow adirect link between the recorded velocities and the pumped storage discharge.

    xEast[cm]

    xNorth[cm]

    h [m]h [m]

    xNorth[cm]

    xEast[cm]

  • 8/13/2019 000000290084

    16/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 7

    Figure 4.5 : Comparison of power spectra of velocity and discharge data, 1st

    measurementNovember 2008, profiler 1 (to the north of the intake/outlet, Figure 4.3 left)

    4.4 Next steps of data evaluation

    The processes in Lake Grimsel are to be studied in more detail in order to confirm the firstobservations and to understand the ongoing flow phenomena. Therefore a numerical model will becreated, with the simulation of the Grimsel II intake/outlet structure, but also all other hydraulicworks which are supposed to interact with the flow fields in the lake. Additional signal processinganalysis is carried out at the moment in order to detect or reject correlations between the flowvelocities and the in- and out-flowing jet.

    Oehy (2002) constructed a numerical model for the simulation of turbidity currents in Lake Grimsel.This model can be adapted and updated with recent topographical data of the reservoir, providedby KWO and Flotron AG. ANASYS CFX 11, a CFD package including a solver based on finitevolume method and pre- and post processing tools, will then be used for the calculation of flowfields.

    In the framework of a Master of Advanced Studies (MAS) project, Mr. Milahd Daneshvari hasestablished a numerical model of Lake Grimsel in Flow3D, a software allowing simulations ofthree-dimensional flow conditions, multiphase flow and large eddy simulation. The model will becompleted according to the needs of the PhD work and simulations will be run in order to confirmprototype records and CFX calculation.

    By the end of 2009, a first referred publication is aimed to be submitted, including the results andconclusions of the prototype measurements at Lake Grimsel.

    0 0.05 0.1 0.150

    0.5

    1

    1.5

    2

    2.5

    3

    0 0.05 0.1 0.150

    200

    400

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    Velocity

    Discharge

    Frequency [Hz]

    Powerspectrum

    VEast

    Powerspectru

    mQ

  • 8/13/2019 000000290084

    17/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 8

    5 OUTLOOK

    5.1 Turbidity monitoring at Grimsel II power plant

    The installation of a continuous monitoring system on an existing pumped storage plant hasconcretized with in situ visits and several project meetings with KWO collaborators. In order toestimate the suspended load transported between the two reservoirs and to observe the influence

    of the pumped storage activity, turbidity measurements at the pressurized shaft of the Grimsel IIplant are planned. Bhler (2001 and 2002) carried out turbidity measurements at Grimsel I anddetected the arrival of turbidity currents travelling down the Lake Grimsel from its upstream part tothe dam, where the intake of the Grimsel I scheme is situated. In 2004/2005, turbidity recordingshave been carried out by Bhler at Grimsel II. The devices and procedures applied in the presentPhD work could be similar to what has been effectuated during these former studies.Nevertheless, the possibility of putting a turbidity measuring device directly on the pressurizedsystem in collaboration with other PhD students installing monitoring devices (refer to Rapportdavancement 2009 submitted to OFEN by Fadi Hachem) is considered.

    5.2 Physical scaled model

    Physical modeling will concentrate on particle exchange rates and settling rates in a simplereservoir geometry (Figure 5.1). The simplified experimental configuration is chosen in order tounderstand and describe turbulence introduced by pumping or turbining mode.

    In fall or winter 2009 reconstruction work will be effectuated on an existing hydraulic model whichhas been designed for testing the impact of rotational jets on sedimentation in reservoirs (Jenzer2006). Actually, the experimental setup is still being used for this PhD project going on at LCH.First tests on the adapted physical model are expected to take place in early 2010.

    Figure 5.1 : Simplified reservoir geometries to be tested on the physical scaled model;rectangular shape (left), trapezoidal basin (right)

    The physical scaled model aims to test the influence of the intake/outlet position and to change thebasin geometry with simple means. The turbulence and the characteristics of sedimentationbehaviour will then be linked to other parameters susceptible to affect these processes, like theduration of alternating pumping and generating modes, the in- and out-flowing discharge and the

    geometry of inlet/outlet structures. The material used to simulate the sediments in the physicalexperiments will consist of walnut shell powder. This material has been used at the LCH duringformer studies in the research field of sedimentation in shallow reservoirs (Kantoush 2008) andhas been proved to be very well adapted to this problematic.

    5.3 Numerical models

    As it has been mentioned before, numerical simulation of the lower reservoir (Lake Grimsel) of theGrimsel II power plant is about to start in order to compare the field measurements to resultsobtained by numerical flow calculation.

    Both ANSYS and Flow3Dcould be used likewise to simulate the experimental setup. This allows

    testing and estimating the influence of changes in reservoir or intake/outlet geometry, dischargeand duration of pumped storage cycles previously to hydraulic modeling.

    1%Longitudinalslope

    ~3 m

    ~1.5m

    1.2~1.3mWaterintake

    1%

    Transversalslope

  • 8/13/2019 000000290084

    18/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 9

    5.4 Project timetable schedule

    The time schedule of the different project phases that will spread over the next two to three yearscan be given as follows:

    Figure 5.2 : PhD project schedule

    5.5 Follow-up of the project

    Beside the follow-up by the director of this research work, Prof. Anton Schleiss, the PhD thesis isclosely supervised by the senior research associates, Dr Giovanni De Cesare and Dr Jean-LouisBoillat. Accordingly, progress meetings are planned regularly every six weeks, with the three aforementioned people.

    Twice a year, the progress state of the project is presented in the framework of internalconferences at LCH (the first presentation has been given on the 28thof November 2008, thesecond will take place on the 25thof September 2009). Two intermediate reports at the end of thefirst and the second year will be prepared.

    The multidisciplinary CCEM-consortium organizes periodical sessions (two per year), whereinformation is shared, progress is discussed and common future work is defined. By now, threetechnical meetings have taken place.

    Knowledge transfer to practionners will be guaranteed by the organization of workshops.

    Literature study and background theory

    Establishment of research plan

    Acceptance of research plan

    Prototype tests

    Preparation of measurement campaigns

    1stcampaign Lake Grimsel (ADP velocity)

    2nd

    campaign Lake Grimsel (ADP velocity)

    Data acquisition and analysis

    Definition of test parameters

    Site investigation

    Setting up sensors and acquisition data

    Preliminary measurements

    Continuous measurements

    Analysis of test results

    Physical scaled model Model concept and construction

    Preliminary tests and calibration

    Tests

    Analysis of test results

    Numerical calculations

    Lake Grimsel model

    Experimental setup model

    Development of theoretical model

    New design guidelines

    Dissertation reports

    Scientific publications

    2nd

    termProject tasks

    2008 2009 2010 2011

    2nd

    term 1st

    term 2nd

    term 1st

    term 2nd

    term 1st

    term

  • 8/13/2019 000000290084

    19/26

  • 8/13/2019 000000290084

    20/26

    Sustainable sedimentation in pumped storage plants Rapport d'avancement 2009

    EPFL LCH Michael Mller Page 11

    A.1

    Artikel zum 11. JUWI-Treffen, 26. 29. August 2009:

    Monitoring und Vorhersage der Sedimentation in Pumpspeicherwerken

  • 8/13/2019 000000290084

    21/26

    JUWI 2009 Lausanne, 26. 29. August 2009

    11. Treffen junger WissenschafterInnen an Wasserbauinstituten

    Monitoring und Vorhersage der Sedimentation in

    Pumpspeicherwerken

    Michael Mller und Anton Schleiss

    Zusammenfassung

    Wie die Speicher herkmmlicher Kraftwerke sind die Staubecken von Pumpspeicher-anlagen, welche durch die steigende Energienachfrage in der Schweiz und weltweit stets

    an Bedeutung gewinnen, von Verlandungsproblemen betroffen. Doch wie werden dieTurbulenz und die Ablagerung von Feinsedimenten in solchen Speichern durch diestetig wechselnden Pump- und Turbiniersequenzen beeintrchtigt? Wie kann dieTurbulenz durch die Position sowie die Geometrie der Ein- und Auslaufbauwerke

    beeinflusst werden, um das Absetzen von Feinsedimenten zu reduzieren? Diese Fragenwerden in einem Forschungsprojekt untersucht. Ziele, Methodik und erste Resultate vonPrototypmessungen sind im vorliegenden Beitrag beschrieben.

    Abstract

    To satisfy a continuously increasing energy demand, pumped storage hydropowerprojects become more and more relevant on a worldwide scale. As in traditional

    hydropower plants, reservoirs are often affected by sedimentation. Long-termsedimentation issues due to fast and repeated change of operations between generatingand pumping modes are relatively unknown compared to traditional hydropowerschemes. How does the pumping and generating activity affect turbulence in thereservoir and sedimentation process by fine sediments? How could the turbulence beinfluenced by the geometry of intakes and outlets in order to reduce settling down thefine sediments? These main questions are to be examined in a PhD project, whoseobjectives, methodology and results of first prototype measurements are described inthe present paper.

    1. Einleitung

    Die Verlandung von Stauseen ist eines der anspruchsvollsten Probleme des Wasserbausdes 21. Jahrhunderts. Die daraus entstehenden Kapazittsverluste und die Bildung vonAblagerungen vor Einlaufbauwerken oder Grundablssen gefhrden die Zuverlssigkeitund die Lebensdauer der Wasserkraftanlagen sowie die Kontinuitt der Energie-

    produktion und die Sicherheit der Bauwerke.

    Um die steigende Energienachfrage zu befriedigen werden Pumpspeicheranlagensowohl in der Schweiz, wie auch weltweit stets wichtiger. Solche Projekte bestehen imAllgemeinen aus einem oberen und unteren Reservoir, zwischen welchen das Wasserturbiniert oder gepumpt wird. Die langfristigen Ablagerungsprozesse in den Speichern

  • 8/13/2019 000000290084

    22/26

    unter Einfluss von stetig wechselnden Pump- und Turbiniersequenzen sind im Ver-gleich zur Sedimentation in herkmmlichen Kraftwerken verhltnismig unbekannt.

    Im Rahmen des Projekts HydroNet a standardised methodology for pumped storagepower plants forschen schweizweit sieben Institute in den Bereichen Hydrodynamik,Elektronik, Hydraulik, Umwelt und Datentransfer, um Lsungsanstze fr dieberwachung und die Vorhersage relevanter Phnomene in Pumpspeicherkraftwerkenzu finden. Das Laboratoire de Constructions Hydrauliques (LCH) der Ecole

    polytechnique Fdrale de Lausanne(EPFL) beteiligt sich mit einer Forschungsarbeit,die sich mit der Sedimentation in den Speichern solcher Anlagen, insbesondere demEinfluss des Pumpspeicherbetriebs, sowie der Position und der Geometrie des Ein-/Auslaufbauwerkes auf die Turbulenz im Becken beschftigt.

    2. Ziele und Vorgehen

    Um Lsungen fr eine nachhaltige Sedimentbewirtschaftung in Pumpspeicherkraft-

    werken zu entwickeln, soll im Verlauf der vorgestellten Dissertation folgendeSchlsselfrage beantwortet werden: Wie knnen die durch den Pumpspeicherbetriebhervorgerufenen Turbulenzen genutzt werden, um das Absetzen von Feinsedimenten zuverhindern?

    Basierend auf einer Literaturstudie, welche die Bereiche Turbulenz, Sedimentation vonStauseen, Sedimenttransport in Druckleitungen, und Strmungsfelder vor Fassungen

    behandelt, soll eine theoretische Grundlage ausgearbeitet werden, um die wichtigstenphysikalischen Prozesse hinter den relevanten Phnomenen zu beschreiben.

    Auf einer existierenden Kraftwerksanlage werden Prototypmessungen durchgefhrt.Messinstrumente und Wasserentnahmen am Triebwasserweg ermglichen eine Analyse

    der Sedimentkonzentration in Funktion von Durchfluss, Fallhhe, Geschwindigkeits-messungen und somit eine Quantifizierung des Feststofftransports zwischen den beidenBecken. Da die sedimentologischen Phnomene eng mit den Strmungsbedingungen imSee zusammenhngen, werden im Bereich der Wasserfassungen vertikaleGeschwindigkeitsprofile studiert.

    In hydraulischen Modellversuchen werden Sedimentbilanzen sowieAblagerungsprozesse in einfachen Beckengeometrien untersucht. Dabei wird derEinfluss der Dauer des Pumpens resp. Turbinierens, der umgewlzten Wassermengesowie der Position und der Form der Ein-/Auslaufbauwerke analysiert.

    Die numerische Simulation der in Laborversuchen getesteten Geometrien und des

    Prototyps dient zur Besttigung der beobachteten Vorgnge in Prototyp undVersuchsbecken. Dazu werden ANSYS CFX11, sowie Flow3Dverwendet.

    3. Resultate: Strmungsfelder vor dem Ein-/Auslaufbauwerk Grimselsee

    Messungen im Prototyp sowie die Entwicklung von Methoden zum Monitoring und derVorhersage der verschiedenen Phnomene sind ein wichtiger Bestandteil desHydroNet-Projekts. Unter Mithilfe derKraftwerke Oberhasli AG(KWO) werden solche Analysenam Pumpspeicherwerk Grimsel 2 im Berner Oberland, Schweiz, durchgefhrt (Abb. 1).Dieses unterirdisch angelegte Kraftwerk wlzt die Wassermassen zwischen demGrimselsee (1909 m .M.) und dem Oberarsee (2303 m .M.) um.

  • 8/13/2019 000000290084

    23/26

    Abbildung 1: Situationsplan Pumpspeicherkraftwerk Grimsel 2

    Mit dem Ziel, Geschwindigkeiten vor dem Ein-/Auslaufbauwerk im Grimselsee zumessen, wurden im Herbst 2008 erste Prototypmessungen durchgefhrt. DieseAufzeichnungen ermglichen, die Auswirkungen des alternierenden Pump- undTurbinierbetriebs auf die Strmungseigenschaften im Becken, sowie den Einfluss einerspezifischen Geometrie des Auslaufbauwerkes zu beobachten.

    3.1 Beschreibung des PrototypsDas Ein-/Auslaufbauwerk im Grimselsee ist zylinderfrmig mit einem Durchmesservon 21.70 m auf einer Plattform in einer Nische der Seetopographie auf 1942 m .M.eingebettet ist. Das Turbinenwasser gelangt durch einen senkrecht nach obengerichteten Stollen in den Zylinder und strmt radial durch zehn seitliche ffnungenaus, welche durch Leitwnde getrennt sind (Abb. 2).

    Abbildung 2: Grundriss und Aufriss des Ein-/Auslaufbauwerkes im Grimselsee

    Westlich ist das Bauwerk von relativ steilen Felswnden umgeben, im Osten, inRichtung der Talsperre Spittellamm, ist der Seeboden flach und liegt rund 10 m unterder Fassung. Diese Eigenschaften sowie die Anwendungskriterien der Messinstrumente(Abschnitt 3.2), fhren zu folgenden Messkonfigurationen (Abb. 3 links):

    Die Ausrichtung der drei Messsonden in der Achse eines Zylindersektors erlaubtdas Erfassen der vermuteten Hauptrichtung des ausfliessenden Wasserstrahls.

    Die Platzierung der Sonden in mindestens 25 m Entfernung zum Bauwerk sowie

    5 m unterhalb der Auslaufplattform garantiert eine stabile Position der

    Q

    Q

    Druckstollen

    Unterbecken: Grimselsee

    Oberbecken: Oberaarsee

    Ein-/Auslaufbauwerk

    Kraftwerk

    Grimsel 2

  • 8/13/2019 000000290084

    24/26

    Messinstrumente und limitiert die Interferenzen zwischen dem ausgesendetenSignal und dem Bauwerk.

    Der Abstand zwischen den jeweiligen Messgerten von midestens 50 m limitiertdie seitliche Interferenzen zwischen zwei Sonden.

    Abbildung 3: Messpunkte vor dem Ein-/Auslaufbauwerk im Grimselsee (links),

    Vorbereitung der ADP-Sonde (rechts)

    3.2 MesseinrichtungDie auf dem Seegrund platzierte Sonden, sog. Acoustic Doppler Profiler (ADP), sindin der Lage, die Strmungsgeschwindigkeiten ber mehrere Wochen aufzuzeichnen.Das Gert sendet ein akkustisches Signal aus, welches von Partikeln im Wasser zurSonde zurckreflektiert wird, und errechnet die Geschwindigkeiten der Wassermassen

    mit Hilfe des physikalischen Grundsatzes der Dopplerverschiebung. Der Standort derSonden wurde per GPS von einem Boot aus bestimmt und durch eine Messung derWassertiefe mit einem einfachen Echo-Sounder kontrolliert. Im Moment des Absenkenswird der Akku ans Gert angeschlossen, was die Aufzeichnung von Druck, Temperaturund Nord- resp. Ostkomponenten der Strmungsgeschwindigkeit auslst. Erreicht dieSonde den Grund, erlaubt eine doppelachsige Aufhngung die vertikale Ausrichtung derMessoberflche. Das Gert speichert diese Bewegungen in Form zweier Winkel, welchedie horizontale und vertikale Verschiebung im Bezug auf die Waagrechte angeben. Sinddiese beiden Parameter konstant, befindet sich das Messgert in einer stabilen Lage unddie Aufzeichnungen sind zuverlssig. Abbildung 3 (rechts) zeigt eine der verwendetenADP-Sonden.

    3.3 Auswertung der GeschwindigkeitsdatenWhrend der ersten Feldkampagne im September 2008 betrug die Dauer derGeschwindigkeitsmessungen fnf Wochentage. Im November 2008 wurden die Profilezustzlich auch an Wochenenden aufgezeichnet, was eine Messdauer von sechs, resp.acht Tagen ergab. So konnten charakteristische Zyklen erfasst werden, welche sowohlkurzfristige (tags Turbinieren, nachts Pumpen), als auch mittelfristige Sequenzen(sukzessive Entleerung des Speichers im Verlaufe der Woche, Pumpbetrieb an denWochenenden) beschreiben. Die KWO lieferte fr die entsprechenden Periodensmtliche Durchflussdaten und Pegelstnde des Grimselsees zur Kontrolle der ADP-Druckmessung. Die ADP-Sonden messen die Geschwindigkeitskomponenten auf jedem

    Meter der Wassersule bis zur Seeoberflche, in einem Zeitintervall von 5 Minuten. So

    Messreihe Sept. 2008

    2. Messreihe Nov. 2008

    1. Messreihe Nov. 2008

    Ein/Auslauf-

    bauwerk

    N

  • 8/13/2019 000000290084

    25/26

    knnen nach der Extraktion der Daten zeitabhngige dreidimensionaleGeschwindigkeitprofile vor dem Ein-/Auslaufbauwerk generiert werden, die Aufschlussber die Strmungsverhltnisse vor der Fassung geben.

    In Abbildung 4 sind zwei typische Geschwindigkeitsfelder dargestellt, die whrend demPump- resp. Turbinierbetrieb beobachtet wurden. Die Strmungsrichtung entspricht indiesem Falle der zu erwartenden Hauptrichtung der aus- bzw. zustrmendenWassermassen.

    Abbildung 4: Geschwindigkeitsprofile vor dem Ein-/Auslaufbauwerk, Messreihe Sept. 2008;

    Pumpbetrieb (links), Turbinierbetrieb (ausstrmende Wassermassen, rechts)

    Es treten allerdings auch Perioden auf, in denen die Ausrichtung der Geschwindigkeits-vektoren nur bedingt mit der vermuteten Ein-/Austrittsrichtung des Wasserstrahlsbereinstimmt. Unter anderem wird festgestellt, dass die Wassermassen auch whrendPerioden ohne Betrieb in Bewegung sind, wobei eine klare Tendenz derStrmungsausrichtung auf den ersten Blick fehlt. Zudem ist eine zweite Hauptrichtungder Geschwindigkeitsvektoren in Richtung Nord-Nordwesten vorhanden, was auf denEinfluss der Seetopographie hinweisen knnte.

    Abbildung 5: Vergleich der Powerspektren der Geschwindigkeits- und Abflussdaten,

    1. Messreihe Nov. 2008, Profiler 1 (nrdlich des Bauwerkes, Abb. 3 links)

    Um zu bestimmen, ob die gemessenen Geschwindigkeiten in direkter Korrelation mitdem Pumpspeicherbetrieb stehen, wurden die Powerspektren der Messreihen und der

    0 0.05 0.1 0.150

    0.5

    1

    1.5

    2

    2.5

    3

    0 0.05 0.1 0.150

    200

    400

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    0 0.05 0.1 0.150

    100

    200

    300

    400

    500

    600

    Geschwindigkeit

    Durchfluss

    Frequenz [Hz]

    PowerspektrumV

    Ost

    Powerspek

    trumQ

    xOst[cm]

    xNord[cm]

    h [m]h [m]

    xNord[cm]

    xOst[cm]

  • 8/13/2019 000000290084

    26/26